Home  >  Quality PRODUCTS For sell  >  Best Movable Walls Factory  >  Sliding Partitions Wholesale  > 

Bunge Brand decorative easy office custom sliding partition walls

Bunge Brand decorative easy office custom sliding partition walls

Bunge Brand decorative easy office custom sliding partition walls
  • Bunge Brand decorative easy office custom sliding partition walls
  • Bunge Brand decorative easy office custom sliding partition walls
  • Bunge Brand decorative easy office custom sliding partition walls
  • Bunge Brand decorative easy office custom sliding partition walls
  • Bunge Brand decorative easy office custom sliding partition walls
  • Bunge Brand decorative easy office custom sliding partition walls
  • Bunge Brand decorative easy office custom sliding partition walls
  • Bunge Brand decorative easy office custom sliding partition walls
  • Bunge Brand decorative easy office custom sliding partition walls
  • Bunge Brand decorative easy office custom sliding partition walls

Bunge Brand decorative easy office custom sliding partition walls

Model
Series 100
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12days
Supply Ability
500 square meters per month
MOQ
No MOQ
Packing Details
Carton packing and box packing
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Acoustic partition wall
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Leather, fabric
Application: Function hall,hotel
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly Divide space
Size: 2440*133 mm, 2440*197 mm Thickness 83 mm
Color: Multi color
Style: Sliding
Product Details
glass partitions's details are presented below. They help better know the product.In the production, Guangdong Bunge Building Material Industrial Co.,Ltd pays attention to environmental protection. We implement fine processing on products based on the safe, eco-friendly, durable and solid materials. movable walls enjoy a good reputation in the market for the features including solidity, durability, safety and no pollution. glass partitions, manufactured based on high-quality materials and advanced technology, has excellent quality and favorable price. It is a trustworthy product which receives recognition and support in the market.
  • Bunge-Manufacturer Of Sliding Wall Aluminium Frame Sound Proof Hotel Removable
Company Advantages
1. With sliding partition walls concept, sliding room dividers is designed, which is of sliding walls residential. It will be safely packaged in a carton box and a wooden box
2. room divider wall have strong resistance to sliding room partitions. The product helps to create a multi-purpose room for multiple uses
3. The design of sliding wall will surely accommodate your unique temperament and taste. The product ensures a safe user experience
4. This product has been considered as the best in the industry and widely used by people from various fields. The patterns of the product can be customized

Aluminium Frame Sound Proof Hotel Removable Acoustic Partition Wall

Attention
Bunge-Removable Partition Wall Manufacture | Aluminium Frame Sound

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.

Bunge-Removable Partition Wall Manufacture | Aluminium Frame Sound-1


Project case: Mexico function hall

Year of completion : 2018

Type of product : BUNGE Type 65 movable partition wall

Finish : Hard covered with fabric

Panel height : 3.2 meter

Total quantity : 28 ㎡

Color card: Fabric FB-27


Description


Acoustic partition wall is a kind of movable wall that can divide a large space into a small space. It can serve as a multi-purpose room with multiple functions.


Top hanging system without floor track. Also is seal and has good sound insulation.

 

Our factory can provide four series product let you have a choosing. Panel height is from finished floor to ceiling or beam. Panel width is from wall to wall.


Movable partition wall usually use in banquet hall,conference room,classroom,office and etc.


Our main structure that is aluminium frame with mdf board, inside soundproof rock wool and aluminium keen.


Bunge-Removable Partition Wall Manufacture | Aluminium Frame Sound-2Bunge-Removable Partition Wall Manufacture | Aluminium Frame Sound-3Bunge-Removable Partition Wall Manufacture | Aluminium Frame Sound-4
Technical information



SeriesBG 65BG 85 BG 100
Panel SuspensionTop hung onlyTop hung onlyTop hung only
Track systemSingle or twin pointSingle or twin pointSingle or twin point
Panel thickness 65 mm85 mm100 mm
Max height4 m6 m15 m
Panel width600-1200 mm600-1200 mm600-1200 mm
Face material9 mm MDF Board9 mm MDF Board9 mm MDF Board
Retractable sealsAluminium black with double rubber sealsAluminium black with double rubber sealsAluminium black with double rubber seals
Operation of sealsManual,with crank handleManual,with crank handleManual,with crank handle
Sound insulation20-35dB30-45dB35-53dB



Bunge-Removable Partition Wall Manufacture | Aluminium Frame Sound-5

Surface


Acoustic partition wall has three kinds surface.


