EBUNGE
Home  > PRODUCTS  > 

Commercial Furniture Mesh Office Chair Curved Round Painting Glass Modern Wooden Office Reception Desk

EBUNGE-Commercial Furniture Mesh Office Chair Curved Round Painting Glass Modern Wooden Office Reception Desk
Commercial Furniture Mesh Office Chair Curved Round Painting Glass Modern Wooden Office Reception Desk-EBUNGE
EBUNGE
Commercial Furniture Mesh Office Chair Curved Round Painting Glass Modern Wooden Office Reception Desk-EBUNGE
Commercial Furniture Mesh Office Chair Curved Round Painting Glass Modern Wooden Office Reception Desk-EBUNGE

Commercial Furniture Mesh Office Chair Curved Round Painting Glass Modern Wooden Office Reception Desk

Model
Office reception desk
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
7-20 days
Supply Ability
5000 pieces per month
MOQ
No MOQ
Packing Details
Inner PE foam ,Paper Cartons
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Office reception desk
Feature: Fine Workmanship
Finish: Laminate Finish
Application: Office, conference room and etc
General use: Office furniture
Material: MDF+MFC
Function: Attract Customer
Size: W2400*D616*H1050 mm
Color: Can be customized
Style: Modern style

Mesh Office Chair Curved Round Painting Glass Modern Wooden Office Reception Desk


Description:



Office reception desk main material is made of melamine laminated Particle board or MDF or MDF with veneer and painting.It has the character of anti-water, anti-dirty, anti-scratch.


Special character of our office reception table: All the edges sealed with high quality PVC or Painting, the glue used for the lamination which is imported from Germany, friendly for the environment. All the hardware parts are good quality, strong and durable. Aluminum frame glass door with high grade lock and hinges, bring you comfortable work environment.


1.jpg



Technical information:


Products Namereception table ,bank counter, reception desk,office furniture
StyleRectangle ,square
Specific UseOffice Furniture ,Home Furniture ,Hotel Furniture
MaterialMelamine Laminated Flake board or MDF (which have the character anti-water ,
anti-dirty ,anti-scratch , easy to clean and keep fresh color) .
Table Size2400*616*1050mm,customer OEM size welcome
Packing DetailsKnock Down Packing , each parts of the products packed by double strong carton boxes , 
inside with the pear cotton protection ,with instruction manual easy to assemble .
Packing Volume0.23- 0.40 CBM
Gross Weight85-148.0KG



3.jpg


Feature:


1. Good quality with competitive price.


2. Modern, Comfortable , Elegant and endurable, Environmentally-friendly materials.


3. The best after-sales service, Mutual Development, Mutual Benefits, so make long time cooperation.


4. Thousands of models for choice , fully meet different customers' demands.


5. Different styles with different material and price range, control cost in the best way.


6. Customized service: OEM, ODM available.


Main surface:


1. Smooth surface finish.


2. Environment-friendly PE painting.


3. Detailed finishing process ensuring the compromised quality and consistent beauty.


2.jpg


Packing details:


Knock down packing, each part is packed with PE Foam, inside for protection, outside with double strong 5 layers carton boxes, Carton boxes print with the customers Logo and description, inside instruction manual easy for assemble; With Glass parts are packed by wooden frame to to avoid fragile.


office workstation packing



Our service:


1. High quality at cost effective price.


2. Custom design and manufacturing according to your CAD drawing.


3. One-step full package office furniture solution:


Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.


4. Warranty is about 3-5 years to supply service.

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...