product-EBUNGE-img
Home  > PRODUCTS  > 

Customized 4 Person Office Workstation Cluster Modular Office Cubicle Partitions for Call Center

product-EBUNGE-img
product-EBUNGE-img
product-EBUNGE-img
product-EBUNGE-Customized 4 Person Office Workstation Cluster Modular Office Cubicle Partitions for
product-Customized 4 Person Office Workstation Cluster Modular Office Cubicle Partitions for Call Ce-1
product-EBUNGE-img-1
product-EBUNGE-img-1

Customized 4 Person Office Workstation Cluster Modular Office Cubicle Partitions for Call Center

Model
BG modular office partitions
Brand Name
EBUNGE
Original
Guangzhou,China
Payment Terms
T/T or Western Union also available
Delivery Time
15-20 days
Supply Ability
50000 sets per month
MOQ
No MOQ
Packing Details
Paper carton, outside with wooden box
OEM/ODM
Accept
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Modular office partitions
Feature: Modern office workstations
Finish: Melamine
Application: Office partitions
General use: Office furniture
Material: Melamine+metal structure
Function: Office work
Size: 1200*600 mm
Color: Can be customized

4 Person Office Workstation Modular Office Cubicle Partitions for Call Center

Office Workstations Deatils

 

Material:


Table:25mm MFC (chipboard with melamine surface&PVC edging),scratch resistant.

 

Screen:make use of glass with aluminium frame (aluminium profile itself is 1.2mm-1.5mm).

 

Construction:

 

1>High quality aluminum alloy profile with oxidation treatment on the surface and has great security and durableness.

 

2>Wire pipes could be set in the Left and Right of the washboard,and electric outlet board could be installed on the surface of the washboard in order to meet the wire installation requirement of any working places.


3>Fabric finished partition panel.


4>Fixed three drawer pedestal,lockable.

EBUNGE-Wholesale Movable Partition Manufacturer, Foldable Partition Doors | Ebunge


Technical Information

Size

 Can be customized

Workstation table top

 25mm thickness melamine board(MFC), PVC edge banding

Melamine color

 White, grey, black, silver, blue, grey, red, green or any wood grain color,accept customized.

Screen/partition material

 Aluminum, glass, panel, or MDF

Size, color, design 

 Can be custom made 

Accessories optional

 CPU holder, keyboard tray, pedestal with or without wheels, side storage

Sample

 Available

Package

 Carton box

OEM

 Welcome

Application Office, home, bank...working area
Feature Modern, easty to install 
Advantages

 1) 100% safe and friendly material.

 2) Various material and color options.

 3) Accept mixed order in a container.

 4) Experienced to provide professional service for customized order, to meet specific need for small or big office furnishing project.

 5) Provide "one-stop" service, to save your time and cost.

EBUNGE-Wholesale Movable Partition Manufacturer, Foldable Partition Doors | Ebunge-1

EBUNGE-Wholesale Movable Partition Manufacturer, Foldable Partition Doors | Ebunge-2

EBUNGE-Wholesale Movable Partition Manufacturer, Foldable Partition Doors | Ebunge-3

EBUNGE-Wholesale Movable Partition Manufacturer, Foldable Partition Doors | Ebunge-4

Office Workstations Advantages

1>.Professional manufacturer,prefect workmanship.

 

2>.Enjoy high reputation from old client.

 

3>.The deilvery time is promptly.

 

4>.The mixed order,trial order are accepted.

 

5>.Independent raw material inspecting office to guarantee the quality of the raw material.

 

6>.During the production process,the workers are strictly carry every prodcuing fules.

 

7>.Each office workstations should be tested before delivering out producing workshop.

EBUNGE-Wholesale Movable Partition Manufacturer, Foldable Partition Doors | Ebunge-5


Office Workstations Finishing

There are 3 kinds of finishes to choose:

Bunge-Office Furniture Sets, Modern Conference Room Modular Workstations, Tables-3


Packaging & Delivery

Detailed Packing:

 

1. KD packing.

 

2. Shipping marks can be decided by customers.

 

3. Outside: thick carton to reduce extrusion & collision in transit.

 

4. Inside: masking tape and bubble bag to protect the chair not to be affected with damp and crash during transit.

 

Shipping Details:

 

1. Courier Shipment including DHL, UPS, FEDEX. We will search the most economic and reliable shipping company to transport the goods safely.

 

2. Airport Shipment. If your order exceeds 100kg, air shipment will be more economical than express.

 

3. Ocean Shipment. If you order large quantity goods, we can help you to deliver them by sea.

Saving Space Office Furniture Contemporary Office Cubicles 2-6 Seat Office Partition Workstations


Our Service

Our Service

 

1. High-level professional, experienced and skillful technicians to control design and quality of medical mesh office chair with locking casters.

 

2. Reply within 12 hours.

 

3. Prompt delivery.

 

4. First class after-sales service.

 

5. Provide free accessories for customer to reserve before shipment.

 

 

Quality Control:

 

1. Before the mass production, the Pre-Production Sample will be made firstly. Material and color will be checked with the clients.

