Home  > PRODUCTS  > Glass Partitions  > Movable Glass Partitions  > 

Collapsible office partition walls glass folding door glass 12mm frameless operable glass partition system with sliding door

Collapsible office partition walls glass folding door glass 12mm frameless operable glass partition system with sliding door

Model
65 series
Brand Name
Ebunge
Original
Guangdong,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
7-15 days, depending on the quantity
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Standard Sealed Wooden Case+ Plywood For Glass Panel
OEM/ODM
OEM
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Office folding glass wall
Feature: Sliding, folding and movable
Aluminium frame thickness: aluminum frame
Partition material: Tempered glass and aluminum
Finish: Tempered glass
Application: Ofiice, hotel, restaurant
General use: Space dividing
Material: 100% Polyester Fiber
Sample: Free
Height: 2 - 3 meters
Based board: 9 mm MDF Board
Thickness: 36mm
Function: ECO-friendlyDividespace
Size: Customized
Color: Can be customized
Style: Morden style

Collapsible office partition walls glass folding door glass 12mm frameless operable glass partition system with sliding door

Product Description

product-EBUNGE-collapsible office partition walls glass-img

Specifications

1.Office glass partition can separate the space speedy and conveniently.

2.Top hung system without  floor track,make the space more beautiful.

3.The movable glass wall panel is made of high density aluminum frame,special rubber,ground bolt and transparent tempered glass or frosted tempered glass.

4.Around the panel, there is sound insulation rubber, it can help to insulate the sound entering.

5.The operable partition finished panel is hanging on the aluminum track, assembled with muti direction wheels. Good for operation.

Technical parameters


Series

BG65 Glazing Glass Partition

BG85 Aluminum Frame Glass Partition

BG85 Sound proof Glass Partition

Panel suspension

Top hung only

Top hung only

Top hung only

Track system

Single or twin point

Single or twin point

Single or twin point

Panel thickness

36mm

85mm

85mm

Panel height

Up to 3000mm

Up to 6000mm

Up to 6000mm

Max height

3000mm

6000mm

6000mm

Panel width

800-1100mm

800-1100mm

800-1100mm

Frame construction

Top and bottom aluminum

Aluminum frame

Aluminum frame

Glass thickness

10mm or 12mm single glass

10mm or 12mm single glass

double 10mm glass

Fire safety

Optional Class O

Optional Class O

Optional Class O

Vertical profiles

n/a

n/a

Aluminum anodised with sealing profiles

Retractable seals

n/a

n/a

Aluminum black with double rubber seals

Operation of seals

n/a

n/a


Pass doors

Fixed full height door

Fixed full height door

Fixed full height door

Locking

Optional lock to panel

Optional lock to panel

Optional lock to panel

Sound insulation

n/a

n/a

n/a

Weight

Approx 30 kg/sq M

Approx 32 kg/sq M

Approx 50 kg/sq M


Surface

Movable glass partition usually used in office,restaurant,hotel  lobby,wharehoue and any other place where we want to see the inside view and with less stringent insulation requirements. It is a good room divider,make our space flexible,maximize the use of our room.

For the glass partition wall,there are two type:aluminum frame partition and frameless aluminium partition. They can be customized to transparent tempered glass partition or frosted tempered glass partition,as following shows:product-EBUNGE-img

Packaging & Shipping

Our normal packing for movable partition wall is carton package, MDF batten on four section sides ,foam board on both front face. For glass partition, we will make a MDF box with outside iron frame.product-Collapsible office partition walls glass folding door glass 12mm frameless operable glass pa

About us

Guangdong Bunge Building Matarial Industrial Co.,Ltd is professional company in manufacturing movable partitions.It also artistically designs and carefully does research and development(R&D).The company has adopted the advance partition technology of USA,Germany and Denmark.We have professional staffs with more than 10 years of experience in design,production and installation.

Our product(movable partition)are widely used in the hotel,banquet hall,meeting room,exhibition hall,conference room,International convention center,KTV,upscale restaurants,office building,school,hospital and others.

Nowadays,the modern trend in building needs more flexibility and convenience to use the space of their rooms.Most of the building designers like to prepare open plan space,sound proof effect,and easy to operate.The solution of the designers need is the movable partition.

Bunge movable partition products as follow:
1.Ordinary Series:65MM,85MM;
2.High Sound Proof Series:85MM,100MM;
3.Super High Series:Steel Track System
4.Glass Series:65MM & 85MM Aluminum Frameproduct-collapsible office partition walls glass-EBUNGE-img

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...