Home  >  Quality PRODUCTS For sell  >  Best Movable Walls Factory  >  Hot Folding Partitions Company  >  Bunge Brand gym track exhibition proof folding wall
Bunge Brand gym track exhibition proof folding wall

Bunge Brand gym track exhibition proof folding wall
  • Bunge Brand gym track exhibition proof folding wall
  • Bunge Brand gym track exhibition proof folding wall
  • Bunge Brand gym track exhibition proof folding wall
  • Bunge Brand gym track exhibition proof folding wall
  • Bunge Brand gym track exhibition proof folding wall
  • Bunge Brand gym track exhibition proof folding wall
  • Bunge Brand gym track exhibition proof folding wall
  • Bunge Brand gym track exhibition proof folding wall
  • Bunge Brand gym track exhibition proof folding wall
  • Bunge Brand gym track exhibition proof folding wall

Bunge Brand gym track exhibition proof folding wall

Model
85 mm folding partition walls
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes.
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Captcha

Loading verification code...

Please complete verification first

Product name: Folding partition walls
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Conference room,hotel,banquet hall and etc
Color: Multi color
Style: Sliding
Product Comparison
folding partition, manufactured based on high-quality materials and advanced technology, has reasonable structure, excellent performance, stable quality, and long-lasting durability. It is a reliable product which is widely recognized in the market.In the design and production, Bunge Building Decoration Engineering pays attention to the overall design and the details of the line design. movable walls has advantages such as good design, multiple functions, and outstanding performance. Bunge Building Decoration Engineering guarantees folding partition to be high-quality by carrying out highly standardized production. Compared with other products in the same category, it has the following advantages.
  • Bunge-Moveable Walls, Retractable Acoustic Folding Partition Walls For Conference Room
    Bunge-Moveable Walls, Retractable Acoustic Folding Partition Walls For Conference Room-1
Company Advantages
1. folding wall boasts its original and unique design. It will not be easy to swing after being reliably installed
2. This product is defectless and stringently tested on different quality parameters by our team of experts. Tracks of the product are made of high-quality anodized aluminum 6063-T5
3. The surface of the product can be arbitrarily decorated by customers. abundant talent reserves and superior design capabilities for folding room dividers,folding panel partition are the primary force of Bunge's rapid development.
4. Every corner and edge of the product are carefully processed. Bunge has full confidence in the quality of folding partition,dividers folding partitions.


Retractable Acoustic Folding Partition Walls for Conference Room

Bunge-Moveable Walls, Retractable Acoustic Folding Partition Walls For Conference Room

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.

Bunge-Moveable Walls, Retractable Acoustic Folding Partition Walls For Conference Room-1

Description


Folding wall partition is a kind of movable wall that can divide a large space into a small space. It can serve as a multi-purpose room with multiple functions.


Top hanging system without floor track. Also is seal and has good sound insulation.

 

Our factory can provide four series product let you have a choosing. Panel height is from finished floor to ceiling or beam. Panel width is from wall to wall.


Restaurant partition wall usually use in banquet hall,conference room,classroom,office and etc.


Our main structure that is aluminium frame with mdf board, inside soundproof rock wool and aluminium keen.


Bunge-Moveable Walls, Retractable Acoustic Folding Partition Walls For Conference Room-2Bunge-Moveable Walls, Retractable Acoustic Folding Partition Walls For Conference Room-3Bunge-Moveable Walls, Retractable Acoustic Folding Partition Walls For Conference Room-4
Technical information


SeriesBG 65BG 85 BG 100
Panel SuspensionTop hung onlyTop hung onlyTop hung only
Track systemSingle or twin pointSingle or twin pointSingle or twin point
Panel thickness 65 mm85 mm100 mm
Max height4 m6 m15 m
Panel width600-1200 mm600-1200 mm600-1200 mm
Face material9 mm MDF Board9 mm MDF Board9 mm MDF Board
Retractable sealsAluminium black with double rubber sealsAluminium black with double rubber sealsAluminium black with double rubber seals
Operation of sealsManual,with crank handleManual,with crank handleManual,with crank handle
Sound insulation20-35dB30-45dB35-53dB
Surface


Folding wall partition has three kinds surface.


First is mdf melamine,it can be more easy to clean.


