Home  >  Quality PRODUCTS For sell  >  Best Movable Walls Factory  >  Hot Folding Partitions Company  > 

Bunge Brand track hotel folding wall banquet factory

Bunge Brand track hotel folding wall banquet factory

Bunge Brand track hotel folding wall banquet factory
  • Bunge Brand track hotel folding wall banquet factory
  • Bunge Brand track hotel folding wall banquet factory
  • Bunge Brand track hotel folding wall banquet factory
  • Bunge Brand track hotel folding wall banquet factory
  • Bunge Brand track hotel folding wall banquet factory
  • Bunge Brand track hotel folding wall banquet factory
  • Bunge Brand track hotel folding wall banquet factory
  • Bunge Brand track hotel folding wall banquet factory
  • Bunge Brand track hotel folding wall banquet factory
  • Bunge Brand track hotel folding wall banquet factory

Bunge Brand track hotel folding wall banquet factory

Model
85 mm Gym movable partition walls
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes.
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Movable walls
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly
Size: 9mm*1220mm*2440mm
Color: Can be customized
Style: Sliding
Product Comparison
Bunge Building Decoration Engineering carefully selects quality raw materials. Production cost and product quality will be strictly controlled. This enables us to produce movable walls which is more competitive than other products in the industry. It has advantages in internal performance, price, and quality.With a focus on product quality, Bunge Building Decoration Engineering firmly believes that details create quality products. We insist on controlling the quality from details. We strictly monitor all aspects of the production and screen out unqualified inferior products. All this guarantees movable walls are formaldehyde-free, pollution-free, safe, eco-friendly and durable.Compared with products in the same category, movable walls we produce is equipped with the following advantages.
  • Bunge-Professional Folding Room Partitions Folding Wall Panels Supplier
    Bunge-Professional Folding Room Partitions Folding Wall Panels Supplier-1
Company Advantages
1. The superior material applied in folding wall can ensure quality at the source. The product can far reach from one wall to another wall
2. folding room dividers has advantages both in cost, reliability and long life, in comparison with other similar products. Multiple accessories of the product can be provided to the customers
3. Every corner and edge of the product are carefully processed. folding partition,folding panel partition is designed according to the factual demand. Its prominent merit is that it has dividers folding partitions.
4. A magnetic strip is applied to the product to ensure strong functionality. the possible flaws in production and on-time delivery of product quality and quantity are ensured in Bunge.


Ballroom Soundproof Movable Walls Wooden Gym Partition Walls

Bunge-Professional Folding Room Partitions Folding Wall Panels Supplier

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.


Nice Price Products

FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.

 

65 mm movable walls ONLY FOR $85.

 

85 mm movable partition walls ONLY FOR $98.

 

100 mm movable partition walls ONLY FOR $118.

 

125 ultra-high system movable partition walls ONLY FOR $130.

 

Please contact us for the Detailed Price.

Bunge-Professional Folding Room Partitions Folding Wall Panels Supplier-1

Product Description


  •   Reinforced aluminium frame construction for demanding condition.

  •      Wide range of Gym movable partitions walls surface finishes and colors.

  •   Single or double passdoor enabling access to neighbouring rooms.

  •     The Gym movable partition walls stacking can be one or both ends.

  •     Top hung and floor with rubber seals achieving excellent soundproof effect.

  •    Various levels of soundproof reduction.

Bunge-Professional Folding Room Partitions Folding Wall Panels Supplier-2
Bunge-Professional Folding Room Partitions Folding Wall Panels Supplier-3
Technical Details
SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Panel thickness65mm85mm100mm
Max height4000mm6000mm18000mm
Panel width500-1200 mm500-1200 mm500-1200 mm
Face material9mm9mm12 mm
PassdoorsSingle door or Double door
Sound insulation28-38dB Rw28-42dB Rw32-50dB Rw
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized)

Bunge-Professional Folding Room Partitions Folding Wall Panels Supplier-4

Components of Movable Walls

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the gym movable partition walls cost panels with wheels.

Wheels/Rollers:  It is the carrier for the gym movable partition walls,let panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in aluminum profiles to enhance acoustic performance of restaurant sliding partition walls.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Professional Folding Room Partitions Folding Wall Panels Supplier-5
Bunge-Professional Folding Room Partitions Folding Wall Panels Supplier-6
Bunge-Professional Folding Room Partitions Folding Wall Panels Supplier-7

Parking Styles of Movable Walls

As you know, when we do not use the gym movable partition walls, we can park them to the parking area. Actually there are many parking styles for the gym movable partition walls, all of the clients can choose the suitable one and we can adjust based on their own project site. If you need some pocket doors to hide the panels, BUNGE Factory also can produce for you.


Bunge-Professional Folding Room Partitions Folding Wall Panels Supplier-8
Bunge-Professional Folding Room Partitions Folding Wall Panels Supplier-9
Bunge-Professional Folding Room Partitions Folding Wall Panels Supplier-10



Different Finishes of Movable Walls
  • ❶   Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  • ❷   Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  • ❸  Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  • ❹  Wallpaper, Vinyl, Fireproof board

  • ❺   Acoustic panels

  • ❻   Tempered glass, mirror etc.

Bunge-Professional Folding Room Partitions Folding Wall Panels Supplier-11
Bunge-Professional Folding Room Partitions Folding Wall Panels Supplier-12
Bunge-Professional Folding Room Partitions Folding Wall Panels Supplier-13
Action Now

1.Buy 30 square meters Get 5% Discount.


2.Buy 80 square meters Get 10% Discount.


3.Get a FREE SAMPLE.


4.Support a 3 YEARS WARRANTY.


5.To be general, BUNGE Factory has 10+ years experience in the line of gym movable partition walls. The sliding partitions we produced can divide the space speedy and conveniently. Due to their flexibility and cost effectiveness, now more and more clients need them to divide a large room. Also the movable partition walls are widely used in office buildings, meeting room, hotel, banquet hall, conference and function halls, church, classroom and so on. Would you like to get a free design? Welcome to contact us at any time.

Bunge-Professional Folding Room Partitions Folding Wall Panels Supplier-14



Company Features
1. Guangzhou Bunge Building Decoration Engineering Co., Ltd is an internationally renowned leading company dedicated to folding wall production.
2. The advanced mechanical processing equipment is available in Guangzhou Bunge Building Decoration Engineering Co., Ltd's manufacturing plant.
3. Guangzhou Bunge Building Decoration Engineering Co., Ltd persists in the folding panel partition service notion. Inquire!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...
/* 客户要求添加的 */