product-EBUNGE-img
Home  > PRODUCTS  > 

Boss Seat Cover Executive Modern Comfort High Back Leather Office Chair

product-EBUNGE-img
product-EBUNGE-img
product-EBUNGE-img
product-EBUNGE-Boss Seat Cover Executive Modern Comfort High Back Leather Office Chair-img
product-Boss Seat Cover Executive Modern Comfort High Back Leather Office Chair-EBUNGE-img-1
product-EBUNGE-img-1
product-EBUNGE-img-1

Boss Seat Cover Executive Modern Comfort High Back Leather Office Chair

Model
Office chair
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
7-20 days
Supply Ability
5000 pieces per month
MOQ
No MOQ
Packing Details
Inner PE foam ,Paper Cartons
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Office chair
Feature: Swivel Seat
Finish: Pu leather
Application: Office, conference room and etc
General use: Office furniture
Material: PU/mesh cover, chrome steel leg
Function: Swivel Seat
Size: 580*480*760mm
Color: Can be customized
Style: Modern style

Boss Seat Cover Executive Modern Comfort High Back Leather Office Chair 

Description

Leather office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and color amercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE-Oem Movable Partition Price List | Bunge Partitions

Techincal Information


Item Name 

Conference Leather Office Chair 

Size

580*480*760mm

Material

PU/mesh cover, chrome steel leg.

Standard Configuration

PU/mesh cover, chrome steel leg.

Selling Points

Light weight aluminum chair with pu leather seat

Package

Knock down packing, inner with bags and anti-ash package

Loading Information

Standard

 

EBUNGE-Oem Movable Partition Price List | Bunge Partitions-1

EBUNGE-Oem Movable Partition Price List | Bunge Partitions-2

EBUNGE-Oem Movable Partition Price List | Bunge Partitions-3

EBUNGE-Oem Movable Partition Price List | Bunge Partitions-4

EBUNGE-Oem Movable Partition Price List | Bunge Partitions-5

Feature


Office chair function &feature:

 

(1)Ergonomically designed for lasting comfort,you can adjust the backrest to any position up to 45 degrees.

 

(2)Fire-Resistance mesh fabric upholstered, different colors for option.

 

(3)3D adjustable armrest.

 

(4)Multifunctional tilt mechanism.

 

(5)Imported gas lift.

 

(6)Aluminum base.

 

(7PU plastic castors.

 

(8)Waterfall seat edge helps relieve pressure points on legs.

 

  

EBUNGE-Oem Movable Partition Price List | Bunge Partitions-6


Installing


EBUNGE-Oem Movable Partition Price List | Bunge Partitions-7

 

Packing


EBUNGE-Oem Movable Partition Price List | Bunge Partitions-8

We can offer


1. High quality at cost effective price.


2. Custom design and manufacturing according to your CAD drawing.


3. One-step full package office furniture solution:


Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.


4. Warranty is about 5-10 years to supply service.



Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...