Computer Tables Office Cubicle Furniture Modular Desk Office Workstation-movable wall, folding partition,operalbe wall-EBUNGE
Home  > PRODUCTS  > Office Furniture  > 

Computer Tables Office Cubicle Furniture Modular Desk Office Workstation

EBUNGE
Computer Tables Office Cubicle Furniture Modular Desk Office Workstation-EBUNGE
EBUNGE
Computer Tables Office Cubicle Furniture Modular Desk Office Workstation-EBUNGE
EBUNGE
Computer Tables Office Cubicle Furniture Modular Desk Office Workstation-EBUNGE

Computer Tables Office Cubicle Furniture Modular Desk Office Workstation

Model
BG office workstations
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
5000 sets
MOQ
No MOQ
Packing Details
Paper carton
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Office workstations
Feature: Eco-friendly
Aluminium frame thickness: 3.2CM/4.5CM/2.0CM/1.8CMthickness
Partition material: Aluminum and board
Finish: Melamine,veneer,metal
Application: Conference room,office,meeting room
General use: Office furniture
Material: MDF+Melamine
Function: Office Work,office partitions,office dividers,office standing
Size: Can be customized
Color: Can be customized
Style: Modern

Computer Tables Office Cubicle Furniture Modular Desk Office Workstation

Office Furniture Deatils


 

1. The aluminium profile itself is 1.2mm-1.5mm, and finished patition thickness is 60mm and 30mm.


2. The modular office workstation is made of panel, aluminum, glass, white board and others.


3. Different layout and dimensions can be made by customer's requests.


4. Colors of the computer workstation partition and tabletop are subject to customer's requirements.


5. Matching prodcucts like movable/fixed pedestal, CPU Trolly, Keyboard Tray are available with us.


6. Different combination materials of the office partitions will be manufactured by your own will.


7. This type is a classical one and we have exported it to many Mid-Eastern countries.


8. Easy to install.


Bunge-Professional Office Dividers Purchase Office Furniture Supplier

Technical Information

Size

 Can be customized

Workstation table top

 25mm thickness melamine board(MFC), PVC edge banding

Melamine color

 White, grey, black, silver, blue, grey, red, green or any wood grain color,accept customized.

Screen/partition material

 Aluminum, glass, panel, or MDF

Size, color, design 

 Can be custom made 

Accessories optional

 CPU holder, keyboard tray, pedestal with or without wheels, side storage

Sample

 Available

Package

 Carton box

OEM

 Welcome

Application Office, home, bank...working area
Feature Modern, easty to install 
Advantages

 1) 100% safe and friendly material.

 2) Various material and color options.

 3) Accept mixed order in a container.

 4) Experienced to provide professional service for customized order, to meet specific need for small or big office furnishing project.

 5) Provide "one-stop" service, to save your time and cost.

Bunge-Professional Office Dividers Purchase Office Furniture Supplier-1

Office Furniture Advantages

1--Office workstations furniture design,fresh MFC boards are strong and innocuous,safe for long time using; 


2--Firmer frame,enable it can support maximum strength in public;


3--Detachable structure, so more quantity in container is allow,save your shipping cost;


4--Easy for installationin, All accessories and screws will be along with goods;


5--Plastic footpad under frame to keep the ground out of scratching;


6--BUNGE colour options available are Green,Light Gray,or as your request.

Bunge-Professional Office Dividers Purchase Office Furniture Supplier-2


Office Furniture Finishing

There are 3 kinds of finishes to choose:

Bunge-Professional Office Dividers Purchase Office Furniture Supplier-3


Packaging & Delivery

Detailed Packing:

 

1. KD packing.

 

2. Shipping marks can be decided by customers.

 

3. Outside: thick carton to reduce extrusion & collision in transit.

 

4. Inside: masking tape and bubble bag to protect the chair not to be affected with damp and crash during transit.

 

Shipping Details:

 

1. Courier Shipment including DHL, UPS, FEDEX. We will search the most economic and reliable shipping company to transport the goods safely.

 

2. Airport Shipment. If your order exceeds 100kg, air shipment will be more economical than express.

 

3. Ocean Shipment. If you order large quantity goods, we can help you to deliver them by sea.

Saving Space Office Furniture Contemporary Office Cubicles 2-6 Seat Office Partition Workstations


Our Service

Our Service

 

1. High-level professional, experienced and skillful technicians to control design and quality of medical mesh office chair with locking casters.

 

2. Reply within 12 hours.

 

3. Prompt delivery.

 

4. First class after-sales service.

 

5. Provide free accessories for customer to reserve before shipment.

 

 

Quality Control:

 

1. Before the mass production, the Pre-Production Sample will be made firstly. Material and color will be checked with the clients.

 

2. The medical mesh office chair with locking casters will be traced from the material purchase.

 

3. Every production procedure, our QC will check the quality carefully and trial assembly.

 

4. The finished medical mesh office chair with locking casters will be checked again and cleaned before packing.

Bunge-Professional Office Dividers Purchase Office Furniture Supplier-5


Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...