EBUNGE  > 

AI - Page Sitemap

 > 

BUNGE foldable partition doors

BUNGE foldable partition doors

BUNGE foldable partition doors

Model
85 mm movable wall partitions
Brand Name
EBUNGE
Original
Guangzhou, China
Payment Terms
T/T or Western Union
Delivery Time
15 - 20 days
Supply Ability
50000 square meters per month
MOQ
No MOQ, small quantity welcomed
Packing Details
Paper carton, outside with wooden box
OEM/ODM
Accept
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Movable wall partitions
Feature: Sound proof
Finish: Melamine
Application: Hotel restaurant partition walls
General use: Commercial furniture
Material: MDF + Aluminum
Sample: Free
Height: 2 - 6 meters
Based board: 9 mm MDF Board
Thickness: 85 mm(3 1/4 Inch)
Function: Divide space
Size: Partition walls customized
Color: Optional
Style: Folding and sliding
Enterprise Strength
  • BUNGE PARTITIONS insists on the principle to be active, prompt, and thoughtful. We are dedicated to providing professional and efficient services for customers.
Company Advantages
1. The production of BUNGE foldable partition doors is supported by a professional technical team.
2. The product is built to last. Thanks to its durable construction, it is able to withstand great abuse under harsh environments.
3. You give trust our movable partition and we will give good quality in return.

Hotel Restaurant Sliding Acoustic Partition Wall / Hanging Soundproof Movable Wall Partitions


Finished Project


Thanks for the trust from the client who comes from India.

This banquet hall operable partition walls project finished and delivered in March,2018.

Totally 4 sets of walls. Height:3.76 meters. 185 square meters. 


Our technician also went to project to supervise the installation. After installing the tracks system well, our technician came back and the client need us to do the pocket door for him.

Finish: Melamine Surface. Color Chart: CS-3061F.

BUNGE foldable partition doors-1

BUNGE foldable partition doors-2

BUNGE foldable partition doors-3

BUNGE foldable partition doors-4


Movable wall partitions technical information


Series

BG65

BG85

BG100 

Panel suspension

Top hung only

Top hung only

Top hung only

Panel thickness

65mm

85mm

100mm

Max height

4000mm

6000mm

18000mm

Panel width

500-1200 mm

500-1200 mm

500-1200 mm

Face material

9mm

9mm

12 mm

Pass doors

Single door or Double door

Sound insulation

20-32dB Rw

28-36dB Rw

32-50dB Rw

Finish Material

Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, 

Vinyl, Painting, etc.  (Customized)

BUNGE foldable partition doors-5


Movable wall partitions features


1. The hotel restaurant movable wall partition is a hanging system, which have the ceiling rails, but have no floor reails. So it will not damage the floor or carpet at the project site.

2. All of the hotel restaurant movable wall partitions can be customized, such as the size, the colors and the surfaces.

3. The hotel restaurant movable wall partitions can help you divide a big space into 2 or more smaller rooms. When you do not use them, they can be parked to the parking zone conveniently and quickly.

4. The operation is very easy, 1 person can finish the whole operation.

5. More than 60 kinds of colors to choose.

6. Different surfaces also available. Such as the MDF, Plywood, Melamine, Veneer, Fabric and Leather surface.

7. Single or Double Pass Door also available, which can help you come in and out easily.

BUNGE foldable partition doors-6


Related products


1.  Movable partition walls, operable walls, movable doors, acoustic room dividers, sound proof partitions.

2. Office furniture: office workstations, office chairs, conference chairs, stackable conference tables.

3. Glass partitions: movable glass partitions or fixed glass partitions for office or conference room also available.

4. Partition walls accessories: partition walls tracks and wheels.

BUNGE foldable partition doors-7


Movable wall partitions packaging 


A short time of production-ONLY 5-7 DAYS


Quick and Safe Shipping


Package by Wooden Boxes

BUNGE foldable partition doors-8


About us

Guangdong Bunge Building Material Industrial Co.,Ltd is a professional company in manufacturing Movable Partition Walls System. We are the real manufacturer, we have our own factory and showroom in Guangzhou, China, which covers an area over 3000 m². And we have around 10 years experience in it. There is a ultra-high system sample in our factory, over 8 meters. Every client who came to our factory was amazing in it. BUNGE Factory is always providing the clients with nice quality and competitive price movable wall system, and we are so strict to inspect the quality before delivering. So far, we have exported to USA, Australia Uganda, Lebanon, Sri-Lanka, Saudi Arabia, Philippines and many other countries. 

As a professional manufacturer, we not only produce, we also design, deliver and have the after-sales service for clients. If the client need installation service, we also can send our technicians to supervise the installation. In addition, we also can supply free design to every client and we will reply in 12 hours if the clients have any questions.

BUNGE foldable partition doors-9



Company Features
1. Since the establishment of brand BUNGE, Guangdong Bunge Building Material Industrial Co.,Ltd enjoy higher reputation and its movable partition is warmly welcomed.
2. The factory is reasonably built in line with the requirements for standard workshop. We have reasonable arranged production lines and newly advanced facilities have been brought in to increase productivity.
3. Our goal is to be the trusted manufacturer - design, produce, and deliver high-quality products for our customers and consumers and to provide outstanding services. We are heading towards green production and become a "green enterprise". We have conducted business activities in an environmentally positive way, such as controlling production waste scrap and effectively utilizing resources. We intend to provide our customers with the best products and service possible, through continuous improvement. We ensure that our products and services consistently meet customer’s requirements. We always adhere to the principle of running the business in good faith since establishment. Any vicious market competition, such as bidding up prices, offering inferior quality products will be seriously forbidden.
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...