Movable Acoustic Sliding Folding Operable Partitions Wall Partitions
BUNGE FACTORY OFFER YOU
1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS.
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.
Operable partition wall is a kind of movable wall that can divide a large space into a small space. It can serve as a multi-purpose room with multiple functions.
Top hanging system without floor track. Also is seal and has good sound insulation.
Our factory can provide four series product let you have a choosing. Panel height is from finished floor to ceiling or beam. Panel width is from wall to wall.
Folding partition wall usually use in banquet hall,conference room,classroom,office and etc.
Our main structure that is aluminium frame with mdf board, inside soundproof rock wool and aluminium keen.
![]() | ![]() | ![]() |
Series | BG 65 | BG 85 | BG 100 |
Panel Suspension | Top hung only | Top hung only | Top hung only |
Track system | Single or twin point | Single or twin point | Single or twin point |
Panel thickness | 65 mm | 85 mm | 100 mm |
Max height | 4 m | 6 m | 15 m |
Panel width | 600-1200 mm | 600-1200 mm | 600-1200 mm |
Face material | 9 mm MDF Board | 9 mm MDF Board | 9 mm MDF Board |
Retractable seals | Aluminium black with double rubber seals | Aluminium black with double rubber seals | Aluminium black with double rubber seals |
Operation of seals | Manual,with crank handle | Manual,with crank handle | Manual,with crank handle |
Sound insulation | 20-35dB | 30-45dB | 35-53dB |
Operable partition wall has three kinds surface.
First is mdf melamine,it can be more easy to clean.
Second is leather or fabric with hard cover inside aluminium frame.
Third is leather or fabric with hard cover hidden aluminium frame.
Fourth is mdf bare finish,client can paint prefer color on mdf board in local city.
Also has plywood finish,customers can paste wallpaper on it.
If client prefer to veneer surfrace,we should know whether needs paint color,and whether needs other extra surfrace.
If client prefer to use mirror surface,mirror thickness is 5 mm,basic board is 5 mm.
![]() | ![]() |
Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the retractable partitions panels with wheels.
Wheels/Rollers: It is the carrier for the retractable partitions,let the panels move more flexibly.Pulley bearing is more than 1600 KGS.
Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.
Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.
Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.
Handle: Operate the retractable being up and down.
Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.
Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the retractable partitions.
MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.
![]() | ![]() |
No rail suspension:the floor has no track, just install the track on the ceiling.
Stable and safe:Stable and reliable after partitioning, not easy to swing.
Retractable acoustic seals at top and bottom, operated either by quick release handle or semi-automatically with electronic controls.
Sound insulation and environmental protection:sound insulation effect is good,the sound insulation coefficient can reach 53 dB.
Insulation and energy saving: Excellent thermal insulation performance,according to different occupancy rates,
the sound proof partitions can divide a large space into small spaces to reduce air conditioning power consumption.
Efficient fire prevention: Sound proof partitions are made of high-efficiency fireproof material and has good fireproof performance.
Retractable and flexible:the sound proof partitions are freely retractable and flexible, and one person can complete the whole process of partitioning.
1.Profession--We have professional sales staff. Any questions will be replied within 24 hours.
2.Price--Because we are factory,so we can provide nice quality and lower price products.
Series 65,more than 80 square meters, free sample.
Series 85,quantity up to 120 square meters, extra 20 rollers.
Sereis 100, more than 200 square meters, discount 300 USD.
3.Service--Easy and convenient to transport,we promise timely delivery date, and good after-sale service.
4.Team--We have our own engineering department, according to your request for your tailor-made for your product.
5.Installing--Our engineer can come to teach installing,and we will also supply installing drawings and video.
Operable partition wall when we finished production, we will use carton packing and mdf board to pack movable panels.
And we will also make one or more packing boxes for clients.It can reduce damagement during transportation.
We usually transport movable panels by sea, such as CIF price.
Some aluminium profile,sliding track,glass clips and other accessories we can transport by courier, like DHL or Fedx.
![]() | ![]() |
Copyright © 2018 Guangdong Bunge Building Material Industrial Co.,Ltd. | All Rights Reserved
Hello, please leave your name and email here before chat online so that we won't miss your message and contact you smoothly.