Home  >  Quality PRODUCTS For sell  >  Office Furniture Exporter  > 

Bunge Brand saving high quality office furniture modular supplier

Bunge Brand saving high quality office furniture modular supplier

Bunge Brand saving high quality office furniture modular supplier
  • Bunge Brand saving high quality office furniture modular supplier
  • Bunge Brand saving high quality office furniture modular supplier
  • Bunge Brand saving high quality office furniture modular supplier
  • Bunge Brand saving high quality office furniture modular supplier
  • Bunge Brand saving high quality office furniture modular supplier
  • Bunge Brand saving high quality office furniture modular supplier
  • Bunge Brand saving high quality office furniture modular supplier

Bunge Brand saving high quality office furniture modular supplier

Model
BUNGE Office Furniture
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
12-30 days based on the different places
Supply Ability
5000 sets
MOQ
No MOQ
Packing Details
Paper cartons, outside with wooden boxes
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Office Furniture
Feature: Factory directly sale
Aluminium frame thickness: 2 - 15 meters
Partition material: Accept customized
Finish: Melamine,MDF,Veneer
Application: Office,conference hall,meeting room
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly
Size: 9mm*1220mm*2440mm
Color: Can be customized
Style: Modern
Enterprise Strength
  • Guangdong Bunge Building Material Industrial Co.,Ltd has established a production and research and development team composed of senior backbones in the industry. We have also hired senior brand owners to lead product development and brand building.
  • Guangdong Bunge Building Material Industrial Co.,Ltd is committed to offering the best service to meet the needs of customers.
  • As a company with social responsibility, Guangdong Bunge Building Material Industrial Co.,Ltd has always adhered to the enterprise spirit of 'concentration, dedication, and professionalism'. We pay great attention to the reputation, customers, and integrity during business development. We constantly innovate and pursue excellence, with the commitment of becoming a modern enterprise with a good reputation in the domestic market.
  • In the past years of development, Guangdong Bunge Building Material Industrial Co.,Ltd has learned advanced production technology through different channels and has accumulated advanced development experience. Currently, we have rich experience in the production of movable walls and great production capability, which is close to the international level.
  • Guangdong Bunge Building Material Industrial Co.,Ltd's sales network covers the whole country. Most products are sold to some countries in Europe, America, and Southeast Asia.
Company Advantages
1. office partitions also has aesthetic advantages. It can be used to save the power consumption of the air conditioning
2. high quality office furniture makes pc workstation desk to be operated well. It adopts the convenient hanging system without the floor track
3. Due to its bright market prospects, this product has won many attentions so far. The product features a retractable performance

Modern Design BUNGE Office Furniture Factory,MDF Custom Office Workstations/Desks

Office Furniture Deatils


This work station is elegant and natural style. With natural wooden and sunshine yellow color can shine office place, make you more comfortable when working.  Also match ashtraies on each station for your convinience. 

 

* Material: E1 grade melamine faced chipboard ,Table top 25mm ,2mm pvc edge banding.


* foot stool: painted cone white foot stool with wire groove.

 
* Screen: 9mm wooden board .


* Price includes three smoke ark on the table, for one single station price.


Bunge-Office Table And Chairs Manufacture | Modern Office Workstations

Technical Information
Product Name
Modern Design BUNGE Office Furniture market,MDF Custom Office Furniture
Material
Steel frame+MDF top
Color
White,black,light yellow
Payment
TT and trade assurance
Loading port
Guangzhou
Delivery time
20-30 days after receiving deposit
Export experience
Since 2004
Remark
Details as my PI and quotation

Bunge-Office Table And Chairs Manufacture | Modern Office Workstations-1

Bunge-Office Table And Chairs Manufacture | Modern Office Workstations-2

Bunge-Office Table And Chairs Manufacture | Modern Office Workstations-3

Office Furniture Advantages

1--Office table design,fresh MFC boards are strong and innocuous,safe for long time using; 


2--Firmer frame,enable it can support maximum strength in public;


3--Detachable structure, so more quantity in container is allow,save your shipping cost;


4--Easy for installationin, All accessories and screws will be along with goods;


5--Plastic footpad under frame to keep the ground out of scratching;


6--BUNGE colour options available are Green,Light Gray,or as your request.

Bunge-Office Table And Chairs Manufacture | Modern Office Workstations-4


Office Furniture Finishing

There are 3 kinds of finishes to choose:

Bunge-Office Table And Chairs Manufacture | Modern Office Workstations-5



Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd has reached the level of professionalism in manufacturing office partitions.
2. Bunge employs advanced techniques to produce high quality pc workstation desk.
3. The essence in service idea of Guangdong Bunge Building Material Industrial Co.,Ltd is high quality office furniture. Welcome to visit our factory!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...