cinema wood sound absorbing panels mdf Bunge Brand

cinema wood sound absorbing panels mdf Bunge Brand

Model
BG grooved acoustic panels
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
50000 square meters
MOQ
No MOQ
Packing Details
Paper carton
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Wooden grooved acoustic panels
Feature: Sound proofing
Aluminium frame thickness: 12,15,18 mm
Partition material: Black fleece
Finish: Melamine,Veneer,MDF
Application: Hotel,banquet hall,conference hall,etc.
General use: Sound proofing materials
Material: MDF+Melamine
Function: Fireproof and eco-friendly
Size: 2440*133 mm,2440*197 mm
Color: Can be customized
Style: Modern
Product Comparison
glass partitions has the following advantages: well-chosen materials, reasonable design, stable performance, excellent quality, and affordable price. Such a product is up to the market demand.With a focus on product quality, Guangdong Bunge Building Material Industrial Co.,Ltd firmly believes that details create quality products. We insist on controlling the quality from details. We strictly monitor all aspects of the production and screen out unqualified inferior products. All this guarantees movable walls are formaldehyde-free, pollution-free, safe, eco-friendly and durable.The main differences between Guangdong Bunge Building Material Industrial Co.,Ltd's glass partitions and similar products are as follows.
  • Bunge-Sound Absorbing Wall Panels Manufacture | Sound Proofing Building Material
    v s
    Bunge-Sound Absorbing Wall Panels Manufacture | Sound Proofing Building Material-1
Application Scope
Guangdong Bunge Building Material Industrial Co.,Ltd's movable walls is widely used in the Manufacturing Decoration Materials industry.Guangdong Bunge Building Material Industrial Co.,Ltd has many years of industrial experience and great production capability. We are able to provide customers with quality and efficient one-stop solutions according to different needs of customers.Guangdong Bunge Building Material Industrial Co.,Ltd's movable walls are made of safe, eco-friendly and wear-resistant and durable materials. They won't cause pollution to the environment. They feature fashionable design, excellent performance, long service life, easy cleaning and installation. They are unanimously praised and trusted in the industry.
  • Bunge-Sound Absorbing Wall Panels Manufacture | Sound Proofing Building Material-2
Company Advantages
1. Bunge acoustic panel material adopts premium raw materials that can be a total guaranteed of quality. The product becomes popular for its movability
2. Certified quality: It has passed through many quality certifications and has been manufactured in strict accordance with the requirements of international quality standards. Its quality is completely guaranteed. It adopts the convenient hanging system without the floor track
3. Guangdong Bunge Building Material Industrial Co.,Ltd initiates the overseas production bases for sound absorbing panels. Equipped with a sealing device, the product is praised for its tight sealing performance

Sound Proofing Building Material Wooden Grooved Acoustic Wall Panels for Auditorium

Wooden Grooved Acoustic Panels Deatils


 

1. Basic mterial : It is made of high density moistureproof and mildewproof board,the thickness is 9mm,12mm,15mm or 18mm.It is also acceptable to use the other board according to the customers' requirement.


2. Facing : Melamine facing,color chosen according to the company's color board.


3. Sound absorption thin felt : It is black,affixed to the back of the sound absorption board,nonflammable and sound absorption.


4. Batten width : 133 or 197 mm,or made according to customers' requirement.


5. Batten length : 2440mm at maximum

.

6. Acceptable tolerance : For width it is 0.1mm,for length it is 2mm.


7.Combination : 90 degree angle for the rabbet and notch,batten length is made according to the need.



Bunge-Professional Sound Dampening Panels Noise Panels Supplier

Technical Information
Grooved Wooden Acoustic Panel
1.StructureBasic Material ,Finish&Back Finish
2.Basic MaterialE1 MDF,FR MDF ,MGO Combination Board etc.
2. Front FinishMelamine ,Natural Wood Veneer,Paint,etc.
3. Back FinishBlack Acoustic Felt
4.Standard Size2440*133 , 2440*197mm,etc.
5.Standard Thickness12/15/18mm
6. Standard Pattern13-3,14-2,28-4,59-5,etc.
7. Installation1.Lightweight steel keel system2.Wooden batten system
8. Fire rateCan meet China Standard Class B1 and BS476 Part 7 Class 1
9. Eco levelCan meet China and EU Standard Class E1
10.ApplicationsGymnasium,hotels,exhibition centers,schools,studio etc.
11.Is customizedCan be Customized

Bunge-Professional Sound Dampening Panels Noise Panels Supplier-1

Wooden Grooved Acoustic Panels Applications

1. Professional space for timbre effect and decoration: Studio, recording room, listening room, rehearsal hall etc.

 

2. Recreational place for sound effect and decoration:Theater,cinema,indoor gymnasium, disco,KTV etc.

 

3. Sound-absorbing place for secret or privacy and decoration:Meeting room, office,hall and hotel etc.

 

4. Noisy industry for health and environmental protection:Airport,railway, bus station,factory and workshop

etc.


Bunge-Professional Sound Dampening Panels Noise Panels Supplier-2

Wooden Grooved Acoustic Panels Finishes

BUNGE wooden grooved acoustic wall panels are available in three main finishes, Wood Veneer, High quality paint finish, and decorative Laminate. This gives the designer almost an unlimited choice in designing the wall or ceiling finish. The grooved acoustic wall panels range includes standard wood veneers chosen from the most popular colours available, as is the same with the High quality decorative laminates.

 

REAL WOOD VENEER

 

The standard range of wood veneers is available on an exstock basis, however Tengfei can choose from international suppliers quality veneers to match your choice

 

Paint Finish

 

BUNGE wooden grooved acoustic panels are available in either Pantone or RAL colours. This gives almost an unlimited choice in selection. The paint finish is in a high quality 2pac finish and can be supplied in Gloss, Matt or Satin finishes.


Bunge-Professional Sound Dampening Panels Noise Panels Supplier-3


Installation Methods

A)Preparation


1.The place of installation must be dry,with the lowest temperature no less than 10 degrees celsius.


2.the acoustic panels to be installed must be placed in the place of installation for at least 48h in  order to adapt the indoor environment.


3.After installation ,the largest humidity changing rate of the place of installation should be between 40%-60%.


4.The distance between each wood keel must be less than 500mm and that between each light steel keel should no more than 600mm.


B)Installation


1.Confirm the place of installation ,determine the horizontal and vertical lines and the reserved measurements for the electric wire socket ,pipes.etc.


2.Calculate the actual construction measurements and cut the part of acoustic panels if needed.


3.Start to install and follow the rules:from left to right,from bottom too top.for horizontally installation.make the grooves up;for the vertical installation,make the tougues on the right.for real wood veneer acoustic panels that have requirements on the direction of the stripes,the panels should be installed according to the pre-marked sequence numbers.


C)Installation system


1.Lightweight steel keel system


2.Wooden batten system

Bunge-Professional Sound Dampening Panels Noise Panels Supplier-4


                                   Melamine ,natural wood veneer,paint,etc                                    


Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd is a leading expert in sound absorbing panels manufacture in China.
2. Guangdong Bunge Building Material Industrial Co.,Ltd has a production base for the research and development of soundproof wall panels.
3. Guangdong Bunge Building Material Industrial Co.,Ltd hopes to bring our sound dampening panels successfully to the world. Get an offer!

                                   Melamine ,natural wood veneer,paint,etc                                    

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...