Home  >  Quality PRODUCTS For sell  >  Best Movable Walls Factory  >  Sliding Partitions Wholesale  > 

convenient moving partition wall customized for schools

convenient moving partition wall customized for schools

convenient moving partition wall customized for schools

Model
85 mm banquet hall partitions
Brand Name
BUNGE
Year of Establishment
2011
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes.
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Banquet hall partitions
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly
Size: 9mm*1220mm*2440mm
Color: Can be customized
Style: Sliding
Enterprise Strength
  • BUNGE PARTITIONS focuses on interacting with customers to know well their needs and provides them with efficient pre-sales and after-sales services.
Product Details
BUNGE PARTITIONS's office furniture is of exquisite workmanship, which is reflected in the details.BUNGE PARTITIONS has great production capability and excellent technology. We also have comprehensive production and quality inspection equipment. office furniture has fine workmanship, high quality, reasonable price, good appearance, and great practicality.
  • EBUNGE-movable divider walls ,moving partition wall | EBUNGE
Company Advantages
1. The production technology of EBUNGE moving partition wall is constantly updated. Thanks to the adoption of high technology, its packaging capacity is ensured.
2. Considering moving partition wall, the key factors of movable divider walls is sliding room partitions .
3. The product is competitively priced and widely used by people from all walks of life.
4. The product is in high demand at home and abroad thanks to its considerable economic benefits.


85 mm Type Movable Sound Proof Partition Walls for Banquet Hall

Bunge-Best Movable Wall Systems Movable Sound Proof Partition Walls

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.


Nice Price Products

FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.

 

65 mm banquet hall partitions ONLY FOR $85.

 

85 mm banquet hall partitions ONLY FOR $98.

 

100 mm banquet hall partitions ONLY FOR $118.

 

125 ultra-high system banquet hall partitions ONLY FOR $130.

 

Please contact us for the Detailed Price.

Bunge-Best Movable Wall Systems Movable Sound Proof Partition Walls-1

Product Description


  •   Reinforced aluminium frame construction for demanding condition.

  •      Wide range of banquet hall movable walls surface finishes and colors.

  •   Single or double passdoor enabling access to neighbouring rooms.

  •     The banquet hall movable partition walls stacking can be one or both ends.

  •     Top hung and floor with rubber seals achieving excellent soundproof effect.

  •    Various levels of soundproof reduction.

Bunge-Best Movable Wall Systems Movable Sound Proof Partition Walls-2
Bunge-Best Movable Wall Systems Movable Sound Proof Partition Walls-3
Technical Details
SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Panel thickness65mm85mm100mm
Max height4000mm6000mm18000mm
Panel width500-1200 mm500-1200 mm500-1200 mm
Face material9mm9mm12 mm
PassdoorsSingle door or Double door
Sound insulation28-38dB Rw28-42dB Rw32-50dB Rw
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized)

Bunge-Best Movable Wall Systems Movable Sound Proof Partition Walls-4

Components of Banquet Hall Partitions

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the banquet hall movable partition walls cost panels with wheels.

Wheels/Rollers:  It is the carrier for the banquet hall movable partition walls,let panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in aluminum profiles to enhance acoustic performance of banquet hall movable partition walls.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Best Movable Wall Systems Movable Sound Proof Partition Walls-5
Bunge-Best Movable Wall Systems Movable Sound Proof Partition Walls-6
Bunge-Best Movable Wall Systems Movable Sound Proof Partition Walls-7

Parking Styles of Banquet Hall Partitions

As you know, when we do not use the banquet hall partitions, we can park them to the parking area. Actually there are many parking styles for the banquet hall movable walls, all of the clients can choose the suitable one and we can adjust based on their own project site. If you need some pocket doors to hide the panels, BUNGE Factory also can produce for you.


Bunge-Best Movable Wall Systems Movable Sound Proof Partition Walls-8
Bunge-Best Movable Wall Systems Movable Sound Proof Partition Walls-9
Bunge-Best Movable Wall Systems Movable Sound Proof Partition Walls-10



Different Finishes of Banquet Hall Partitions
  • ❶   Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  • ❷   Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  • ❸  Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  • ❹  Wallpaper, Vinyl, Fireproof board

  • ❺   Acoustic panels

  • ❻   Tempered glass, mirror etc.

Bunge-Best Movable Wall Systems Movable Sound Proof Partition Walls-11
Bunge-Best Movable Wall Systems Movable Sound Proof Partition Walls-12
Bunge-Best Movable Wall Systems Movable Sound Proof Partition Walls-13
Action Now

1.Buy 30 square meters Get 5% Discount.


2.Buy 80 square meters Get 10% Discount.


3.Get a FREE SAMPLE.


4.Support a 3 YEARS WARRANTY.


5.To be general, BUNGE Factory has 10+ years experience in the line of banquet hall movable walls. The movable walls we produced can divide the space speedy and conveniently. Due to their flexibility and cost effectiveness, now more and more clients need them to divide a large room. Also the banquet hall partitions are widely used in office buildings, meeting room, hotel, banquet hall, conference and function halls, church, classroom and so on. Would you like to get a free design? Welcome to contact us at any time.

Bunge-Best Movable Wall Systems Movable Sound Proof Partition Walls-14



Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd is at the top position in the national movable divider walls market.
2. sliding wall panels is made to be of high quality.
3. Better serving customers will be more beneficial to the popularity of EBUNGE. Please contact us! Relying on professional team and advanced technology, EBUNGE has the great dream to be the leading sliding folding partition manufacturer in the future. Please contact us!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...