EBUNGE  > 

AI - Page Sitemap

 > 

BUNGE movable partition

BUNGE movable partition

BUNGE movable partition

Model
85 mm sound proof partitions
Brand Name
EBUNGE
Original
Guangzhou,China
Payment Terms
T/T or Western Union
Delivery Time
15-20 days
Supply Ability
50000 square meters per month
MOQ
No MOQ,small quantity welcomed
Packing Details
Paper carton,outside with wooden boxes
OEM/ODM
Accept
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Partitions ror office
Feature: Sound proof
Finish: Melamine
Application: Conference room partitons
General use: Office furniture
Material: MDF+Aluninum
Sample: Free
Height: 2 - 6 meters
Based board: 9 mm MDF Board
Thickness: 85 mm(3 1/4 Inch)
Function: Divide space
Size: Partiton walls customized
Color: Optional
Style: Folding and sliding
Product Comparison
BUNGE PARTITIONS's office furniture is manufactured in strict accordance with relevant national standards. Every detail matters in the production. Strict cost control promotes the production of high-quality and priced-low product. Such a product is up to customers' needs for a highly cost-effective product.After being improved greatly, BUNGE PARTITIONS's office furniture is more advantageous in the following aspects.
  • product-EBUNGE-BUNGE movable partition-img
    BUNGE movable partition-EBUNGE-img-1
Company Advantages
1. We can meet you any material requirements for movable partition, no matter plastic material , wooden material or other material.
2. The product is known for its less maintenance and outstanding performance.
3. This product has long and durable service life.
4. This product is environmentally friendly. It is free of lead and mercury and thus contributing to the sustainability of the environment.
5. Products play an important role in reducing or eliminating the amount of human tasks that need to be completed, which helps reduce labor costs.

Acoustic Moveable  Partitions For Office Walls for Conference Room


Finished Project


Thanks for the trust from the client who comes from India.

This banquet hall operable partition walls project finished and delivered in March,2018.

Totally 4 sets of walls. Height:3.76 meters. 185 square meters. 


Our technician also went to project to supervise the installation. After installing the tracks system well, our technician came back and the client need us to do the pocket door for him.

Finish: Melamine Surface. Color Chart: CS-3061F.

BUNGE movable partition-1

BUNGE movable partition-2

BUNGE movable partition-3

BUNGE movable partition-4


 Partitions for office technical information


Series

BG65

BG85

BG100 

Panel suspension

Top hung only

Top hung only

Top hung only

Panel thickness

65mm

85mm

100mm

Max height

4000mm

6000mm

18000mm

Panel width

500-1200 mm

500-1200 mm

500-1200 mm

Face material

9mm

9mm

12 mm

Pass doors

Single door or Double door

Sound insulation

20-32dB Rw

28-36dB Rw

32-50dB Rw

Finish Material

Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, 

Vinyl, Painting, etc.  (Customized)

BUNGE movable partition-5


 Partitions For Office Walls features


1. The  partitions for office walls is a hanging system, which have the ceiling rails, but have no floor reails. So it will not damage the floor or carpet at the project site.

2. All of the partitions for office wallscan be customized, such as the size, the colors and the surfaces.


3. The  partitions for office walls can help you divide a big space into 2 or more smaller rooms. When you do not use them, they can be parked to the parking zone conveniently and quickly.

4. The operation is very easy, 1 person can finish the whole operation.

5. More than 60 kinds of colors to choose.

6. Different surfaces also available. Such as the MDF, Plywood, Melamine, Veneer, Fabric and Leather surface.

7. Single or Double Pass Door also available, which can help you come in and out easily.

BUNGE movable partition-6


Related products


1.  Movable partition walls, operable walls, movable doors, acoustic room dividers, sound proof partitions.

2. Office furniture: office workstations, office chairs, conference chairs, stackable conference tables.

3. Glass partitions: movable glass partitions or fixed glass partitions for office or conference room also available.

4. Partition walls accessories: partition walls tracks and wheels.

BUNGE movable partition-7


 Partitions For Office Walls packaging 


A short time of production-ONLY 5-7 DAYS


Quick and Safe Shipping


Package by Wooden Boxes

BUNGE movable partition-8


About us

Guangdong Bunge Building Material Industrial Co.,Ltd is a professional company in manufacturing Movable Partition Walls System. We are the real manufacturer, we have our own factory and showroom in Guangzhou, China, which covers an area over 3000 m². And we have around 10 years experience in it. There is a ultra-high system sample in our factory, over 8 meters. Every client who came to our factory was amazing in it. BUNGE Factory is always providing the clients with nice quality and competitive price movable wall system, and we are so strict to inspect the quality before delivering. So far, we have exported to USA, Australia Uganda, Lebanon, Sri-Lanka, Saudi Arabia, Philippines and many other countries. 

As a professional manufacturer, we not only produce, we also design, deliver and have the after-sales service for clients. If the client need installation service, we also can send our technicians to supervise the installation. In addition, we also can supply free design to every client and we will reply in 12 hours if the clients have any questions.

BUNGE movable partition-9





Company Features
1. BUNGE is greatly popular in global market for its stable quality.
2. The high-quality movable partition indicates that BUNGE has broken the barriers to technological innovation.
3. Based on steady development and innovation, we are going forward to be one of the most professional and competitive company. Under this goal, we are investing more capital and talents in R&D. We put emphasis on customer focus. We ensure that all aspects of our company will put the customers' satisfaction first. Within our own facilities, we work on reducing our water consumption, carbon emissions and waste stream, now and in the future. Our vision is to significantly improve customer satisfaction. We are working on a plan that assists specialists at the customer interface to gain fresh insights into customer needs and preferences, so as to ultimately create cost-effective values to customers.
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...