EBUNGE  > 

AI - Page Sitemap

 > 

EBUNGE aluminum movable walls series for hotel

EBUNGE aluminum movable walls series for hotel

EBUNGE aluminum movable walls series for hotel

Model
65 mm movable partition walls
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
5000 square meters
MOQ
No MOQ
Packing Details
Paper cartons, outside with wooden boxes
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Movable partition walls
Feature: Sound proofing
Aluminium frame thickness: Aluminum alloy
Partition material: MDF+Melamine
Finish: Melamine,fabric,leather,glass
Application: Hotel,banquet hall,conference hall,etc.
General use: Office furniture
Material: Aluminum+mdf+melamine
Function: Fireproof and eco-friendly
Size: Can be customized
Color: Can be customized
Style: Sliding
Product Details
BUNGE PARTITIONS pays great attention to product quality and strives for perfection in every detail of products. This enables us to create fine products.BUNGE PARTITIONS pays great attention to integrity and business reputation. We strictly control the quality and production cost in the production. All these guarantee operalbe wall to be quality-reliable and price-favorable.
  • EBUNGE aluminum movable walls series for hotel-EBUNGE-img-1
Application Scope
BUNGE PARTITIONS's folding partition has been widely used in many industries.BUNGE PARTITIONS insists on providing customers with one-stop and complete solution from the customer's perspective.
  • EBUNGE aluminum movable walls series for hotel-EBUNGE-img-1
Company Advantages
1. EBUNGE movable walls is manufactured by our workers with sophisticated skills in a short production period.
2. Thanks to its good comprehensive properties, movable walls has found a wide application in advanced countries.
3. Multiple times of testing are conducted to ensure its quality.
4. movable walls continues to reinforce its sales in emerging markets.
5. Guangdong Bunge Building Material Industrial Co.,Ltd has developed a variety of high-tech products that are in line with international standards.

Function Room Sliding Folding Partitions Aluminum Acoustic Movable Partition Walls


EBUNGE aluminum movable walls series for hotel-1

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.


Nice Price Products

FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.

 

65 mm movable partition walls ONLY FOR $85.

 

85 mm movable partition walls ONLY FOR $98.

 

100 mm movable partition walls ONLY FOR $118.

 

125 ultra-high system movable partition walls ONLY FOR $130.

 

Please contact us for the Detailed Price.

 

WhatsApp:008613928983277

EBUNGE aluminum movable walls series for hotel-2

Project Case


  EBUNGE aluminum movable walls series for hotel-3  EBUNGE aluminum movable walls series for hotel-4

Project site: India

Model: BUNGE 85 mm movable walls

Width: 3*10550 mm,1*6900 mm

Height: 3760 mm

Total:  4 sets, 145 square meters

Finish: Melamine

Color: CS-3087

 Product Description


The movable partition walls consist of a series of concave/convex profile interlocking flat panels and the fast set retractable top and bottom seals ,its provide excellent acoustic insulation property of from STC-32 to 53 in laboratory setting.

 

Its high performance per dollar value and the easiest in-field operation makes it very suitable for Hotel, banquet hall, conference room ,ballroom, muti-function hall, restaurant,classroom,office,religion,dance studio ,shopping arcades and many other place where seek for space divide with good soundproof performance.

 

There are wide of range face finishes are available :melamine faced MDF or plywood, fabric, carpet, fabric, artificial, leather,wood veneer, high pressure laminate,Formica ,acoustic panel,white boad ect., Panels can also be supplied unfinished for field decoration,Standard frame color is clear anodized aluminum,custom powder coating colors are available.

 

Increasingly, flexible and efficient space utilisation is becoming a must for offices, hotels, exhibition centres, studios and similar. With our movable partition walls system, you can have more choice to arrange your space rather than a room. Is not only provide visual insulation but also sound insulation which give you a more private space, the sound insulation could be 35dB to 55dB, as well as a concreat wall.

 

Movable partition wall is made of high quality anodized aluminum frame with environmentally composite materials.The sliding partition walls panels move on a ceiling track with no requirement of floor guides or rails which provide you a better environment.

EBUNGE aluminum movable walls series for hotel-5
EBUNGE aluminum movable walls series for hotel-6
Technical Details
SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Panel thickness65mm85mm100mm
Max height4000mm6000mm18000mm
Panel width500-1200 mm500-1200 mm500-1200 mm
Face material9mm9mm12 mm
PassdoorsSingle door or Double door
Sound insulation28-38dB Rw28-42dB Rw32-50dB Rw
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized)

EBUNGE aluminum movable walls series for hotel-7

Components of Movable Walls

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the operable waalls cost panels with wheels.

Wheels/Rollers:  It is the carrier for the Movable wall ,let panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the Operable Wall Partitions.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


EBUNGE aluminum movable walls series for hotel-8
EBUNGE aluminum movable walls series for hotel-9
EBUNGE aluminum movable walls series for hotel-10

Parking Styles of Movable Walls

As you know, when we do not use the movable walls, we can park them to the parking area. Actually there are many parking styles for the movable walls, all of the clients can choose the suitable one and we can adjust based on their own project site. If you need some pocket doors to hide the panels, BUNGE Factory also can produce for you.


EBUNGE aluminum movable walls series for hotel-11
EBUNGE aluminum movable walls series for hotel-12
EBUNGE aluminum movable walls series for hotel-13



Different Finishes of Movable Walls
  • ❶   Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  • ❷   Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  • ❸  Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  • ❹  Wallpaper, Vinyl, Fireproof board

  • ❺   Acoustic panels

  • ❻   Tempered glass, mirror etc.

EBUNGE aluminum movable walls series for hotel-14
EBUNGE aluminum movable walls series for hotel-15
EBUNGE aluminum movable walls series for hotel-16
Action Now

1.Buy 30 square meters Get 5% Discount.


2.Buy 80 square meters Get 10% Discount.


3.Get a FREE SAMPLE.


4.Support a 3 YEARS WARRANTY.


5.To be general, BUNGE Factory has 10+ years experience in the line of movable walls. The movable partition walls we produced can divide the space speedy and conveniently. Due to their flexibility and cost effectiveness, now more and more clients need them to divide a large room. Also the movable partition walls are widely used in office buildings, meeting room, hotel, banquet hall, conference and function halls, church, classroom and so on. Would you like to get a free design? Welcome to contact us at any time.

EBUNGE aluminum movable walls series for hotel-17


                                   Melamine ,natural wood veneer,paint,etc                                    


Company Features
1. The reputation of EBUNGE now has been expanding with the popularity of movable walls.
2. The development of highly efficient technology thoroughly improves the quality of movable walls.
3. The mission of Guangdong Bunge Building Material Industrial Co.,Ltd is to provide the best service to our customers through our global partners. Inquiry! Quality and service are always regarded as the key factors for the long-term development of EBUNGE. Inquiry! Guangdong Bunge Building Material Industrial Co.,Ltd is dedicated to producing the best in the residential movable walls business. Inquiry! Our mission is to create value and make a difference and endeavor to offer customers the lowest possible prices with premium quality. Inquiry!

                                   Melamine ,natural wood veneer,paint,etc                                    

Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...