Home  >  Quality PRODUCTS For sell  >  Certificated Acoustic Panels Factory  >  Polyester Acoustic Panels Manufacturer  > 

Bunge Brand auditorium absorbing soundproof ceiling panels room factory

Bunge Brand auditorium absorbing soundproof ceiling panels room factory

Bunge Brand auditorium absorbing soundproof ceiling panels room factory
  • Bunge Brand auditorium absorbing soundproof ceiling panels room factory
  • Bunge Brand auditorium absorbing soundproof ceiling panels room factory
  • Bunge Brand auditorium absorbing soundproof ceiling panels room factory
  • Bunge Brand auditorium absorbing soundproof ceiling panels room factory
  • Bunge Brand auditorium absorbing soundproof ceiling panels room factory
  • Bunge Brand auditorium absorbing soundproof ceiling panels room factory

Bunge Brand auditorium absorbing soundproof ceiling panels room factory

Model
9 mm polyester acoustic panels
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
5000 square meters
MOQ
No MOQ
Packing Details
Paper carton
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Operable walls
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly
Size: 9mm*1220mm*2440mm
Color: Can be customized
Style: Sliding
Product Comparison
Guangdong Bunge Building Material Industrial Co.,Ltd carries out strict quality monitoring and cost control on each production link of glass partitions, from raw material purchase, production and processing and finished product delivery to packaging and transportation. This effectively ensures the product has better quality and more favorable price than other products in the industry.In the design and production, Guangdong Bunge Building Material Industrial Co.,Ltd pays attention to the overall design and the details of the line design. movable walls has advantages such as good design, multiple functions, and outstanding performance.Guangdong Bunge Building Material Industrial Co.,Ltd guarantees folding partition to be high-quality by carrying out highly standardized production. Compared with other products in the same category, it has the following advantages.
  • Bunge-Professional Acoustic Absorption Panels Soundproof Panels For Home Manufacture
    v s
    Bunge-Professional Acoustic Absorption Panels Soundproof Panels For Home Manufacture-1
Company Advantages
1. soundproof ceiling panels perfectly combines art and innovation. Equipped with a sealing device, the product is praised for its tight sealing performance
2. Our skilled engineers ensures this high quality product by implementing the strict quality control system. The product finds its wide use in the banquet hall, conference room, office, etc
3. The product is optimized to maximize profits, and at the same time minimize the impact of business operations on the environment. It can be used to save the power consumption of the air conditioning

Sound Absorbing Materials Polyester Fiber Acoustic Wall Panels

Polyester Acoustic Panels Details


1. The acoustic panels of solid material uniformity, has a long life.

 

2. It has a good decorative effect, and more than 40 kinds of colors.

 

3. Environmental performance, formaldehyde content of.

 

4. Flame retardant in line with the national level GB50222-95B1.

 

5. Installation is simple and convenient construction.

Bunge-Professional Acoustic Insulation Panels Polyester Acoustic Panels


Technical Details

Details:
Name:
Polyester fibre acoustic panel
Material:
100% polyester fiber 
Size:
1220*2420mm or custom         
Color:
Custom
Shape:
Square or custom
Thickness:
9mm
Density:
1350gsm
Other details:
Pack:
Plastic bag and carton
MOQ:
20sheets,   negotiation
Delivery time:
7-15days
Payment term:
T/T, L/C, Western union,Paypal,Trade Assurance etc.
Shipping ways:
DHL/UPS/FedEx/EMS/by sea/by air


Bunge-Professional Acoustic Insulation Panels Polyester Acoustic Panels-1


Packing Details & Payment Terms

Packing detail:


offer customized packing, such as drawstring cotton bag, color box, pp bag, hangtag and so on.


Normal packing: pp bag and carton.


Delivery time:


by sea, 10-25days.


Payment term:


1.40% deposit by TT before production, 60% balance payment by TT before shipping.


2.L/C at sight when amount is up to 10,000USD.


Sample: Free sample.

 

Trade Terms:FOB


Shipping: by sea, by air and by express delivery.

Bunge-Professional Acoustic Insulation Panels Polyester Acoustic Panels-2


Polyester Acoustic Panles Application

The polyester acoustic wall panels are suitable for opera, theater, recording studio, recording studio, studio, audition room, radio, business office, function rooms, conference rooms, studio, concert hall, auditorium, gymnasium, leisure and entertainment, Hotels.

Bunge-Professional Acoustic Insulation Panels Polyester Acoustic Panels-3


Our Service

1.Profession: 10 years of domestic trade experience, access to more new and old customers favor 
2.Competitive Price: 
Direct factory price.
3.Guarantee: We support 
Trade Assurance which is a protection to your order and money.
4.Quality: Strict 
QC inspection before every shipment. We sincerely accpet the third party inspection.
5.Service: Our sales persons are available all day. You will definitely get an 
answer in 24 hours.
6. Inquiry: 
professional quotation.
7. OEM or ODM: Good experience of 
OEM or ODM for our customers.
8. For the production, mass production products photos and samples will send to you for approval.

Bunge-Professional Acoustic Insulation Panels Polyester Acoustic Panels-4



Company Features
1. The competitiveness of Guangdong Bunge Building Material Industrial Co.,Ltd in the affordable acoustic panels industry has been improved over the years.
2. Guangdong Bunge Building Material Industrial Co.,Ltd has the specialized production base.
3. Guangdong Bunge Building Material Industrial Co.,Ltd endeavors to continuously refine and improve our soundproof ceiling panels, services, and processes to better serve our customers. Get quote!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...