Home  > APPLICATION  > Hotel Partition Walls  >  Hotel Moveable Partitions Acoustic Wooden Hanging Folding Partition Walls
Hotel Moveable Partitions Acoustic Wooden Hanging Folding Partition Walls

Hotel Moveable Partitions Acoustic Wooden Hanging Folding Partition Walls

Model
85 mm folding partition walls
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Captcha

Loading verification code...

Please complete verification first

Product name: Operable walls
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
Color: Can be customized
Style: Sliding

Hotel Moveable Partitions Acoustic Wooden Hanging Folding Partition Walls

Bunge-Manufacturer Of Folding Partition Walls Hotel Moveable Partitions

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.


Nice Price Products

FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.

 

65 mm folding partition walls ONLY FOR $85.

 

85 mm folding partition walls ONLY FOR $98.

 

100 mm folding partition walls ONLY FOR $118.

 

125 ultra-high system folding partition walls ONLY FOR $130.

 

Please contact us for the Detailed Price.

Bunge-Manufacturer Of Folding Partition Walls Hotel Moveable Partitions-1

Product Description


  •   Reinforced aluminium frame construction for demanding condition.

  •       Wide range of sliding partitions walls surface finishes and colors.

  •   Single or double passdoor enabling access to neighbouring rooms.

  •     The sliding partition walls stacking can be one or both ends.

  •     Top hung and floor with rubber seals achieving excellent soundproof effect.

  •     Various levels of soundproof reduction.

Bunge-Manufacturer Of Folding Partition Walls Hotel Moveable Partitions-2
Bunge-Manufacturer Of Folding Partition Walls Hotel Moveable Partitions-3
Technical Details
SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Panel thickness65mm85mm100mm
Max height4000mm6000mm18000mm
Panel width500-1200 mm500-1200 mm500-1200 mm
Face material9mm9mm12 mm
PassdoorsSingle door or Double door
Sound insulation28-38dB Rw28-42dB Rw32-50dB Rw
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized)

Bunge-Manufacturer Of Folding Partition Walls Hotel Moveable Partitions-4

Components of Sliding Partitions

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the hotel folding partition walls cost panels with wheels.

Wheels/Rollers:  It is the carrier for the hotel folding partition walls ,let panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the hotel folding partition walls.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Manufacturer Of Folding Partition Walls Hotel Moveable Partitions-5
Bunge-Manufacturer Of Folding Partition Walls Hotel Moveable Partitions-6
Bunge-Manufacturer Of Folding Partition Walls Hotel Moveable Partitions-7

Parking Styles of Folding Partition Walls

As you know, when we do not use the hotel folding partition walls, we can park them to the parking area. Actually there are many parking styles for the hotel folding partition walls, all of the clients can choose the suitable one and we can adjust based on their own project site. If you need some pocket doors to hide the panels, BUNGE Factory also can produce for you.


Bunge-Manufacturer Of Folding Partition Walls Hotel Moveable Partitions-8
Bunge-Manufacturer Of Folding Partition Walls Hotel Moveable Partitions-9
Bunge-Manufacturer Of Folding Partition Walls Hotel Moveable Partitions-10



Different Finishes of Movable Walls
  • ❶   Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  • ❷   Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  • ❸  Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  • ❹  Wallpaper, Vinyl, Fireproof board

  • ❺   Acoustic panels

  • ❻   Tempered glass, mirror etc.

Bunge-Manufacturer Of Folding Partition Walls Hotel Moveable Partitions-11
Bunge-Manufacturer Of Folding Partition Walls Hotel Moveable Partitions-12
Bunge-Manufacturer Of Folding Partition Walls Hotel Moveable Partitions-13
Action Now

1.Buy 30 square meters Get 5% Discount.


2.Buy 80 square meters Get 10% Discount.


3.Get a FREE SAMPLE.


4.Support a 3 YEARS WARRANTY.


5.To be general, BUNGE Factory has 10+ years experience in the line of hotel folding partition walls. The hotel folding partition walls we produced can divide the space speedy and conveniently. Due to their flexibility and cost effectiveness, now more and more clients need them to divide a large room. Also the sliding partition walls are widely used in office buildings, meeting room, hotel, banquet hall, conference and function halls, church, classroom and so on. Would you like to get a free design? Welcome to contact us at any time.

Bunge-Manufacturer Of Folding Partition Walls Hotel Moveable Partitions-14


Product Message

Loading verification code...

Please complete verification first

社媒暂无评论
Contact
/* 客户要求添加的 */