Home  >  Quality PRODUCTS For sell  >  Certificated Acoustic Panels Factory  >  Perforated Wooden Acoustic Panels Factory  > 

Bunge Brand panel mdf sound deadening panels mm factory

Bunge Brand panel mdf sound deadening panels mm factory

Bunge Brand panel mdf sound deadening panels mm factory
  • Bunge Brand panel mdf sound deadening panels mm factory
  • Bunge Brand panel mdf sound deadening panels mm factory
  • Bunge Brand panel mdf sound deadening panels mm factory
  • Bunge Brand panel mdf sound deadening panels mm factory
  • Bunge Brand panel mdf sound deadening panels mm factory
  • Bunge Brand panel mdf sound deadening panels mm factory

Bunge Brand panel mdf sound deadening panels mm factory

Model
BG perforated acoustic panels
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
50000 square meters
MOQ
No MOQ
Packing Details
Paper carton
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Perforated acoustic panels
Feature: Sound proofing
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
General use: Sound proofing materials
Material: MDF+Melamine
Function: Fireproof and eco-friendly
Size: 2440*1220 mm, 1220*600 mm
Color: Can be customized
Style: Modern
Enterprise Strength
  • Guangdong Bunge Building Material Industrial Co.,Ltd has a group of experienced technicians to provide a strong technical force for product development and business management.
  • While selling products, Guangdong Bunge Building Material Industrial Co.,Ltd also provides corresponding after-sales services for consumers to solve their worries.
  • Guangdong Bunge Building Material Industrial Co.,Ltd always strives for modern brand building and constant innovation and development. We promote sustainable development of production in the Manufacturing Decoration Materials industry by establishing long-term management mechanism.
  • Guangdong Bunge Building Material Industrial Co.,Ltd has been exploring in the Manufacturing Decoration Materials industry for years. And we have accumulated a wealth of experience in the production of movable walls. We have gained a deeper understanding of the industry. With great production technology, we become a supplier for many companies and enjoy a certain reputation.
  • Guangdong Bunge Building Material Industrial Co.,Ltd's products are only widely praised in the domestic market, but also favored by consumers in the international market.
Company Advantages
1. The long-term benefits of this specialized sound deadening panels are amply demonstrated by sound suppression panels. The product can far reach from one wall to another wall
2. Any defect of the product has been avoided or eliminated during our strict quality assurance procedure. The product offers a thorough partition from the ceiling to the floor
3. To ensure its quality, Bunge sound reducing wall panels is examined on various parameters at every level of production. It adopts the convenient hanging system without the floor track
4. Guangdong Bunge Building Material Industrial Co.,Ltd seeks continuous improvement to attain a high standard of service. The product is found to have good sound insulation

Sound Insulation Fireproof Auditorium Perforated Wood Acoustic Panels

Perforated Acoustic Panels Features

1 Mdf soundproof acoustic board is a kind of resonance absorption material with holes through on the quality MDF board.


2 It has strong selection on the sound spectrum and particular great performance on the middle and low frequency.


3 If filled with the acoustic cotton at the back side space of the acoustic panel, it has better performance on the middle and high frequency.


4 The holes diameter and pitch can be custom made.


5 Strong impact resistance, excellent decorate performance, elegant color, especially work for wooden construction.

Bunge-Professional Acoustic Soundproofing Panels Sound Suppression Panels

Technical Information
Model typeE16/6,E32/6,V32/6,E35/1.5-10,V32/3-10
Size600*600,1200*600,2400*1200mm
Thickness12,15,18mm
Finishmelamine, veneer, metal finish, acrylic, PU leather,
paintUV,PU painting
Base materialStandard MDF, Eco-pine wood MDF, Fireproof MDF, Moistureproof MDF, Magnesium Composited MDF
MDF density680kg/cubic meter
Backside finishAcoustic felt, woven fabric
Fireproof gradeGB8624 2012 A,B1,B2,B3
Eco-protection gradeE0,E1
InstallationAluminum keel and clips, wood frame, gun nail
Backside hole diameter10 mm
Depth of groove7mm
Veneer type thickness0.3,0.6mm
Veneer textureMountain texture, straight line
Veneer tree speciesMaple, cherry, Oak, teak, walnut, ashtree, sabelli, birch,
CertificationBV,CE,SGS,ISO9001-2008,
Test reportEco protection, sound absorption, flame retardant

Bunge-Professional Acoustic Soundproofing Panels Sound Suppression Panels -1

Perforated Acoustic Panels Applications

1.Studios, recording rooms, listening rooms, rehearsal rooms and more professionally interspace timbre projects.


2.Theaters, indoor gymnasiums, discos, KTV rooms and more performance and entertainment location.


3.Meeting rooms, offices, halls, hotels and more sound absorption and secrecy projects.


4.Air-port, railways, bus-stops, workshops and more noise reduction projects.


Bunge-Professional Acoustic Soundproofing Panels Sound Suppression Panels -2

Perforated Acoustsic Panels Performance

Acoustic absorption is usually defined in terms of an absorption coefficient(usually denoted by theGreek letter alpha, α), defined as the ratio of absorbed to incident sound energy from a single interaction between a sound wave and a certain material. Absorption coefficients range from 0 to 1 and vary with frequency, α=0 means that the material absorbs no sound and reflects all sound energy incident on it.


α=1 means that the material absorbs all sound energy incident on it and reflects none. Absorption coefficients of 0 and 1 are ideal values that do not exist in reality because all materials reflect and absorb some sound. In general, materials having absorption coefficients less than 0.15 are considered to be reflective and those having absorption coefficients greater than 0.4 are considered to be absorptive.
 
As you can see our Testing report show that our products have a very good performance in a
large range of application.

Bunge-Professional Acoustic Soundproofing Panels Sound Suppression Panels -3


Installation Methods

1> First fix the aluminum profile onto the wooden frame or bottom board, and their distance suggested about 600mm.

 

2> Filled the 32-64kg/m density acoustic foam among aluminum profiles.

 

3> Use the clips to fix the perforated acoustic panel to the aluminum profile.

 

4> When install several perforated acoustic panel, the distance between noses to noses suggested 2-3mm.

 

5> If install the perforated acoustic panels in the horizontal way, then the notch of the panel should face down, and it need to be fixed tight with clips. After that install pieces and pieces of acoustic panel onto the lowest one.



Bunge-Professional Acoustic Soundproofing Panels Sound Suppression Panels -4


                                   Melamine ,natural wood veneer,paint,etc                                    


Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd focuses on manufacturing and exporting sound deadening panels.
2. In Guangdong Bunge Building Material Industrial Co.,Ltd, only finest-quality noise reduction panels is supplied.
3. Guangdong Bunge Building Material Industrial Co.,Ltd persists in the sound suppression panels service theory. Get an offer!

                                   Melamine ,natural wood veneer,paint,etc                                    

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...