Home  >  Quality PRODUCTS For sell  >  Best Movable Walls Factory  >  Sliding Partitions Wholesale  > 

dividers floor hanging sliding room dividers Bunge

dividers floor hanging sliding room dividers Bunge

Dividers floor hanging sliding room dividers Bunge

Model
85 mm sliding partition walls
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Sliding partition walls
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
Color: Can be customized
Style: Sliding
Product Details
movable walls's specific details in Bunge Building Decoration Engineering are mainly reflected in the following aspects.In the production, Bunge Building Decoration Engineering pays attention to environmental protection. We implement fine processing on products based on the safe, eco-friendly, durable and solid materials. movable walls enjoy a good reputation in the market for the features including solidity, durability, safety and no pollution. Bunge Building Decoration Engineering's movable walls is commonly praised in the market due to good materials, fine workmanship, reliable quality, and favorable price.
  • Bunge-Find Acoustic Partition Wall Commercial Wall Dividers From Bunge Building
Enterprise Strength
  • Bunge Building Decoration Engineering has a sound organizational structure, an excellent incentive mechanism, and a comfortable working environment. All this attracts a group of quality talents to form a mature development team.
  • Bunge Building Decoration Engineering strictly insists on the service concept to be demand-oriented and customer-oriented. We are committed to providing all-round services for consumers to meet their different needs.
  • Bunge Building Decoration Engineering firmly believes that quality creates brand and technology builds future'. In addition, we are honest, pragmatic and innovative, which is aligned with the enterprise spirit. With a focus on brand development, we strive to improve brand reputation and core competitiveness. We sincerely provide quality products and services for our customers. We promote the healthy and sustainable development of the industry.
  • Bunge Building Decoration Engineering first came into the market in 2009. After years of exploration and innovation, we run a brand new production model of movable walls and become an example in the industry.
  • Bunge Building Decoration Engineering's folding partition are sold in all parts of the country based on the online and offline integrated platform of the transaction.
Company Advantages
1. Bunge sliding partition walls is manufactured by our workers with a good understanding of the high quality raw materials. There are various colors offered for the product
2. The quality of this product is guaranteed by our dedicated quality check team. A magnetic strip is applied to the product to ensure strong functionality
3. With strong ability in advanced technology, Bunge can also offer sliding walls residential service to meet the requirements of customers. It will not be easy to swing after being reliably installed

Durable Lightweight Flexible Movable Sliding Partition Walls For Restaurant

Bunge-Find Acoustic Partition Wall Commercial Wall Dividers From Bunge Building

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.


Nice Price Products

FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.

 

65 mm sliding partition walls ONLY FOR $85.

 

85 mm sliding partition walls ONLY FOR $98.

 

100 mm sliding partition walls ONLY FOR $118.

 

125 ultra-high system sliding partition walls ONLY FOR $130.

 

Please contact us for the Detailed Price.

Bunge-Find Acoustic Partition Wall Commercial Wall Dividers From Bunge Building-1

Product Description


  •   Reinforced aluminium frame construction for demanding condition.

  •      Wide range of sliding partitions walls surface finishes and colors.

  •   Single or double passdoor enabling access to neighbouring rooms.

  •     The operable partition walls stacking can be one or both ends.

  •     Top hung and floor with rubber seals achieving excellent soundproof effect.

  •    Various levels of soundproof reduction.

Bunge-Find Acoustic Partition Wall Commercial Wall Dividers From Bunge Building-2
Bunge-Find Acoustic Partition Wall Commercial Wall Dividers From Bunge Building-3
Technical Details
SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Panel thickness65mm85mm100mm
Max height4000mm6000mm18000mm
Panel width500-1200 mm500-1200 mm500-1200 mm
Face material9mm9mm12 mm
PassdoorsSingle door or Double door
Sound insulation28-38dB Rw28-42dB Rw32-50dB Rw
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized)

Bunge-Find Acoustic Partition Wall Commercial Wall Dividers From Bunge Building-4

Components of Sliding Partition Walls

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the restaurant sliding partition walls cost panels with wheels.

Wheels/Rollers:  It is the carrier for the restaurant sliding partition walls,let panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in aluminum profiles to enhance acoustic performance of restaurant sliding partition walls.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Find Acoustic Partition Wall Commercial Wall Dividers From Bunge Building-5
Bunge-Find Acoustic Partition Wall Commercial Wall Dividers From Bunge Building-6
Bunge-Find Acoustic Partition Wall Commercial Wall Dividers From Bunge Building-7

Parking Styles of Sliding Partition Walls

As you know, when we do not use the restaurant sliding partition walls, we can park them to the parking area. Actually there are many parking styles for the restaurant sliding partition walls, all of the clients can choose the suitable one and we can adjust based on their own project site. If you need some pocket doors to hide the panels, BUNGE Factory also can produce for you.


Bunge-Find Acoustic Partition Wall Commercial Wall Dividers From Bunge Building-8
Bunge-Find Acoustic Partition Wall Commercial Wall Dividers From Bunge Building-9
Bunge-Find Acoustic Partition Wall Commercial Wall Dividers From Bunge Building-10



Different Finishes of Sliding Partitions Walls
  • ❶   Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  • ❷   Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  • ❸  Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  • ❹  Wallpaper, Vinyl, Fireproof board

  • ❺   Acoustic panels

  • ❻   Tempered glass, mirror etc.

Bunge-Find Acoustic Partition Wall Commercial Wall Dividers From Bunge Building-11
Bunge-Find Acoustic Partition Wall Commercial Wall Dividers From Bunge Building-12
Bunge-Find Acoustic Partition Wall Commercial Wall Dividers From Bunge Building-13
Action Now

1.Buy 30 square meters Get 5% Discount.


2.Buy 80 square meters Get 10% Discount.


3.Get a FREE SAMPLE.


4.Support a 3 YEARS WARRANTY.


5.To be general, BUNGE Factory has 10+ years experience in the line of restaurant sliding partition walls. The sliding partitions we produced can divide the space speedy and conveniently. Due to their flexibility and cost effectiveness, now more and more clients need them to divide a large room. Also the restaurant sliding partition walls are widely used in office buildings, meeting room, hotel, banquet hall, conference and function halls, church, classroom and so on. Would you like to get a free design? Welcome to contact us at any time.

Bunge-Find Acoustic Partition Wall Commercial Wall Dividers From Bunge Building-14



Company Features
1. Processed by high quality materials, our exquisite sliding room dividers owns different design styles with high quality.
2. To be a better forward room divider wall supplier, Bunge applies the most modern and advanced technology and machines.
3. The realization of people's happiness and the value of sliding partition walls is our pursuit. Inquire!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...
/* 客户要求添加的 */