Home  >  Quality PRODUCTS For sell  >  Glass Partitions Manufacturer  >  Quality Solid Glass Partitions  > 

Bunge Brand design partition custom partition wall with glass

Bunge Brand design partition custom partition wall with glass

Bunge Brand design partition custom partition wall with glass
  • Bunge Brand design partition custom partition wall with glass
  • Bunge Brand design partition custom partition wall with glass
  • Bunge Brand design partition custom partition wall with glass
  • Bunge Brand design partition custom partition wall with glass
  • Bunge Brand design partition custom partition wall with glass
  • Bunge Brand design partition custom partition wall with glass

Bunge Brand design partition custom partition wall with glass

Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12days
Supply Ability
500 square meters per month
MOQ
No MOQ
Packing Details
Carton packing and box packing
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Fixed glass partition wall
Partition material: Aluminium frame and tempered glass
Application: Conference room,office and etc
General use: Office furniture
Material: 100% Polyester Fiber
Function: Divide space
Size: Panel thickness 83 m
Color: Can be customized
Style: Fix glass partition wall
Product Details
To better learn about folding partition, Guangdong Bunge Building Material Industrial Co.,Ltd will provide detailed pictures and detailed information in the following section for your reference.In the design and production, Guangdong Bunge Building Material Industrial Co.,Ltd pays attention to the overall design and the details of the line design. movable walls has advantages such as good design, multiple functions, and outstanding performance.Guangdong Bunge Building Material Industrial Co.,Ltd is certified by various qualifications. We have advanced production technology and great production capability. folding partition has many advantages such as reasonable structure, excellent performance, good quality, and affordable price.
  • Bunge-High-quality Frameless Glass Wall | Modern Design Modular Fixed Office
Application Scope
Guangdong Bunge Building Material Industrial Co.,Ltd's glass partitions can meet the different needs of customers.Guangdong Bunge Building Material Industrial Co.,Ltd insists on providing customers with comprehensive solutions based on their actual needs, so as to help them achieve long-term success.Guangdong Bunge Building Material Industrial Co.,Ltd opens up new horizons based on the market. We gain inspiration from art and create value with profession. Moreover, we try to integrate aesthetic art into the design of movable walls and focus on the design and planning of product details. We guarantee that each product is classic and stylish, simple and generous by putting our wisdom and vitality into the production.
  • Bunge-High-quality Frameless Glass Wall | Modern Design Modular Fixed Office
Company Advantages
1. office glass partition design is proud of its special features of partition wall with glass. The product ensures a safe user experience
2. With company philosophy of 'Quality comes first.', the product is guaranteed to meet the highest quality standards. The product becomes popular for its movability
3. It has outstanding performance and irreplaceable charm. It can divide a large space into small spaces for effective space utilization
4. The product can easily meet the needs of various occasions. The product finds its wide use in the banquet hall, conference room, office, etc
5. glass walls for office interiors can be easily maintained. It is widely used for privacy protection

Modern Design Modular Fixed Office Glass Partition Wall


Attention

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.

Bunge-Professional Glass Partition Glass Partition Systems Manufacture

Description


The glass partition products can be dismantled , repeated use, the materials of the partition system is a green building materials and environment-friendly materials.


The door, windows, modules entity, the location of the glass partition can be changed to suite your need, you can regroup and then use the materials after disassembly, component damage is not likely to occured 

even after regrouping or disassembly, so the glass partition system can greatly reduce costs for any office relocation.The installation of the glass partition is faster than ordinary wall.


Glass partition can be fire-resistant , compartment system is made by metal structure, glass, color steel plates etc , which also could be fire-resistant. While the compartment system is of steel structure system, the fire-resistance could be or 30 min, 60 min or a longer time.


Bunge-Professional Glass Partition Glass Partition Systems Manufacture-1


Technical information

Product Name

Office glass fixed partition

Blind

remote control blind and manual blind are available

Shape

L shape,linear shape,straight shape

Size(mm)

customized 

Color

More than 60 colors available

Glass

Double glass,single glass,frosted glass(10/12mm)

Partition Material

Aluminum frame+ panel/ glass /fabric / steel board

Desktop Seal edge

PVC/ABS

Accessories

Famous brand accessoriess

Products Character

Anti-Water, Anti-Scratch, Anti-Dirty

Packing

Standard export packing

Others

OEM,customized available


Bunge-Professional Glass Partition Glass Partition Systems Manufacture-2


Feature


1. Glass partition wall could be turned over 180 degree in order to adjust the line of sight and save energy.


2. The special structure design dose not only help to install easily and efficiently, but conduce to disassemble conveniently and replace the profile (type material), panels, etc.


3. The repeated utilization ratio of aluminum alloy profile could get to 90% above.


4. The partition system adopts high quality rubber seal without any glue. There is no dust and hazardous substance to pollute the environment and clean easily.


5. The partition system could be connected with buffer transition to meet various needs of engineering decoration and office facility.


Bunge-Professional Glass Partition Glass Partition Systems Manufacture-3


Our service


1.Profession--We have professional sales staff. Any questions will be replied within 24 hours.


2.Price--Because we are factory,so we can provide nice quality and lower price products.


   Series 63,more than 200 square meters, free sample.


   Series 80,quantity up to 500 square meters, discount 300 USD.


3.Service--Easy and convenient to transport,we promise timely delivery date, and good after-sale service.

  

4.Team--We have our own engineering department, according to your request for your tailor-made for your product.


5.Installing--Our engineer can come to teach installing,and we will also supply installing drawings and video.


Bunge-Professional Glass Partition Glass Partition Systems Manufacture-4

FAQ


Q1: Do you provide the design solution and drawings?


Yes, sure. We can design the systems you need to match different wall systems.


Q2: What is the standard size of your windows and doors? 

Our product is CUSTOMER MADE. We always manufacture windows and doors according to buyer's dimensions.


Q3: What is your warranty ? What do we do in case of problems? 


5 years quality warranty is provided,including frame unfading nor peel-off, hardware and accessories working properly under correct operation.In case of our quality problem, we will provide replacement by international courier.


Q4: What kinds of hardware can you supply ? 


Commonly Germany brand,China top brand and Australia brand,and other brands are available.


Q5: What is your MOQ order? 


10 piece is accepted. And the price is relative to the quantity you order.


Q6: What is your payment terms? 


30% - 50% of total amount by T/T as deposit when confirmed the order and balance paid by T/T  before loading container.


Q7: What's the delivery time? 


15 days for the standard color and 35 days for the customized. It depends on the details.



Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd is a leading solution supplier focusing on field of office glass partition design.
2. Based on the use of leading technology, glass walls for office interiors has achieved great success with its highest quality and competitive price.
3. Producing glass walls and doors from customer's point of view will make Bunge stronger. Welcome to visit our factory!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...