Home  >  Quality PRODUCTS For sell  >  Glass Partitions Manufacturer  >  Quality Solid Glass Partitions  > 

Custom temper alloy office glass partition design Bunge aluminum

Custom temper alloy office glass partition design Bunge aluminum

Custom temper alloy office glass partition design Bunge aluminum

Model
BG office glass partitions
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
5000 square meters
MOQ
No MOQ
Packing Details
Paper cartons, outside with wooden boxes
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Office glass partitions
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly
Size: 9mm*1220mm*2440mm
Color: Can be customized
Style: Sliding
Product Comparison
Guangdong Bunge Building Material Industrial Co.,Ltd has great production capability and excellent technology. We also have comprehensive production and quality inspection equipment. movable walls has fine workmanship, high quality, reasonable price, good appearance, and great practicality.In the production, Guangdong Bunge Building Material Industrial Co.,Ltd pays attention to environmental protection. We implement fine processing on products based on the safe, eco-friendly, durable and solid materials. movable walls enjoy a good reputation in the market for the features including solidity, durability, safety and no pollution.Compared with other products in the same category, movable walls produced by Guangdong Bunge Building Material Industrial Co.,Ltd has the following advantages.
  • Bunge-Professional Frameless Glass Wall Internal Glass Partition Supplier
    Bunge-Professional Frameless Glass Wall Internal Glass Partition Supplier-1
Application Scope
The folding partition developed by Guangdong Bunge Building Material Industrial Co.,Ltd is widely used in various fields.Guangdong Bunge Building Material Industrial Co.,Ltd has many years of industrial experience and great production capability. We are able to provide customers with quality and efficient one-stop solutions according to different needs of customers.Guangdong Bunge Building Material Industrial Co.,Ltd learns from domestic and foreign advanced management concepts and production techniques. We run a strict and perfect procurement chain and select solid and durable materials to produce movable walls. Compared with similar products, they are stronger in hardness, higher in toughness, and longer in service life. They are affordable, attracting many buyers.
  • Bunge-Professional Frameless Glass Wall Internal Glass Partition Supplier-2
Company Advantages
1. Bunge partition wall with glass is quickly and accurately manufactured by using the professional production technique. The patterns of the product can be customized
2. The core component of office glass partition design is excellent, primarily shows in glass partition wall systems. Equipped with a sealing device, the product is praised for its tight sealing performance
3. The product is functional with perfect and reliable performance. The product offers a thorough partition from the ceiling to the floor
4. Guangdong Bunge Building Material Industrial Co.,Ltd sets a good example for glass walls for office interiors industry in terms of quality. The product is found to have good sound insulation
5. Guangdong Bunge Building Material Industrial Co.,Ltd has excellent customer service representatives available to help you out by phone. It is widely used for privacy protection

Conference Room Aluminum Alloy Frame Fixed Double Solid Office Glass Partitions

Office Glass Partitions Deatils


 

  • Product name: Office glass partitions

  • Model Number: BG83mm glass partitions

  • Brand Name: BUNGE

  • Place of Origin: Guangzhou,China

  • Dimension(mm): Aluminum alloy partition Walls Customized

  • Materials: 

  1. Frame: Aluminum alloy profile

  2. Panel: Single glass, Double Glass, MFC

  • Color:

  1. Aluminum Frame: Oxidation

  2. Glass: Clear class,frosted glass

  3. MFC: 14 colors are available

  • Unit Volume(CBM): Please contact us for more details

  • MOQ: No MOQ

  • Appearance Style: Modern office funiture

  • Packaging: Knock Down Packing(CKD)

  • Packing Materials: Compressed and packed by carton. According to clients' request


Bunge-Best Toughened Glass Partition Internal Glass Partition - Bunge

Technical Information

Product Name

Office Glass Partitions

 

Material 

Panel :melamine laminated MDF, Veneer surfaces are protected with melamine board

Can be with different color, referring to the color sample

 

Finishing

Smooth surface finish / FABRIC

Environment-friendly PE painting

Detailed finishing process ensuring the uncompromised quality and consistent beauty

Accessory

Aluminum rail, trolley, etc.

Specific Use

Company receptions, hotel and so on

Trade Term

FOB, CIF, CIF, EXW, etc.

Payment Terms

T/T, L/C, Western Union, PayPal, etc.

MOQ

5 Piece/Pieces Better price for more Trial Order

Packing

Knocked-down packing(CKD), use standard export carton with foam inner to protect goods

Delivery Date

25—30 days

Supply Ability

1000 Piece/Pieces per Month accept mixed order

Transportation

Ship, air, express, mixed, etc., 
under items such as EXW, FOB, CIF, CNF, etc.

Assembling

Technical director, field installation

Special service

Accept both mixed and small order;
Accept custom-made, OEM, ODM Trial Orde
r

Bunge-Best Toughened Glass Partition Internal Glass Partition - Bunge-1

Office Glass Partitions Advantages

1.Double or single layers aluminum glass partitions, easy disassembly, low construction sound, reusable when refurbishing the environment benefits.


2.Super Wire Installation Function to meet the systematical needs of any working places.


3.Solid glass partition can be customized to 3 layers according to different sound-insulation needs. 


4.Adapt to kinds of thickness of aluminum glass partitions to provide the best cost performance.


5. Fine structural design, allow glasses to be assembled and disassembled separately ,easy installation.   


6. Profile material use 6063-T5 Aluminum Alloy of which the performance is superior than industrial Aluminum Alloy, it has good hardness and corrosion tolerance, Aluminum alloy frame, durable and stable construction.


7. Special sealing aluminum design offers adjustable function of the aluminum glass partition.


8. The aluminum bar design between the connection of the double glass produces effect sound insulation.


Bunge-Best Toughened Glass Partition Internal Glass Partition - Bunge-2


Office Glass Partitions Benefit

1. A certain degree of privacy is achieved.


2. Can reduce the level of communication between staff. 


3. Completely see-through, let in light and display who is in the room.


4. Fixed glass partitions panels provide a very modern and contemporary look, just choose different color of glass or different photos and word on the fixed glass partitions panel.


Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...