First is mdf melamine,it can be more easy to clean.


Second is leather or fabric with hard cover inside aluminium frame.


Third is leather or fabric with hard cover hidden aluminium frame.


Fourth is mdf bare finish,client can paint prefer color on mdf board in local city.


Also has plywood finish,customers can paste wallpaper on it.


If client prefer to veneer surfrace,we should know whether needs paint color,and whether needs other extra surfrace.


If client prefer to use mirror  surface,mirror thickness is 5 mm,basic board is 5 mm.

Bunge-Removable Partition Wall Manufacture | Aluminium Frame Sound-6Bunge-Removable Partition Wall Manufacture | Aluminium Frame Sound-7

Bunge-Removable Partition Wall Manufacture | Aluminium Frame Sound-8

Aluminum Components of Retractable Partitions System


Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the retractable partitions panels with wheels.


Wheels/Rollers:  It is the carrier for the retractable partitions,let the panels move more flexibly.Pulley bearing is more than 1600 KGS.


Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.


Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.


Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.


Handle: Operate the retractable being up and down.


Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.


Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the retractable partitions.


MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Removable Partition Wall Manufacture | Aluminium Frame Sound-9Bunge-Removable Partition Wall Manufacture | Aluminium Frame Sound-10

Acoustic partition wall advantage

No rail suspension:the floor has no track, just install the track on the ceiling.


Stable and safe:Stable and reliable after partitioning, not easy to swing.


Retractable acoustic seals at top and bottom, operated either by quick release handle or semi-automatically with electronic controls.


Sound insulation and environmental protection:sound insulation effect is good,the sound insulation coefficient can reach 53 dB.


Insulation and energy saving: Excellent thermal insulation performance,according to different occupancy rates,

the sound proof partitions can divide a large space into small spaces to reduce air conditioning power consumption.


Efficient fire prevention: Sound proof partitions are made of high-efficiency fireproof material and has good fireproof performance.


Retractable and flexible:the sound proof partitions are freely retractable and flexible, and one person can complete the whole process of partitioning.


Bunge-Removable Partition Wall Manufacture | Aluminium Frame Sound-11

Bunge-Removable Partition Wall Manufacture | Aluminium Frame Sound-12Bunge-Removable Partition Wall Manufacture | Aluminium Frame Sound-13

Our service


1.Profession--We have professional sales staff. Any questions will be replied within 24 hours.


2.Price--Because we are factory,so we can provide nice quality and lower price products.


   Series 65,more than 80 square meters, free sample.


   Series 85,quantity up to 120 square meters, extra 20 rollers.


   Sereis 100, more than 200 square meters, discount 300 USD.


3.Service--Easy and convenient to transport,we promise timely delivery date, and good after-sale service.

  

4.Team--We have our own engineering department, according to your request for your tailor-made for your product.


5.Installing--Our engineer can come to teach installing,and we will also supply installing drawings and video.


Bunge-Removable Partition Wall Manufacture | Aluminium Frame Sound-14

Packing & shipping


Acoustic partition wall when we finished production, we will use carton packing and mdf board to pack movable panels. 


And we will also make one or more packing boxes for clients.It can reduce damagement during transportation.


We usually transport movable panels by sea, such as CIF price.


Some aluminium profile,sliding track,glass clips and other accessories we can transport by courier, like DHL or Fedx.


Bunge-Removable Partition Wall Manufacture | Aluminium Frame Sound-15Bunge-Removable Partition Wall Manufacture | Aluminium Frame Sound-16

Bunge-Removable Partition Wall Manufacture | Aluminium Frame Sound-17



Company Features
1. With a high popularity, Bunge has done a better performance over the years.
2. Guangdong Bunge Building Material Industrial Co.,Ltd is an international service team of sliding room dividers product.
3. To carry forward sliding partition walls is the base of Guangdong Bunge Building Material Industrial Co.,Ltd's work.
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...