In addition to dividing the space smartly, what else does a mobile partition do?In today's decoration,
people pay more attention to effect and quality. Mobile partitions are
sound proof flexible partition products in addition to fixed partitions.
They are smart to deal with all kinds of space problems. The feature of
being movable is to let its name spread quickly. Hotels, restaurants,
exhibition halls, banquet halls, schools, companies, etc. all use it to
replace the solid wall in the interior, which can not only orderly
create different pattern spaces, but also make the space full of
changing colors at any time.In the modern style of decoration,
this mobile partition wall is also in keeping with the trend.
Considering the factors of daylight, it is convenient to use in some
places. Glass can be embedded in the partition wall to allow more light
to pass through the room. In addition, The partition system can also be
made into a hollowed-out style, which has a classic Chinese style, with
delicate and exquisite processing methods.The sound proof mobile
partition wall is a wall that distinguishes the interior of the space,
separating the spaces with different functions, maintaining
communication within the space, and replacing the way of the solid wall
to isolate the space. It is used in many places in life. It can be used
to separate spaces in large places, and different spaces can be used for
different purposes. For large places such as hotels, it can be used to
reduce the number to zero. For scattered uses, it can also save space
and energy, whether it is life It is very much needed for business.Through
the above introduction, I believe that everyone is no stranger to
mobile partitions. Mobile partitions are movable partitions in hotels,
restaurants, office buildings, and other high-end places. So what are
the characteristics of mobile partitions? What is the basic function of
its mobile partition?1.Protect the wallI know that some
"partition walls" in the construction not only have to bear the load as
load-bearing members, but also need to make envelope structures
according to the needs of production and day, to achieve the purposes of
sheltering from wind and rain, heat insulation, noise prevention, and
safety. , And some moving intervals only coordinate the protection role.
Therefore, the moving partition decoration should be based on the
functions and requirements of different walls, improve the durability of
the wall, compensate for and improve the lack of functions of the wall,
and do not affect the normal function of the data of the wall.2. Decoration appearanceAlthough
the appearance of the building depends on the artistic treatment
methods such as the volume, method, share, standard, and true and false
comparison of the building, the texture, color, and line shape reflected
in the wall decoration are also important factors that constitute the
overall effect. Let us assume that different mobile wall materials with
different structures have different structures and will have different
applications and decoration effects.The current material for
partitioning is an aluminum alloy keel, which is composed of tempered
glass, triamine plate, steel plate and other materials. Such a high
interval can pass through a good perspective, good lighting, and easy to
clean. As the months get older, there will be some dust flying in the
seams of the high-aluminum alloy keel. At this time, it is possible to
use a vacuum cleaner to suck it out. The appearance of the plate may be
steel, do not use water or detergent to scrub, just use feather duster
or soft towel to quietly scrub.
Read More>>