product-EBUNGE-img
Home  > PRODUCTS  > 

Conference Room Furniture Staff Portable Metal Mesh Training Folding Office Chair With Wheels

product-EBUNGE-img
product-EBUNGE-img
product-EBUNGE-img
product-EBUNGE-Conference Room Furniture Staff Portable Metal Mesh Training Folding Office Chair Wit
product-Conference Room Furniture Staff Portable Metal Mesh Training Folding Office Chair With Wheel-1
product-EBUNGE-img-1
product-EBUNGE-img-1

Conference Room Furniture Staff Portable Metal Mesh Training Folding Office Chair With Wheels

Model
Folding office chair
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
7-20 days
Supply Ability
5000 pieces per month
MOQ
No MOQ
Packing Details
Inner PE foam ,Paper Cartons
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Folding office chair
Feature: Writing pad
Finish: Fabric, pu leather, mesh
Application: Office, conference room and etc
General use: Office furniture
Material: Fabric/plastic/iron
Function: Writing pad
Size: 2440*133 mm, 2440*197 mm Thickness 83 mm
Color: Can be customized
Style: Modern style

Staff Portable Metal Mesh Training Folding Office Chair With Wheels

Description

Folding office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and color amercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE-Movable Partition Manufacturer, Foldable Partition Doors | Ebunge

EBUNGE-Movable Partition Manufacturer, Foldable Partition Doors | Ebunge-1


Techincal Information

Product Name

Folding Office chair

Size

430*430*870mm, Customized

Color

Black, Green, Orange, Customized

Chair Backrest

Nylon,has been tested with 113KG

Mesh

Breathable import mesh

Cushion

The high density non-powder type sponge,300,000 testing stamping invariability

Armrest

Nylon imported special mesh surface

Foot shelf

1.8 thick flat tube, electroplated surface

Our Service

1.We are factory , OEM order accepted

2.Custom design & ideas

 

EBUNGE-Movable Partition Manufacturer, Foldable Partition Doors | Ebunge-2

EBUNGE-Movable Partition Manufacturer, Foldable Partition Doors | Ebunge-3

EBUNGE-Movable Partition Manufacturer, Foldable Partition Doors | Ebunge-4

EBUNGE-Movable Partition Manufacturer, Foldable Partition Doors | Ebunge-5

EBUNGE-Movable Partition Manufacturer, Foldable Partition Doors | Ebunge-6


Feature


Folding Office chair function &feature:

 

1. Can be foldable,easy delivering,accompanying with the tablet,very convenient for training.

 

2. New environmentally friendly material,99%recyclable.

 

3. Considering the quality and cost, it is your best choice.

 

4. 360 degree swivel casters:4pcs non-marking casters can be rotated in all directions,very convenient to move.

 

5. Comfortable:6-8cm thick sponge padded seat offers you a soft and comfortable experience.

 

6. Ergonomic armrests help you relax in an easy way after your long time working.

 

7. The frame with thickness of 1.5 mm steel.Strong support and long lifetime.

 

8. The color and foot support style can choose freely.


EBUNGE-Movable Partition Manufacturer, Foldable Partition Doors | Ebunge-7

EBUNGE-Movable Partition Manufacturer, Foldable Partition Doors | Ebunge-8


Application


EBUNGE-Movable Partition Manufacturer, Foldable Partition Doors | Ebunge-9

EBUNGE-Movable Partition Manufacturer, Foldable Partition Doors | Ebunge-10

 

Packing


EBUNGE-Oem Movable Partition Price List | Bunge Partitions-8

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...