Home  >  Quality PRODUCTS For sell  >  Best Movable Walls Factory  >  Sliding Partitions Wholesale  > 

church sliding room dividers retractable installing Bunge company

church sliding room dividers retractable installing Bunge company

church sliding room dividers retractable installing Bunge company

Model
85 mm conference room partitions
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes.
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Operable walls
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Conference room,office,banquet hall
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly
Size: 9mm*1220mm*2440mm
Color: Multi color
Style: Sliding
Enterprise Strength
  • Bunge Building Decoration Engineering has a number of professional and technical training teams and a group of experienced management teams, which builds a stable foundation for the development.
  • Bunge Building Decoration Engineering firmly believes that there is always going to be better. We wholeheartedly provide each customer with professional and quality services.
  • In the future, Bunge Building Decoration Engineering will always adhere to the business philosophy of 'survive with quality, develop with reputation'. We strive to transform the development mode and deepen the optimized combination of the supply chain, value chain, and management chain. Moreover, we implement the scientific brand development strategy to create the first-class brand within the industry. Our goal is to become a leader in the domestic market.
  • Bunge Building Decoration Engineering has developed the business in the Manufacturing Decoration Materials industry for years. We have established an advanced production line and have developed based on independent production. Now we enjoy a relatively huge influence in the industry.
  • Bunge Building Decoration Engineering's sales network covers from the whole country to some countries and regions such as North America, Europe, and Southeast Asia.
Company Advantages
1. A magnetic strip is applied to the product to ensure strong functionality. Bunge Building Decoration is yBunge single sBungece for a wide array of sliding partition walls products.
2. It is widely used for privacy protection. By cause of the design of sliding walls residential,Bunge enjoys a good reputation.
3. It will not be easy to swing after being reliably installed. Bunge is becoming increasingly popular in sliding room dividers,sliding room partitions field.


Wooden Acoustic Operable Walls Conference Room Partitions


Bunge-Professional Sliding Wall Dividers Movable Wooden Partition Manufacture

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.

Bunge-Professional Sliding Wall Dividers Movable Wooden Partition Manufacture-1

Description


Conference room wall partition is a kind of movable wall that can divide a large space into a small space. It can serve as a multi-purpose room with multiple functions.


Top hanging system without floor track. Also is seal and has good sound insulation.

 

Our factory can provide four series product let you have a choosing. Panel height is from finished floor to ceiling or beam. Panel width is from wall to wall.


Operable partition wall usually use in banquet hall,conference room,classroom,office and etc.


Our main structure that is aluminium frame with mdf board, inside soundproof rock wool and aluminium keen.


Bunge-Professional Sliding Wall Dividers Movable Wooden Partition Manufacture-2Bunge-Professional Sliding Wall Dividers Movable Wooden Partition Manufacture-3Bunge-Professional Sliding Wall Dividers Movable Wooden Partition Manufacture-4
Technical information


SeriesBG 65BG 85 BG 100
Panel SuspensionTop hung onlyTop hung onlyTop hung only
Track systemSingle or twin pointSingle or twin pointSingle or twin point
Panel thickness 65 mm85 mm100 mm
Max height4 m6 m15 m
Panel width600-1200 mm600-1200 mm600-1200 mm
Face material9 mm MDF Board9 mm MDF Board9 mm MDF Board
Retractable sealsAluminium black with double rubber sealsAluminium black with double rubber sealsAluminium black with double rubber seals
Operation of sealsManual,with crank handleManual,with crank handleManual,with crank handle
Sound insulation20-35dB30-45dB35-53dB
Surface


Conference room acoustic wall partition has three kinds surface.


First is mdf melamine,it can be more easy to clean.


Second is leather or fabric with hard cover inside aluminium frame.


Third is leather or fabric with hard cover hidden aluminium frame.


Fourth is mdf bare finish,client can paint prefer color on mdf board in local city.


Also has plywood finish,customers can paste wallpaper on it.


If client prefer to veneer surfrace,we should know whether needs paint color,and whether needs other extra surfrace.


If client prefer to use mirror  surface,mirror thickness is 5 mm,basic board is 5 mm.

Bunge-Professional Sliding Wall Dividers Movable Wooden Partition Manufacture-5Bunge-Professional Sliding Wall Dividers Movable Wooden Partition Manufacture-6

Bunge-Professional Sliding Wall Dividers Movable Wooden Partition Manufacture-7

Aluminum Components of Retractable Partitions System


Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the retractable partitions panels with wheels.


Wheels/Rollers:  It is the carrier for the retractable partitions,let the panels move more flexibly.Pulley bearing is more than 1600 KGS.


Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.


Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.


Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.


Handle: Operate the retractable being up and down.


Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.


Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the retractable partitions.


MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Professional Sliding Wall Dividers Movable Wooden Partition Manufacture-8Bunge-Professional Sliding Wall Dividers Movable Wooden Partition Manufacture-9

Operable partition wall advantage

No rail suspension:the floor has no track, just install the track on the ceiling.


Stable and safe:Stable and reliable after partitioning, not easy to swing.


Retractable acoustic seals at top and bottom, operated either by quick release handle or semi-automatically with electronic controls.


Sound insulation and environmental protection:sound insulation effect is good,the sound insulation coefficient can reach 53 dB.


Insulation and energy saving: Excellent thermal insulation performance,according to different occupancy rates,

the sound proof partitions can divide a large space into small spaces to reduce air conditioning power consumption.


Efficient fire prevention: Sound proof partitions are made of high-efficiency fireproof material and has good fireproof performance.


Retractable and flexible:the sound proof partitions are freely retractable and flexible, and one person can complete the whole process of partitioning.


Bunge-Professional Sliding Wall Dividers Movable Wooden Partition Manufacture-10

Bunge-Professional Sliding Wall Dividers Movable Wooden Partition Manufacture-11Bunge-Professional Sliding Wall Dividers Movable Wooden Partition Manufacture-12

Our service


1.Profession--We have professional sales staff. Any questions will be replied within 24 hours.


2.Price--Because we are factory,so we can provide nice quality and lower price products.


   Series 65,more than 80 square meters, free sample.


   Series 85,quantity up to 120 square meters, extra 20 rollers.


   Sereis 100, more than 200 square meters, discount 300 USD.


3.Service--Easy and convenient to transport,we promise timely delivery date, and good after-sale service.

  

4.Team--We have our own engineering department, according to your request for your tailor-made for your product.


5.Installing--Our engineer can come to teach installing,and we will also supply installing drawings and video.


Bunge-Professional Sliding Wall Dividers Movable Wooden Partition Manufacture-13

Packing & shipping


Conference room partition wall when we finished production, we will use carton packing and mdf board to pack movable panels. 


And we will also make one or more packing boxes for clients.It can reduce damagement during transportation.


We usually transport movable panels by sea, such as CIF price.


Some aluminium profile,sliding track,glass clips and other accessories we can transport by courier, like DHL or Fedx.


Bunge-Professional Sliding Wall Dividers Movable Wooden Partition Manufacture-14Bunge-Professional Sliding Wall Dividers Movable Wooden Partition Manufacture-15

Bunge-Professional Sliding Wall Dividers Movable Wooden Partition Manufacture-16


Company Features
1. Since its inception, Guangzhou Bunge Building Decoration Engineering Co., Ltd has been developing rapidly.
2. With our strong technical support, Guangzhou Bunge Building Decoration Engineering Co., Ltd is ready to build a solid foundation in the future.
3. Guangzhou Bunge Building Decoration Engineering Co., Ltd aims to provide best service for all of our customers. Check it!
Product Message
社媒暂无评论
Contact
/* 客户要求添加的 */