Home  >  Quality PRODUCTS For sell  > 

decorative movable partition EBUNGE

decorative movable partition EBUNGE

Decorative movable partition EBUNGE

Model
85 mm movable wall partitions
Brand Name
EBUNGE
Original
Guangzhou, China
Payment Terms
T/T or Western Union
Delivery Time
15 - 20 days
Supply Ability
50000 square meters per month
MOQ
No MOQ, small quantity welcomed
Packing Details
Paper carton, outside with wooden box
OEM/ODM
Accept
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Movable wall partitions
Feature: Sound proof
Finish: Melamine
Application: Hotel restaurant partition walls
General use: Commercial furniture
Material: MDF + Aluminum
Sample: Free
Height: 2 - 6 meters
Based board: 9 mm MDF Board
Thickness: 85 mm(3 1/4 Inch)
Function: Divide space
Size: Partition walls customized
Color: Optional
Style: Folding and sliding
Application Scope
folding partition can be applied to different industries, fields and scenes.Since the establishment, BUNGE PARTITIONS has always been focusing on the R&D and production of movable walls. With great production capability, we can provide customers with personalized solutions according to their needs.
  • EBUNGE-foldable partition doors | PRODUCTS | EBUNGE
Product Comparison
BUNGE PARTITIONS has great production capability and excellent technology. We also have comprehensive production and quality inspection equipment. office furniture has fine workmanship, high quality, reasonable price, good appearance, and great practicality.BUNGE PARTITIONS's office furniture has better performances in the following aspects.
  • EBUNGE-foldable partition doors | PRODUCTS | EBUNGE-1
    EBUNGE-foldable partition doors | PRODUCTS | EBUNGE-2
Company Advantages
1. Adopted from premium raw materials, EBUNGE foldable partition doors is friendly in use.
2. The product is able to control multiple components to work at the same time thanks to its fast computing capability.
3. This product has won the trust and favor of domestic and foreign customers with its comprehensive strength.

Hotel Restaurant Sliding Acoustic Partition Wall / Hanging Soundproof Movable Wall Partitions


Finished Project


Thanks for the trust from the client who comes from India.

This banquet hall operable partition walls project finished and delivered in March,2018.

Totally 4 sets of walls. Height:3.76 meters. 185 square meters. 


Our technician also went to project to supervise the installation. After installing the tracks system well, our technician came back and the client need us to do the pocket door for him.

Finish: Melamine Surface. Color Chart: CS-3061F.

EBUNGE-Movable Partition, Style Movable Partitions Price List | Ebunge

EBUNGE-Movable Partition, Style Movable Partitions Price List | Ebunge-1

EBUNGE-Movable Partition, Style Movable Partitions Price List | Ebunge-2

EBUNGE-Movable Partition, Style Movable Partitions Price List | Ebunge-3


Movable wall partitions technical information


Series

BG65

BG85

BG100 

Panel suspension

Top hung only

Top hung only

Top hung only

Panel thickness

65mm

85mm

100mm

Max height

4000mm

6000mm

18000mm

Panel width

500-1200 mm

500-1200 mm

500-1200 mm

Face material

9mm

9mm

12 mm

Pass doors

Single door or Double door

Sound insulation

20-32dB Rw

28-36dB Rw

32-50dB Rw

Finish Material

Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, 

Vinyl, Painting, etc.  (Customized)

EBUNGE-Movable Partition, Style Movable Partitions Price List | Ebunge-4


Movable wall partitions features


1. The hotel restaurant movable wall partition is a hanging system, which have the ceiling rails, but have no floor reails. So it will not damage the floor or carpet at the project site.

2. All of the hotel restaurant movable wall partitions can be customized, such as the size, the colors and the surfaces.

3. The hotel restaurant movable wall partitions can help you divide a big space into 2 or more smaller rooms. When you do not use them, they can be parked to the parking zone conveniently and quickly.

4. The operation is very easy, 1 person can finish the whole operation.

5. More than 60 kinds of colors to choose.

6. Different surfaces also available. Such as the MDF, Plywood, Melamine, Veneer, Fabric and Leather surface.

7. Single or Double Pass Door also available, which can help you come in and out easily.

EBUNGE-Movable Partition, Style Movable Partitions Price List | Ebunge-5


Related products


1.  Movable partition walls, operable walls, movable doors, acoustic room dividers, sound proof partitions.

2. Office furniture: office workstations, office chairs, conference chairs, stackable conference tables.

3. Glass partitions: movable glass partitions or fixed glass partitions for office or conference room also available.

4. Partition walls accessories: partition walls tracks and wheels.

EBUNGE-Oem Movable Partition Manufacturer | Products-6


Movable wall partitions packaging 


A short time of production-ONLY 5-7 DAYS


Quick and Safe Shipping


Package by Wooden Boxes

EBUNGE-Movable Partition, Style Movable Partitions Price List | Ebunge-6


About us

Guangdong Bunge Building Material Industrial Co.,Ltd is a professional company in manufacturing Movable Partition Walls System. We are the real manufacturer, we have our own factory and showroom in Guangzhou, China, which covers an area over 3000 m². And we have around 10 years experience in it. There is a ultra-high system sample in our factory, over 8 meters. Every client who came to our factory was amazing in it. BUNGE Factory is always providing the clients with nice quality and competitive price movable wall system, and we are so strict to inspect the quality before delivering. So far, we have exported to USA, Australia Uganda, Lebanon, Sri-Lanka, Saudi Arabia, Philippines and many other countries. 

As a professional manufacturer, we not only produce, we also design, deliver and have the after-sales service for clients. If the client need installation service, we also can send our technicians to supervise the installation. In addition, we also can supply free design to every client and we will reply in 12 hours if the clients have any questions.

EBUNGE-Movable Partition, Style Movable Partitions Price List | Ebunge-7



Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd is a professional manufacturer of movable partition.
2. Guangdong Bunge Building Material Industrial Co.,Ltd has independent products researching and developing ability.
3. The unique spirit of Guangdong Bunge Building Material Industrial Co.,Ltd and the will to continue development have been confirmed all over the years. Inquire! We adopt the concept of foldable partition doors to invite all the friends to come forward together in movable partition industry. Inquire! Guangdong Bunge Building Material Industrial Co.,Ltd will keep in mind that details determine everything. Inquire! Sincerity to our customer is the most important in Guangdong Bunge Building Material Industrial Co.,Ltd. Inquire!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...