Banquet Hall Soundproof mdf Room Separation Wood Folding Partition Wall Myanmar
Finished Project
In September,2018, we finished a MDF wood room separation folding partition wall project in Uganda. Totally 7 sets of wall, around 238 square meters.
This project is a little different, the client chose 5 different colors as it is for a school classroom. They wanted the environment more colorful. The surface is also melamine, the biggest features is that there are more than 60 colors to choose and very easy to clean. We also sent our engineer Mr.Zeng to supervise the installation.
Thanks for the trust from the client. In May,2019, the client also contacted us for the MDF wood room separation folding partition wall orders. The same size, same surface and same colors, because they will use them in the same school, just the different floor.
Everything goes well and the client felt satisfied with our MDF wood room separation folding partition wall system and happy to cooperate with BUNGE Company.
Technical Information
Model | BG65 | BG85 | BG100 |
Suspension System | Hanging System, with ceiling rails | ||
Basic Thickness | 65mm | 85mm | 100mm |
Max Height | Max 3800mm | Max 6000mm | Max 8000mm |
Width | 800 -1230mm | ||
Floor/ceiling Sealing strength | Telescopic aluminum tube with rubber strip | ||
Side Walls Sealing Strength | Double seal tape | ||
Base Board Thickness | 9 mm | 9 mm | 12 mm |
Vertical Profiles | Aluminum anodised with sealing profiles | ||
Retractable Seals | Aluminum black with double rubber seals | ||
Operation | Manual System, with supplied operating handle | ||
Pass Doors | Single or Double Pass Through Door Available | ||
Weight | Approx 22-35 kg/m² | Approx 25-40 kg/m² | Approx30-48 kg/m² |
Finish Options | Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc. (Customized) |
Client Visiting
Quality is the culture of BUNGE Company.
We are always focus on the quality of MDF wood room separation folding partition wall, and when the client come to visit our factory,all of them are satisfied on our quality.
Advantages
1. The MDF wood room separation folding partition wall is a hanging system, which have the ceiling rails, but have no floor reails. So it will not damage the floor or carpet at the project site.
2. All of the MDF wood room separation folding partition wall can be customized, such as the size, the colors and the surfaces.
3. The MDF wood room separation folding partition wall can help you divide a big space into 2 or more smaller rooms. When you do not use them, they can be parked to the parking zone conveniently and quickly.
4. The operation is very easy, 1 person can finish the whole operation.
5. More than 60 kinds of colors to choose.
6. Different surfaces also available. Such as the MDF, Plywood, Melamine, Veneer, Fabric and Leather surface.
Packaging & Delivery
Our Factory
Guangdong Bunge Building Material Industrial Co.,Ltd is a professional company in manufacturing Movable Partition Walls System. We are the real manufacturer, we have our own factory and showroom in Guangzhou, China, which covers an area over 3000 m². And we have around 10 years experience in it. There is a ultra-high system sample in our factory, over 8 meters. Every client who came to our factory was amazing in it. BUNGE Factory is always providing the clients with nice quality and competitive price movable wall system, and we are so strict to inspect the quality before delivering. So far, we have exported to USA, Australia Uganda, Lebanon, Sri-Lanka, Saudi Arabia, Philippines and many other countries.
As a professional manufacturer, we not only produce, we also design, deliver and have the after-sales service for clients. If the client need installation service, we also can send our technicians to supervise the installation. In addition, we also can supply free design to every client and we will reply in 12 hours if the clients have any questions.
Copyright © 2018 Guangdong Bunge Building Material Industrial Co.,Ltd. | All Rights Reserved
Hello, please leave your name and email here before chat online so that we won't miss your message and contact you smoothly.