EBUNGE  > 

AI - Page Sitemap

 > 

demontable glass walls and doors customized for banquet hall

demontable glass walls and doors customized for banquet hall

Demontable glass walls and doors customized for banquet hall

Model
BG aluminum glass partitions
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
5000 square meters
MOQ
No MOQ
Packing Details
Paper cartons, outside with wooden boxes
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product Information of demontable glass walls and doors customized for banquet hall
Product name: Aluminum glass partitions
Feature: Sound proofing
Aluminium frame thickness: 2 - 4 meters
Partition material: 800 - 1200 mm
Finish: Clear glass + Melamine
Application: Conference room,office,meeting room
General use: Office furniture
Material: Aluminum+clear glass
Function: Fireproof and eco-friendly
Size: Accept customized
Color: Can be powder coated
Style: Modern
Enterprise Strength
  • BUNGE PARTITIONS will deeply understand the needs of users and offer great services to them.
Company Advantages
1. The material used in glass walls and doors is designed and created independently by Guangdong Bunge Building Material Industrial Co.,Ltd.
2. The quality of the product is guaranteed as we are a quality-oriented company.
3. Sustainability plays a key role in the drive and the recent boom behind this product, there are numerous accompanying benefits that make this trend the housing solution of the future.

83 mm Type Aluminum Alloy Anodized Glass and Full Panel Solid Partition Walls

Aluminum Glass Partitions Deatils


 

  • Product name: Aluminum glass partitions

  • Model Number: BG83mm glass partitions

  • Brand Name: BUNGE

  • Place of Origin: Guangzhou,China

  • Dimension(mm): Aluminum alloy partition Walls Customized

  • Materials: 

  1. Frame: Aluminum alloy profile

  2. Panel: Single glass, Double Glass, MFC

  • Color:

  1. Aluminum Frame: Oxidation

  2. Glass: Clear class,frosted glass

  3. MFC: 14 colors are available

  • Unit Volume(CBM): Please contact us for more details

  • MOQ: No MOQ

  • Appearance Style: Modern office funiture

  • Packaging: Knock Down Packing(CKD)

  • Packing Materials: Compressed and packed by carton. According to clients' request


demontable glass walls and doors customized for banquet hall-1

Technical Information


Application


Materials

Aluminum alloy 6063 T5 /T6  or 6061 T4/T6 or as customers' need

Surface

Powder.coated,PVDcoating,anodized,electrophoresis,with various colors

Profile shape

in accordance with drawing or re-design as requested or market needs.

Detailed Product Description

 

1.Excellent waterproof and thermal break 
2. Good sound insulation 
3. Good air tightness 
4. Environmental-protection

Packing

Packing: inner plastic film, outer kraft paper or as customers' demand

Payment term

T/T 40% deposit and balance brfore delivery

Brand

BUNGE

Certificate

ISO9001 ISO14001

Aluminium product

Aluminum profile of windows & doors frame,thermal-break aluminum profile, curtain wall, sliding window & door, casement window & door,

industrial aluminum extrusion,heat sink, aluminum pipe, aluminium tube, U profile, 

T profile, etc.

Warranty

1. GB5237-2008 equal to EN12020-1.2(2001); 2. Within 15 years without colour changing, all life without surface peeling off; 3. All life withour dfformation without outer force

Moulding

1. Using our moulds, no fee; 2. Using customer drawing, opening mould, usually about 10 tons the moulding fee is free; 3. Can be diguessed.

demontable glass walls and doors customized for banquet hall-2

Aluminum Glass Partitions Advantages

1.Double or single layers aluminum glass partitions, easy disassembly, low construction sound, reusable when refurbishing the environment benefits.


2.Super Wire Installation Function to meet the systematical needs of any working places.


3.Solid glass partition can be customized to 3 layers according to different sound-insulation needs. 


4.Adapt to kinds of thickness of aluminum glass partitions to provide the best cost performance.


5. Fine structural design, allow glasses to be assembled and disassembled separately ,easy installation.   


6. Profile material use 6063-T5 Aluminum Alloy of which the performance is superior than industrial Aluminum Alloy, it has good hardness and corrosion tolerance, Aluminum alloy frame, durable and stable construction.


7. Special sealing aluminum design offers adjustable function of the aluminum glass partition.


8. The aluminum bar design between the connection of the double glass produces effect sound insulation.


demontable glass walls and doors customized for banquet hall-3


Aluminum Glass Partitions Benefit

1. A certain degree of privacy is achieved.


2. Can reduce the level of communication between staff. 


3. Completely see-through, let in light and display who is in the room.


4. Fixed glass partitions panels provide a very modern and contemporary look, just choose different color of glass or different photos and word on the fixed glass partitions panel.


5. Provide stability and offer a preventative measure to deal with acoustic and visual distractions.


6. Can provide a much better solution than the alternatives, such as permanent study walls or temporary screens.


7. A wise choice to divide up the floor space in an office.


8. Specialized plastic injection channel is set up at angle joint to ensure that the internal and back of the angle joint is sealed effectively, and strengthen the angle.


9. Internal and external continuous glass sealing strip can seal better. 


10. Special angle steel sheet enhances the angle quality of the hanging arm of the frame and fan angle. 

demontable glass walls and doors customized for banquet hall-4


Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...