China Hot Sale Banquet Hall Removable Acoustic Room Partitions Hotel Acoustic Movable Walls
Finished Project
Thanks for the trust from the client who comes from India.
This banquet hall operable partition walls project finished and delivered in March,2018.
Totally 4 sets of walls. Height:3.76 meters. 185 square meters.
Our technician also went to project to supervise the installation. After installing the tracks system well, our technician came back and the client need us to do the pocket door for him.
Finish: Melamine Surface. Color Chart: CS-3061F.
Acoustic Room Partitions Walls technical information
Series | BG65 | BG85 | BG100 |
Panel suspension | Top hung only | Top hung only | Top hung only |
Panel thickness | 65mm | 85mm | 100mm |
Max height | 4000mm | 6000mm | 18000mm |
Panel width | 500-1200 mm | 500-1200 mm | 500-1200 mm |
Face material | 9mm | 9mm | 12 mm |
Pass doors | Single door or Double door | ||
Sound insulation | 20-32dB Rw | 28-36dB Rw | 32-50dB Rw |
Finish Material | Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc. (Customized) |
Acoustic Room Partitions Walls features
1. The acoustic room partitions walls is a hanging system, which have the ceiling rails, but have no floor reails. So it will not damage the floor or carpet at the project site.
2. All of the acoustic room partitions walls can be customized, such as the size, the colors and the surfaces.
3. The acoustic room partitions walls can help you divide a big space into 2 or more smaller rooms. When you do not use them, they can be parked to the parking zone conveniently and quickly.
4. The operation is very easy, 1 person can finish the whole operation.
5. More than 60 kinds of colors to choose.
6. Different surfaces also available. Such as the MDF, Plywood, Melamine, Veneer, Fabric and Leather surface.
7. Single or Double Pass Door also available, which can help you come in and out easily.
Related products
1. Movable partition walls, operable walls, movable doors, acoustic room dividers, sound proof partitions.
2. Office furniture: office workstations, office chairs, conference chairs, stackable conference tables.
3. Glass partitions: movable glass partitions or fixed glass partitions for office or conference room also available.
4. Partition walls accessories: partition walls tracks and wheels.
Acoustic Room Partitions Walls packaging
A short time of production-ONLY 5-7 DAYS
Quick and Safe Shipping
Package by Wooden Boxes
About us
Guangdong Bunge Building Material Industrial Co.,Ltd is a professional company in manufacturing Movable Partition Walls System. We are the real manufacturer, we have our own factory and showroom in Guangzhou, China, which covers an area over 3000 m². And we have around 10 years experience in it. There is a ultra-high system sample in our factory, over 8 meters. Every client who came to our factory was amazing in it. BUNGE Factory is always providing the clients with nice quality and competitive price movable wall system, and we are so strict to inspect the quality before delivering. So far, we have exported to USA, Australia Uganda, Lebanon, Sri-Lanka, Saudi Arabia, Philippines and many other countries.
As a professional manufacturer, we not only produce, we also design, deliver and have the after-sales service for clients. If the client need installation service, we also can send our technicians to supervise the installation. In addition, we also can supply free design to every client and we will reply in 12 hours if the clients have any questions.
Copyright © 2018 Guangdong Bunge Building Material Industrial Co.,Ltd. | All Rights Reserved
Hello, please leave your name and email here before chat online so that we won't miss your message and contact you smoothly.