EBUNGE  > 

AI - Page Sitemap

 > 

demontable toughened glass partition series for office

demontable toughened glass partition series for office

Demontable toughened glass partition series for office

Model
BG office glass partitions
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
5000 square meters
MOQ
No MOQ
Packing Details
Paper cartons, outside with wooden boxes
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product Information of demontable toughened glass partition series for office
Product name: Office glass partitions
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly
Size: 9mm*1220mm*2440mm
Color: Can be customized
Style: Sliding
Company Advantages
1. EBUNGE toughened glass partition has been analyzed in terms of diverse aspects. It has been examed for dimension accuracy, material safety, colorfastness, and other performance quality such as bacterial resistance. It will not be easy to swing after being reliably installed
2. Guangdong Bunge Building Material Industrial Co.,Ltd has the advanced product testing method and equipment. It adopts the convenient hanging system without the floor track
3. Adopt advanced quality testing equipment and methods to ensure the high quality of products. It displays a gorgeous and delicate appearance

Conference Room Aluminum Alloy Frame Fixed Double Solid Office Glass Partitions

Office Glass Partitions Deatils


 

  • Product name: Office glass partitions

  • Model Number: BG83mm glass partitions

  • Brand Name: BUNGE

  • Place of Origin: Guangzhou,China

  • Dimension(mm): Aluminum alloy partition Walls Customized

  • Materials: 

  1. Frame: Aluminum alloy profile

  2. Panel: Single glass, Double Glass, MFC

  • Color:

  1. Aluminum Frame: Oxidation

  2. Glass: Clear class,frosted glass

  3. MFC: 14 colors are available

  • Unit Volume(CBM): Please contact us for more details

  • MOQ: No MOQ

  • Appearance Style: Modern office funiture

  • Packaging: Knock Down Packing(CKD)

  • Packing Materials: Compressed and packed by carton. According to clients' request


demontable toughened glass partition series for office-1

Technical Information

Product Name

Office Glass Partitions

 

Material 

Panel :melamine laminated MDF, Veneer surfaces are protected with melamine board

Can be with different color, referring to the color sample

 

Finishing

Smooth surface finish / FABRIC

Environment-friendly PE painting

Detailed finishing process ensuring the uncompromised quality and consistent beauty

Accessory

Aluminum rail, trolley, etc.

Specific Use

Company receptions, hotel and so on

Trade Term

FOB, CIF, CIF, EXW, etc.

Payment Terms

T/T, L/C, Western Union, PayPal, etc.

MOQ

5 Piece/Pieces Better price for more Trial Order

Packing

Knocked-down packing(CKD), use standard export carton with foam inner to protect goods

Delivery Date

25—30 days

Supply Ability

1000 Piece/Pieces per Month accept mixed order

Transportation

Ship, air, express, mixed, etc., 
under items such as EXW, FOB, CIF, CNF, etc.

Assembling

Technical director, field installation

Special service

Accept both mixed and small order;
Accept custom-made, OEM, ODM Trial Orde
r

demontable toughened glass partition series for office-2

Office Glass Partitions Advantages

1.Double or single layers aluminum glass partitions, easy disassembly, low construction sound, reusable when refurbishing the environment benefits.


2.Super Wire Installation Function to meet the systematical needs of any working places.


3.Solid glass partition can be customized to 3 layers according to different sound-insulation needs. 


4.Adapt to kinds of thickness of aluminum glass partitions to provide the best cost performance.


5. Fine structural design, allow glasses to be assembled and disassembled separately ,easy installation.   


6. Profile material use 6063-T5 Aluminum Alloy of which the performance is superior than industrial Aluminum Alloy, it has good hardness and corrosion tolerance, Aluminum alloy frame, durable and stable construction.


7. Special sealing aluminum design offers adjustable function of the aluminum glass partition.


8. The aluminum bar design between the connection of the double glass produces effect sound insulation.


demontable toughened glass partition series for office-3


Office Glass Partitions Benefit

1. A certain degree of privacy is achieved.


2. Can reduce the level of communication between staff. 


3. Completely see-through, let in light and display who is in the room.


4. Fixed glass partitions panels provide a very modern and contemporary look, just choose different color of glass or different photos and word on the fixed glass partitions panel.


5. Provide stability and offer a preventative measure to deal with acoustic and visual distractions.


Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...