 

2. The medical mesh office chair with locking casters will be traced from the material purchase.

 

3. Every production procedure, our QC will check the quality carefully and trial assembly.

 

4. The finished medical mesh office chair with locking casters will be checked again and cleaned before packing.

EBUNGE-Wholesale Movable Partition Manufacturer, Foldable Partition Doors | Ebunge-8


Modern Conference Room Modular Workstations, Tables and Cubicles for office

Office Workstations Deatils

 

Material:


Table:25mm MFC (chipboard with melamine surface&PVC edging),scratch resistant.

 

Screen:make use of glass with aluminium frame (aluminium profile itself is 1.2mm-1.5mm).

 

Construction:

 

1>High quality aluminum alloy profile with oxidation treatment on the surface and has great security and durableness.

 

2>Wire pipes could be set in the Left and Right of the washboard,and electric outlet board could be installed on the surface of the washboard in order to meet the wire installation requirement of any working places.


3>Fabric finished partition panel.


4>Fixed three drawer pedestal,lockable.

Bunge-Office Furniture Sets, Modern Conference Room Modular Workstations, Tables

<

Modern Conference Room Modular Workstations, Tables and Cubicles for office

Office Workstations Deatils

 

Material:


Table:25mm MFC (chipboard with melamine surface&PVC edging),scratch resistant.

 

Screen:make use of glass with aluminium frame (aluminium profile itself is 1.2mm-1.5mm).

 

Construction:

 

1>High quality aluminum alloy profile with oxidation treatment on the surface and has great security and durableness.

 

2>Wire pipes could be set in the Left and Right of the washboard,and electric outlet board could be installed on the surface of the washboard in order to meet the wire installation requirement of any working places.


3>Fabric finished partition panel.


4>Fixed three drawer pedestal,lockable.

Bunge-Office Furniture Sets, Modern Conference Room Modular Workstations, Tables


Technical Information

Size

 Can be customized

Workstation table top

 25mm thickness melamine board(MFC), PVC edge banding

Melamine color

 White, grey, black, silver, blue, grey, red, green or any wood grain color,accept customized.

Screen/partition material

 Aluminum, glass, panel, or MDF

Size, color, design 

 Can be custom made 

Accessories optional

 CPU holder, keyboard tray, pedestal with or without wheels, side storage

Sample

 Available

Package

 Carton box

OEM

 Welcome

Application Office, home, bank...working area
Feature Modern, easty to install 
Advantages

 1) 100% safe and friendly material.

 2) Various material and color options.

 3) Accept mixed order in a container.

 4) Experienced to provide professional service for customized order, to meet specific need for small or big office furnishing project.

 5) Provide "one-stop" service, to save your time and cost.

Bunge-Office Furniture Sets, Modern Conference Room Modular Workstations, Tables-1

Office Workstations Advantages

1>.Professional manufacturer,prefect workmanship.

 

2>.Enjoy high reputation from old client.

 

3>.The deilvery time is promptly.

 

4>.The mixed order,trial order are accepted.

 

5>.Independent raw material inspecting office to guarantee the quality of the raw material.

 

6>.During the production process,the workers are strictly carry every prodcuing fules.

 

7>.Each office workstations should be tested before delivering out producing workshop.

Bunge-Office Furniture Sets, Modern Conference Room Modular Workstations, Tables-2


Office Workstations Finishing

There are 3 kinds of finishes to choose:

Bunge-Office Furniture Sets, Modern Conference Room Modular Workstations, Tables-3


Packaging & Delivery

Detailed Packing:

 

1. KD packing.

 

2. Shipping marks can be decided by customers.

 

3. Outside: thick carton to reduce extrusion & collision in transit.

 

4. Inside: masking tape and bubble bag to protect the chair not to be affected with damp and crash during transit.

 

Shipping Details:

 

1. Courier Shipment including DHL, UPS, FEDEX. We will search the most economic and reliable shipping company to transport the goods safely.

 

2. Airport Shipment. If your order exceeds 100kg, air shipment will be more economical than express.

 

3. Ocean Shipment. If you order large quantity goods, we can help you to deliver them by sea.

Saving Space Office Furniture Contemporary Office Cubicles 2-6 Seat Office Partition Workstations


Our Service

Our Service

 

1. High-level professional, experienced and skillful technicians to control design and quality of medical mesh office chair with locking casters.

 

2. Reply within 12 hours.

 

3. Prompt delivery.

 

4. First class after-sales service.

 

5. Provide free accessories for customer to reserve before shipment.

 

 

Quality Control:

 

1. Before the mass production, the Pre-Production Sample will be made firstly. Material and color will be checked with the clients.

 

2. The medical mesh office chair with locking casters will be traced from the material purchase.

 

3. Every production procedure, our QC will check the quality carefully and trial assembly.

 

4. The finished medical mesh office chair with locking casters will be checked again and cleaned before packing.

Bunge-Office Furniture Sets, Modern Conference Room Modular Workstations, Tables-5


Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...