Meeting Room Partition Walls

Home  > APPLICATION  > Meeting Room Partition Walls  > 

Ceiling Hung Acoustic Classroom Meeting Room Folding Door Fabric Partitions Philippines

Ceiling Hung Acoustic Classroom Meeting Room Folding Door Fabric Partitions Philippines

Ceiling Hung Acoustic Classroom Meeting Room Folding Door Fabric Partitions Philippines

Model
65 mm acoustic fabric partitions
Brand Name
EBUNGE
Original
Guangzhou, China
Payment Terms
T/T
Delivery Time
15 - 20 days
Supply Ability
50000 square meters per month
MOQ
No MOQ, small quantity welcomed
Packing Details
Paper carton, outside with wooden box
OEM/ODM
Accept
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Acoustic fabric partitions
Feature: Sound proofing
Finish: Melamine
Application: Meeting room partitions
General use: Office furniture
Material: MDF + Aluminum
Sample: Free
Height: 2 - 4 meters
Based board: 9 mm MDF Board
Thickness: 65 mm(2 9/16 inch)
Function: Divide the space
Size: Partition walls customized
Color: Can be customized
Style: Folding and sliding

Ceiling Hung Acoustic Classroom Meeting Room Folding Door Fabric Partitions Philippines


Finished Project


In September,2018, we finished a acoustic folding fabric partitions project in Uganda. Totally 7 sets of wall, around 238 square meters. 


This project is a little different, the client chose 5 different colors as it is for a school classroom. They wanted the environment more colorful. The surface is also melamine, the biggest features is that there are more than 60 colors to choose and very easy to clean. We also sent our engineer Mr.Zeng to supervise the installation.


Thanks for the trust from the client. In May,2019, the client also contacted us for the acoustic folding fabric partitions orders. The same size, same surface and same colors, because they will use them in the same school, just the different floor.


Everything goes well and the client felt satisfied with our acoustic folding fabric partitions system and happy to cooperate with BUNGE Company.

Aluminum Frame Dubai Fire Proof DIY Movable Acoustic Wall Partition for AuditoriumAluminum Frame Dubai Fire Proof DIY Movable Acoustic Wall Partition for Auditorium


Technical Information


ModelBG65BG85BG100
Suspension SystemHanging System, with ceiling rails
Basic Thickness65mm85mm100mm
Max HeightMax 3800mmMax 6000mmMax 8000mm
Width800 -1230mm
Floor/ceiling Sealing
strength
Telescopic aluminum tube with rubber strip
Side Walls Sealing
Strength
Double seal tape
Base Board Thickness9 mm9 mm12 mm
Vertical ProfilesAluminum anodised with sealing profiles
Retractable SealsAluminum black with double rubber seals
OperationManual System, with supplied operating handle
Pass DoorsSingle or Double Pass Through Door Available
WeightApprox 22-35 kg/m²Approx 25-40 kg/m²Approx30-48 kg/m²
Finish OptionsPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc. (Customized)

Aluminum Frame Dubai Fire Proof DIY Movable Acoustic Wall Partition for Auditorium


Client Visiting

Quality is the culture of BUNGE Company.

 

We are always focus on the quality of acoustic folding fabric partitions, and when the client come to visit our factory,all of them are satisfied on our quality.

Aluminum Frame Dubai Fire Proof DIY Movable Acoustic Wall Partition for AuditoriumAluminum Frame Dubai Fire Proof DIY Movable Acoustic Wall Partition for Auditorium


Advantages


1. The acoustic folding fabric partition is a hanging system, which have the ceiling rails, but have no floor reails. So it will not damage the floor or carpet at the project site.

 

2. All of the acoustic folding fabric partitions can be customized, such as the size, the colors and the surfaces.

 

3. The acoustic folding fabric partitions can help you divide a big space into 2 or more smaller rooms. When you do not use them, they can be parked to the parking zone conveniently and quickly.

 

4. The operation is very easy, 1 person can finish the whole operation.

 

5. More than 60 kinds of colors to choose.

 

6. Different surfaces also available. Such as the MDF, Plywood, Melamine, Veneer, Fabric and Leather surface.

Aluminum Frame Dubai Fire Proof DIY Movable Acoustic Wall Partition for Auditorium


Packaging & Delivery


Aluminum Frame Dubai Fire Proof DIY Movable Acoustic Wall Partition for Auditorium


Our Factory


Guangdong Bunge Building Material Industrial Co.,Ltd is a professional company in manufacturing Movable Partition Walls SystemWe are the real manufacturer, we have our own factory and showroom in Guangzhou, China, which covers an area over 3000 m². And we have around 10 years experience in it. There is a ultra-high system sample in our factory, over 8 meters. Every client who came to our factory was amazing in it. BUNGE Factory is always providing the clients with nice quality and competitive price movable wall system, and we are so strict to inspect the quality before delivering. So far, we have exported to USA, Australia Uganda, Lebanon, Sri-Lanka, Saudi Arabia, Philippines and many other countries.

 

As a professional manufacturer, we not only produce, we also design, deliver and have the after-sales service for clients. If the client need installation service, we also can send our technicians to supervise the installation. In addition, we also can supply free design to every client and we will reply in 12 hours if the clients have any questions.

Aluminum Frame Dubai Fire Proof DIY Movable Acoustic Wall Partition for Auditorium




Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...