Second is leather or fabric with hard cover inside aluminium frame.


Third is leather or fabric with hard cover hidden aluminium frame.


Fourth is mdf bare finish,client can paint prefer color on mdf board in local city.


Also has plywood finish,customers can paste wallpaper on it.


If client prefer to veneer surfrace,we should know whether needs paint color,and whether needs other extra surfrace.


If client prefer to use mirror  surface,mirror thickness is 5 mm,basic board is 5 mm.

Bunge-Moveable Walls, Retractable Acoustic Folding Partition Walls For Conference Room-5Bunge-Moveable Walls, Retractable Acoustic Folding Partition Walls For Conference Room-6

Bunge-Moveable Walls, Retractable Acoustic Folding Partition Walls For Conference Room-7

Aluminum Components of Retractable Partitions System


Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the retractable partitions panels with wheels.


Wheels/Rollers:  It is the carrier for the retractable partitions,let the panels move more flexibly.Pulley bearing is more than 1600 KGS.


Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.


Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.


Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.


Handle: Operate the retractable being up and down.


Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.


Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the retractable partitions.


MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Moveable Walls, Retractable Acoustic Folding Partition Walls For Conference Room-8Bunge-Moveable Walls, Retractable Acoustic Folding Partition Walls For Conference Room-9

Folding partition wall advantage

No rail suspension:the floor has no track, just install the track on the ceiling.


Stable and safe:Stable and reliable after partitioning, not easy to swing.


Retractable acoustic seals at top and bottom, operated either by quick release handle or semi-automatically with electronic controls.


Sound insulation and environmental protection:sound insulation effect is good,the sound insulation coefficient can reach 53 dB.


Insulation and energy saving: Excellent thermal insulation performance,according to different occupancy rates,

the sound proof partitions can divide a large space into small spaces to reduce air conditioning power consumption.


Efficient fire prevention: Sound proof partitions are made of high-efficiency fireproof material and has good fireproof performance.


Retractable and flexible:the sound proof partitions are freely retractable and flexible, and one person can complete the whole process of partitioning.


Bunge-Moveable Walls, Retractable Acoustic Folding Partition Walls For Conference Room-10

Bunge-Moveable Walls, Retractable Acoustic Folding Partition Walls For Conference Room-11Bunge-Moveable Walls, Retractable Acoustic Folding Partition Walls For Conference Room-12

Our service


1.Profession--We have professional sales staff. Any questions will be replied within 24 hours.


2.Price--Because we are factory,so we can provide nice quality and lower price products.


   Series 65,more than 80 square meters, free sample.


   Series 85,quantity up to 120 square meters, extra 20 rollers.


   Sereis 100, more than 200 square meters, discount 300 USD.


3.Service--Easy and convenient to transport,we promise timely delivery date, and good after-sale service.

  

4.Team--We have our own engineering department, according to your request for your tailor-made for your product.


5.Installing--Our engineer can come to teach installing,and we will also supply installing drawings and video.


Bunge-Moveable Walls, Retractable Acoustic Folding Partition Walls For Conference Room-13

Packing & shipping


Folding partition wall when we finished production, we will use carton packing and mdf board to pack movable panels. 


And we will also make one or more packing boxes for clients.It can reduce damagement during transportation.


We usually transport movable panels by sea, such as CIF price.


Some aluminium profile,sliding track,glass clips and other accessories we can transport by courier, like DHL or Fedx.


Bunge-Moveable Walls, Retractable Acoustic Folding Partition Walls For Conference Room-14Bunge-Moveable Walls, Retractable Acoustic Folding Partition Walls For Conference Room-15

Bunge-Moveable Walls, Retractable Acoustic Folding Partition Walls For Conference Room-16



Company Features
1. With the high quality and sincere service, Guangzhou Bunge Building Decoration Engineering Co., Ltd has been meeting the folding wall of the market to create the global brand.
2. By establishing a high-tech laboratory, Bunge has sufficient scientific and technological strength to create folding room dividers.
3. Guangzhou Bunge Building Decoration Engineering Co., Ltd wants to serve our customers better and better and meet most of their requirements. Check it!
Product Message

Loading verification code...

Please complete verification first

社媒暂无评论
Contact
/* 客户要求添加的 */