product-movable partition walls-EBUNGE-img
Home  > PRODUCTS  > Movable Walls  > Operable Partitions  > 

Banquet Hall Acoustic Operable Movable Partition Walls Malaysia

product-EBUNGE-img
product-EBUNGE-movable partition walls-img
product-EBUNGE-img
product-EBUNGE-Banquet Hall Acoustic Operable Movable Partition Walls Malaysia-img
product-Banquet Hall Acoustic Operable Movable Partition Walls Malaysia-EBUNGE-img-1
product-movable partition walls-EBUNGE-img-1

Banquet Hall Acoustic Operable Movable Partition Walls Malaysia

Model
65 mm movable partition walls
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
5000 square meters
MOQ
No MOQ
Packing Details
Paper cartons, outside with wooden boxes
OEM/ODM
Accept
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Movable partition walls
Feature: Sound proofing
Partition material: MDF+Melamine
Finish: Plywood,melamine,fabric and leather
Application: Hotel,banquet hall
General use: Commercial furniture
Material: 100% Polyester Fiber
Function: Save space
Size: Accept customized
Color: Can be customized
Style: Sliding doors

Banquet Hall Acoustic Operable Movable Partition Walls Malaysia

Finished Project

A nice project for meeting room in Bangkok,Thailand.


The client chose the plywood finish, and he will decorate the surface by wallpaper at project site.


Size:14.65*5.5 meters, totally 80.6 square meters.


  • Bunge-Manufacturer Of Movable Walls Banquet Hall Acoustic Operable Movable PartitionBunge-Manufacturer Of Movable Walls Banquet Hall Acoustic Operable Movable Partition-1

    Bunge-Manufacturer Of Movable Walls Banquet Hall Acoustic Operable Movable Partition-2

Nice Price Products

FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.

 

65 mm movable partition walls ONLY FOR $85.

 

85 mm movable partition walls ONLY FOR $98.

 

100 mm movable partition walls ONLY FOR $118.

 

125 ultra-high system movable partition walls ONLY FOR $130.

 

Please contact us for the Detailed Price.

 

WhatsApp:008613928983277

Bunge-Manufacturer Of Movable Walls Banquet Hall Acoustic Operable Movable Partition-3

Product Description


  • BUNGE movable partition walls are used to divide meeting rooms, conference rooms, restaurant and banquet halls etc., it provides convenient and effective space management solutions, the panels move on a ceiling track with no requirement of floor guides or rails, its has been extensively applied to hotel industry.

  • BUNGE offers products and service with the end user in mind. We build in features that provide benefits to the owner over the life of the movable partition walls. Features such as protective edge trim will keep your partitions looking good for many years to come.

  • The movable partition walls consist of a series of interlocking flat panels and the fast set retractable top and bottom seals provide the easiest in-field operation, a simple half-turn of the waist high removable handle extends or retracts the sound seals.

  • The quick set retractable seals save the owner a great deal of time during setup and take down

    Time means money, especially for clients that rent their facilities for meetings and other functions.

  • BUNGE provides movable partition walls panel finishes such as melamine, fabric, leather, wood veneer, high-pressure laminate or other custom surfaces, panels also be supplied unfinished(raw mdf or plywood) for field decoration to compliment the building environment.

Bunge-Manufacturer Of Movable Walls Banquet Hall Acoustic Operable Movable Partition-4
Bunge-Manufacturer Of Movable Walls Banquet Hall Acoustic Operable Movable Partition-5
Technical Details
SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Panel thickness65mm85mm100mm
Max height4000mm6000mm18000mm
Panel width500-1200 mm500-1200 mm500-1200 mm
Face material9mm9mm12 mm
PassdoorsSingle door or Double door
Sound insulation28-38dB Rw28-42dB Rw32-50dB Rw
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized)
Action Now

1.Buy 30 square meters Get 5% Discount.


2.Buy 80 square meters Get 10% Discount.


3.Get a FREE SAMPLE.


4.Support a 3 YEARS WARRANTY.


5.To be general, BUNGE Factory has 10+ years experience in the line of movable partition walls. The movable partition walls we produced can divide the space speedy and conveniently. Due to their flexibility and cost effectiveness, now more and more clients need them to divide a large room. Also the movable partition walls are widely used in office buildings, meeting room, hotel, banquet hall, conference and function halls, church, classroom and so on. Would you like to get a free design? Welcome to contact us at any time.

Bunge-Manufacturer Of Movable Walls Banquet Hall Acoustic Operable Movable Partition-6

Components of Movable Partition Walls

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the movable partition walls with wheels.

Wheels/Rollers:  It is the carrier for the movable partition walls ,let panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the operable partition walls.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Manufacturer Of Movable Walls Banquet Hall Acoustic Operable Movable Partition-7Bunge-Manufacturer Of Movable Walls Banquet Hall Acoustic Operable Movable Partition-8

Bunge-Manufacturer Of Movable Walls Banquet Hall Acoustic Operable Movable Partition-9

Parking Styles of Movable partition walls

As you know, when we do not use the movable partition walls, we can park them to the parking area. Actually there are many parking styles for the movable partition walls, all of the clients can choose the suitable one and we can adjust based on their own project site. If you need some pocket doors to hide the panels, BUNGE Factory also can produce for you.


Bunge-Manufacturer Of Movable Walls Banquet Hall Acoustic Operable Movable Partition-10Bunge-Manufacturer Of Movable Walls Banquet Hall Acoustic Operable Movable Partition-11

Bunge-Manufacturer Of Movable Walls Banquet Hall Acoustic Operable Movable Partition-12

Different Finishes of Movable Partition Walls
  • ❶   Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  • ❷   Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  • ❸  Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  • ❹  Wallpaper, Vinyl, Fireproof board

  • ❺   Acoustic panels

  • ❻   Tempered glass, mirror etc.

  • Bunge-Manufacturer Of Movable Walls Banquet Hall Acoustic Operable Movable Partition-13Bunge-Manufacturer Of Movable Walls Banquet Hall Acoustic Operable Movable Partition-14

    Bunge-Manufacturer Of Movable Walls Banquet Hall Acoustic Operable Movable Partition-15

Package for Tracks System
  • Bunge-Manufacturer Of Movable Walls Banquet Hall Acoustic Operable Movable Partition-16Bunge-Manufacturer Of Movable Walls Banquet Hall Acoustic Operable Movable Partition-17

    Bunge-Manufacturer Of Movable Walls Banquet Hall Acoustic Operable Movable Partition-18


Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...