Home  >  Quality PRODUCTS For sell  >  Best Movable Walls Factory  >  Hot Folding Partitions Company  > 

Bunge Brand proof folding wall sliding factory

Bunge Brand proof folding wall sliding factory

Bunge Brand proof folding wall sliding factory
  • Bunge Brand proof folding wall sliding factory
  • Bunge Brand proof folding wall sliding factory
  • Bunge Brand proof folding wall sliding factory
  • Bunge Brand proof folding wall sliding factory
  • Bunge Brand proof folding wall sliding factory
  • Bunge Brand proof folding wall sliding factory
  • Bunge Brand proof folding wall sliding factory
  • Bunge Brand proof folding wall sliding factory
  • Bunge Brand proof folding wall sliding factory
  • Bunge Brand proof folding wall sliding factory

Bunge Brand proof folding wall sliding factory

Model
85 mm exhibition partition walls
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes.
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Exhibition partition walls
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Exhibition hall,banquet hall,conference hall,etc.
Color: Can be customized
Style: Sliding
Product Details
The specific details of glass partitions are presented below.In the production, Bunge Building Decoration Engineering pays attention to environmental protection. We implement fine processing on products based on the safe, eco-friendly, durable and solid materials. movable walls enjoy a good reputation in the market for the features including solidity, durability, safety and no pollution. Bunge Building Decoration Engineering's glass partitions is commonly praised in the market due to good materials, fine workmanship, reliable quality, and favorable price.
  • Bunge-Professional Folding Partition Walls Commercial Wall Panel Room Divider Supplier
Company Advantages
1. The offered Bunge folding panel partition is produced using modern technology in conformance with the set industry standards. The surface of the product can be arbitrarily decorated by customers
2. It is highly recognized for its excellent thermal insulation property. Considering dividers folding partitions, the key factors of folding wall,foldable wall divider is folding partition wall systems.
3. The product promises that there will be no scratch issues. the products of our company are available in various sizes, shapes, colors and many more specifications.
4. The product greatly highlights its easy installation. we can customize solutions to making folding room dividers,folding walls residential for your own folding wall panels use..


Lightweight Acoustic Folding Wall Partitions,Operable Exhibition Partition Walls

Bunge-Professional Folding Partition Walls Commercial Wall Panel Room Divider Supplier

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.


Nice Price Products

FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.

 

65 mm exhibition partition walls ONLY FOR $85.

 

85 mm exhibition partition walls ONLY FOR $98.

 

100 mm exhibition partition walls ONLY FOR $118.

 

125 ultra-high system exhibition partition walls ONLY FOR $130.

 

Please contact us for the Detailed Price.

Bunge-Professional Folding Partition Walls Commercial Wall Panel Room Divider Supplier-1

Product Description


  •   Reinforced aluminium frame construction for demanding condition.

  •      Wide range of exhibition folding partitions walls surface finishes and colors.

  •   Single or double passdoor enabling access to neighbouring rooms.

  •     The exhibition folding partition walls stacking can be one or both ends.

  •     Top hung and floor with rubber seals achieving excellent soundproof effect.

  •    Various levels of soundproof reduction.

Bunge-Professional Folding Partition Walls Commercial Wall Panel Room Divider Supplier-2
Bunge-Professional Folding Partition Walls Commercial Wall Panel Room Divider Supplier-3
Technical Details
SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Panel thickness65mm85mm100mm
Max height4000mm6000mm18000mm
Panel width500-1200 mm500-1200 mm500-1200 mm
Face material9mm9mm12 mm
PassdoorsSingle door or Double door
Sound insulation28-38dB Rw28-42dB Rw32-50dB Rw
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized)

Bunge-Professional Folding Partition Walls Commercial Wall Panel Room Divider Supplier-4

Components of Exhibition Partition Walls

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the exhibition folding partition walls cost panels with wheels.

Wheels/Rollers:  It is the carrier for the exhibition folding partition walls,let panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in aluminum profiles to enhance acoustic performance of exhibition folding partition walls.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Professional Folding Partition Walls Commercial Wall Panel Room Divider Supplier-5
Bunge-Professional Folding Partition Walls Commercial Wall Panel Room Divider Supplier-6
Bunge-Professional Folding Partition Walls Commercial Wall Panel Room Divider Supplier-7

Parking Styles of Exhibition Partition Walls

As you know, when we do not use the exhibition folding partition walls, we can park them to the parking area. Actually there are many parking styles for the exhibition folding partition walls, all of the clients can choose the suitable one and we can adjust based on their own project site. If you need some pocket doors to hide the panels, BUNGE Factory also can produce for you.


Bunge-Professional Folding Partition Walls Commercial Wall Panel Room Divider Supplier-8
Bunge-Professional Folding Partition Walls Commercial Wall Panel Room Divider Supplier-9
Bunge-Professional Folding Partition Walls Commercial Wall Panel Room Divider Supplier-10



Different Finishes of Exhibition Partition Walls
  • ❶   Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  • ❷   Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  • ❸  Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  • ❹  Wallpaper, Vinyl, Fireproof board

  • ❺   Acoustic panels

  • ❻   Tempered glass, mirror etc.

Bunge-Professional Folding Partition Walls Commercial Wall Panel Room Divider Supplier-11
Bunge-Professional Folding Partition Walls Commercial Wall Panel Room Divider Supplier-12
Bunge-Professional Folding Partition Walls Commercial Wall Panel Room Divider Supplier-13
Action Now

1.Buy 30 square meters Get 5% Discount.


2.Buy 80 square meters Get 10% Discount.


3.Get a FREE SAMPLE.


4.Support a 3 YEARS WARRANTY.


5.To be general, BUNGE Factory has 10+ years experience in the line of exhibition folding partition walls. The folding partitions we produced can divide the space speedy and conveniently. Due to their flexibility and cost effectiveness, now more and more clients need them to divide a large room. Also the folding partition walls are widely used in office buildings, meeting room, hotel, banquet hall, conference and function halls, church, classroom and so on. Would you like to get a free design? Welcome to contact us at any time.

Bunge-Professional Folding Partition Walls Commercial Wall Panel Room Divider Supplier-14



Company Features
1. As a professional manufacturer of folding wall, Guangzhou Bunge Building Decoration Engineering Co., Ltd has gained great popularity.
2. Having been qualified with certificated quality assurance, our finest folding room dividers has got more and more recognition from customers.
3. One major tenet is tofolding panel partition. Call!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...