Home  >  Quality PRODUCTS For sell  >  Glass Partitions Manufacturer  >  Quality Solid Glass Partitions  > 

Bunge Brand room interior mm custom partition wall with glass

Bunge Brand room interior mm custom partition wall with glass

Bunge Brand room interior mm custom partition wall with glass
  • Bunge Brand room interior mm custom partition wall with glass
  • Bunge Brand room interior mm custom partition wall with glass
  • Bunge Brand room interior mm custom partition wall with glass
  • Bunge Brand room interior mm custom partition wall with glass

Bunge Brand room interior mm custom partition wall with glass

Model
83 mm solid glass partitions
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
5000 square meters
MOQ
No MOQ
Packing Details
Paper cartons, outside with wooden boxes
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Solid glass partitions
Feature: Sound proofing
Aluminium frame thickness: 2-4 meters
Partition material: 800 - 1200 mm
Finish: Clear glass
Application: Conference room,office,meeting room
General use: Office furniture
Material: Aluminum+clear glass
Function: Fireproof and eco-friendly
Size: Accept customized
Color: Can be powder coated
Style: Fixed & Solid
Product Comparison
Under the guidance of market, Guangdong Bunge Building Material Industrial Co.,Ltd constantly strives for innovation. movable walls has reliable quality, stable performance, good design, and great practicality.Guangdong Bunge Building Material Industrial Co.,Ltd introduces advanced decorative production technology and uses fine workmanship in the production of various movable walls. We have various choices for styles, such as classic style, fashion style, novel style, and regular style. Moreover, art and creative design are adopted into each product.Guangdong Bunge Building Material Industrial Co.,Ltd guarantees folding partition to be high-quality by carrying out highly standardized production. Compared with other products in the same category, it has the following advantages.
  • Bunge-Office Glass Partition Design Manufacture | Interior Temper Fixed Office
    Bunge-Office Glass Partition Design Manufacture | Interior Temper Fixed Office-1
Company Advantages
1. Bunge office glass partition design tempts customers with its aesthetic design. It will be safely packaged in a carton box and a wooden box
2. The product is unmatched when it comes to long-lasting stable performance and durability. The product ensures a safe user experience
3. The product conforms to the strict quality standard. It displays a gorgeous and delicate appearance
4. With a strong sense of responsibility, the Bunge's staff always provides the best service. Every corner and edge of the product are carefully processed
5. Since Bunge placed a lot of emphasis on service, it has been much improved. A magnetic strip is applied to the product to ensure strong functionality

Interior Temper Fixed Office Partition Walls Full Height Solid Glass Partitions

Solid Glass Partitions Deatils


 

The solid glass partition products can be dismantled , repeated use, the materials of the solid glass partition system is a green building materials and environment-friendly materials .

The door, windows, modules entity, the location of the glass partition can be changed to suite your need, you can regroup and then use the materials after disassembly, component damage is not likely to occured even after regrouping or disassembly, so the glass partition system can greatly reduce costs for any office relocation.The installation of the glass partition is faster than ordinary wall.


Solid glass partition can be fire-resistant , compartment system is made by metal structure, glass, color steel plates etc , which also could be fire-resistant. While the compartment system is of steel structure system, the fire-resistance could be or 30 min, 60 min or a longer time.


Solid glass partition system have a very excellent sound insulation performance. 

Bunge-Manufacturer Of Glass Partition Wall Design Glass Office Walls Cost

Technical Information
Product Name Interior Temper Fixed Office Partition Walls Full Height Solid Glass Partitions
Keywords Office solid glass partitions
Application Office partition walls,office furniture
Thickness 80 , 82 , 83 , 84 , 86 , 90 , 100 , 103 , 108mm
Profile Aluminum
Advantage Custom made products
Glass 8mm or 12mm single tempered glass / Double tempered glass
Design Accept OEM
Warranty 5 Years

Bunge-Manufacturer Of Glass Partition Wall Design Glass Office Walls Cost-1

Solid Glass Partitions Advantages

1.Double or single layers solid glass partitions, easy disassembly, low construction sound, reusable when refurbishing the environment benefits.


2.Super Wire Installation Function to meet the systematical needs of any working places.


3.Solid glass partition can be customized to 3 layers according to different sound-insulation needs. 


4.Adapt to kinds of thickness of glass partitions to provide the best cost performance.


5. Fine structural design, allow glasses to be assembled and disassembled separately ,easy installation.   


6. Profile material use 6063-T5 Aluminum Alloy of which the performance is superior than industrial Aluminum Alloy, it has good hardness and corrosion tolerance, Aluminum alloy frame, durable and stable construction.


7. Special sealing aluminum design offers adjustable function of the solid glass partition.


8. The aluminum bar design between the connection of the double glass produces effect sound insulation


Bunge-Manufacturer Of Glass Partition Wall Design Glass Office Walls Cost-2


FAQ

Q1:

What is your main product?

A:

We supply all kind of movable walls,office furniture and glass partitions (including profile, hardware, accessories, glass) as well as the finished products ready for installation.


Q2:

How can I know your price?

A:

The price is based on buyer's specific requirement, so please provide below information to help us to quote accurate price for you. 1) Shop drawing / window schedule to show the window dimensions, quantity and type; 2) Frame color; 3) Type of glass and thickness (single or double or laminated or others) and color (clear, tinted, reflective, Low-E or others, with Argon or without).


Q3:

What is the standard size of your windows and doors?

A:

Our product is CUSTOMER MADE. We always manufacture according to buyer's dimensions.


Q4:

What is your delivery time?

A:

15 working days for the series we stocked, 40 working days for special color. 


Q5:

What is your standard color for aluminum frames?

A:

Powder coating white, grey.


Q6:

What is your payment terms?

A:

Normally, 50% of total amount by T/T as deposit and balance before delivery. Irrevocable L/C at sight is also acceptable.


Q7:

Will we need to install the glass (on site glazed) or do your windows come with the glass installed?

A:

We will install glass at factory based on windows/doors dimension to make sure they can be safe during transportation and if easy for our buyer to install the whole windows/doors. On site glazed are recommended for big sized products.


Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...