product-EBUNGE-img
Home  > PRODUCTS  > Movable Walls  > Sliding Partitions  > 

Banquet Hall Removable Sound Proofing Sliding Wall Partitions System

product-EBUNGE-img
product-EBUNGE-img
product-EBUNGE-img
product-EBUNGE-Banquet Hall Removable Sound Proofing Sliding Wall Partitions System-img
product-Banquet Hall Removable Sound Proofing Sliding Wall Partitions System-EBUNGE-img-1
product-EBUNGE-img-1

Banquet Hall Removable Sound Proofing Sliding Wall Partitions System

Model
85 mm sliding partitions
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Sliding partitions
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
Color: Can be customized
Style: Sliding

Banquet Hall Removable Sound Proofing Sliding Wall Partitions System

Bunge-Professional Acoustic Partition Wall Movable Walls Commercial

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.


Nice Price Products

FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.

 

65 mm sliding partitions ONLY FOR $85.

 

85 mm sliding partitions ONLY FOR $98.

 

100 mm sliding partitions ONLY FOR $118.

 

125 ultra-high system sliding partitions ONLY FOR $130.

 

Please contact us for the Detailed Price.

 

WhatsApp:008613928983277

Bunge-Professional Acoustic Partition Wall Movable Walls Commercial-1

Product Description


  •   Reinforced aluminium frame construction for demanding condition.

  •     Wide range of sliding partitions walls surface finishes and colors.

  •   Single or double passdoor enabling access to neighbouring rooms.

  •   The sliding partition walls stacking can be one or both ends.

  •     Top hung and floor with rubber seals achieving excellent soundproof effect.

  •    Various levels of soundproof reduction.

Bunge-Professional Acoustic Partition Wall Movable Walls Commercial-2
Bunge-Professional Acoustic Partition Wall Movable Walls Commercial-3
Technical Details
SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Panel thickness65mm85mm100mm
Max height4000mm6000mm18000mm
Panel width500-1200 mm500-1200 mm500-1200 mm
Face material9mm9mm12 mm
PassdoorsSingle door or Double door
Sound insulation28-38dB Rw28-42dB Rw32-50dB Rw
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized)

Bunge-Professional Acoustic Partition Wall Movable Walls Commercial-4

Components of Sliding Partitions

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the sliding partition walls cost panels with wheels.

Wheels/Rollers:  It is the carrier for the sliding partitions ,let panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the Operable Wall Partitions.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Professional Acoustic Partition Wall Movable Walls Commercial-5
Bunge-Professional Acoustic Partition Wall Movable Walls Commercial-6
Bunge-Professional Acoustic Partition Wall Movable Walls Commercial-7

Parking Styles of Sliding Partitions

As you know, when we do not use the sliding partition walls, we can park them to the parking area. Actually there are many parking styles for the sliding partitions, all of the clients can choose the suitable one and we can adjust based on their own project site. If you need some pocket doors to hide the panels, BUNGE Factory also can produce for you.


Bunge-Professional Acoustic Partition Wall Movable Walls Commercial-8
Bunge-Professional Acoustic Partition Wall Movable Walls Commercial-9
Bunge-Professional Acoustic Partition Wall Movable Walls Commercial-10



Different Finishes of Movable Walls
  • ❶   Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  • ❷   Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  • ❸  Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  • ❹  Wallpaper, Vinyl, Fireproof board

  • ❺   Acoustic panels

  • ❻   Tempered glass, mirror etc.

Bunge-Professional Acoustic Partition Wall Movable Walls Commercial-11
Bunge-Professional Acoustic Partition Wall Movable Walls Commercial-12
Bunge-Professional Acoustic Partition Wall Movable Walls Commercial-13
Action Now

1.Buy 30 square meters Get 5% Discount.


2.Buy 80 square meters Get 10% Discount.


3.Get a FREE SAMPLE.


4.Support a 3 YEARS WARRANTY.


5.To be general, BUNGE Factory has 10+ years experience in the line of sliding partitions. The sliding partition walls we produced can divide the space speedy and conveniently. Due to their flexibility and cost effectiveness, now more and more clients need them to divide a large room. Also the sliding partition walls are widely used in office buildings, meeting room, hotel, banquet hall, conference and function halls, church, classroom and so on. Would you like to get a free design? Welcome to contact us at any time.

Bunge-Professional Acoustic Partition Wall Movable Walls Commercial-14


Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...