Home  >  Quality PRODUCTS For sell  >  Certificated Acoustic Panels Factory  >  Perforated Wooden Acoustic Panels Factory  > 

anditordium Custom interior sound deadening panels wall Bunge

anditordium Custom interior sound deadening panels wall Bunge

anditordium Custom interior sound deadening panels wall Bunge
  • anditordium Custom interior sound deadening panels wall Bunge
  • anditordium Custom interior sound deadening panels wall Bunge
  • anditordium Custom interior sound deadening panels wall Bunge
  • anditordium Custom interior sound deadening panels wall Bunge
  • anditordium Custom interior sound deadening panels wall Bunge
  • anditordium Custom interior sound deadening panels wall Bunge
  • anditordium Custom interior sound deadening panels wall Bunge
  • anditordium Custom interior sound deadening panels wall Bunge

anditordium Custom interior sound deadening panels wall Bunge

Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Cartons or according to customer's request.
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Perforated acoustic panels
Finish: Melamine,veneer, metal,paint, anti-fire plate
Application: Auditorium,hall,multifunction room,studio room
General use: Office furniture
Material: MDF
Function: Fireproof and eco-friendly
Size: 600*600, 1200*600,2400*1200 mm
Color: Can be customized
Application Scope
movable walls can be applied to different industries, fields and scenes.Guangdong Bunge Building Material Industrial Co.,Ltd insists on providing customers with comprehensive solutions based on their actual needs, so as to help them achieve long-term success.Guangdong Bunge Building Material Industrial Co.,Ltd introduces advanced decorative production technology and uses fine workmanship in the production of various movable walls. We have various choices for styles, such as classic style, fashion style, novel style, and regular style. Moreover, art and creative design are adopted into each product.
  • Bunge-Best Acoustic Panels | Decorative Interior Fireproof Materiral Auditorium
Company Advantages
1. Different from common material, material for sound deadening panels gains the absolute advantage in characteristics of sound suppression panels. The product ensures a safe user experience
2. It is made through a process that involves rigorous quality testing. It adopts the convenient hanging system without the floor track
3. This product is vigilantly examined by our quality testing department. There are various colors offered for the product
4. To meet the needs of customers who pursue high-quality noise reduction panels, Bunge has successfully made it. The product features a retractable performance

Decorative Interior Fireproof Materiral Auditorium Wooden Perforated Acoustic Panels


Attention
Bunge-Manufacturer Of Noise Reduction Panels Acoustic Isolation Panels

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.

Bunge-Manufacturer Of Noise Reduction Panels Acoustic Isolation Panels-1


Description


Wooden Perforated Acoustic Panels has particular holes, machined through the surface and back of the panel.These panels are consist of a laminate finished surface, base core board and black acoustic felt attached on the back. The base core board is an 15mm thick MDF sheet (Middle Density Fiberboard) with a finish laminated to its front face and black acoustic felt adhered to its rear face. It is suitable for dancing hall, hotel, school, exhibition, office, lecture theater etc.


Bunge-Manufacturer Of Noise Reduction Panels Acoustic Isolation Panels-2

Technical information


Structure

Basic Material, Finish&Balanced Finish

Basic Material

E1 MDF, FR MDF, MgO Combination Board etc.

Finish

Melamine, Natural Wood Veneer, Paint etc

Balanced

Black Fleece

Standard Dimension

600*600, 1200*600, 1200*1200, 2400*1200

Thickness

12/15/18mm

Distance between two holes

8/8mm, 16/16mm, 32/32mm or customized


Bunge-Manufacturer Of Noise Reduction Panels Acoustic Isolation Panels-3

Application


Wooden perforated acoustic panel usually using in following areas:


(1)Home application ( wall acoustic, ceiling sound acoustic)


(2)Entertainment application: KTV, hotel, bar, night club, disco, cinema


(3)Workplace application: office building, meeting room, office room, studio, recording room.


(4)Industrial place application: air conditioning facilities, air compressor room, manufacture workshop.


Bunge-Manufacturer Of Noise Reduction Panels Acoustic Isolation Panels-4

Wooden perforated acoustic panel installing


1.First fix the aluminum profile onto the wooden frame or bottom board, and their distance suggested 6about 600mm.


2.Filled the 32-64kg/m density acoustic foam among aluminum profiles.


3.Use the clips to fix the perforated acoustic panel to the aluminum profile.


4.When install several acoustic panel, the distance between noses to noses suggested 2-3mm.


5.If install the acoustic panel in the horizontal way, then the notch of the panel should face down, and it need to be fixed tight with clips. After that install pieces and pieces of acoustic panel onto the lowest one.

Bunge-Manufacturer Of Noise Reduction Panels Acoustic Isolation Panels-5Bunge-Manufacturer Of Noise Reduction Panels Acoustic Isolation Panels-6

Our Service
Our service


1.Profession--We have professional sales staff. Any questions will be replied within 24 hours.


2.Price--Because we are factory,so we can provide nice quality and lower price products.


   More than 500 square meters, free sample.


   Quantity up to 800 square meters, discount 300 USD.


   More than 1500 square meters, extra installing tools.


3.Service--Easy and convenient to transport,we promise timely delivery date, and good after-sale service.

  

4.Team--We have our own engineering department, according to your request for your tailor-made for your product.


5.Installing--Our engineer can come to teach installing,and we will also supply installing drawings and video.


Bunge-Manufacturer Of Noise Reduction Panels Acoustic Isolation Panels-7

FAQ


1.How can you guarantee the quality?


We have a modern management system. Take strict selection for upstream suppliers to insure the basic material to be good quality. And we pay more attention to production technology and staff training, so that the defective rate is less than 1% of each products, save cost at the production line. When the productions are ready, they would be sent to the package workshop, put in carton with foam between each panel to avoid the friction and damage.


2.Can you offer sample?


Yes, we can offer standard samples for free, and customization is available.


3.Do you accept customization?


Yes, we can support our clients with OEM, so that it can be easier to open the local market and build a long-term partnership between us.


4.How long is the lead time?


Normally 10-25 days upon receiving the deposit, base on the quantity 1,500 SQM


5.Can you assist for installation?


Yes, we can arrange to assist in installation if needed.


6.Do you have CE certificate?


Yes, we do. We have shipped many goods to European countries.


7.What are the factors of influencing the NRC?


Perforation rate, gap between the wall and panel, the density and thickness of the glass wool, etc. All these factors will effect NRC.


8.What's the difference between normal panel and acoustic panel?


Acoustic panel also called soundproof panel which is designed according to the law of soundproofing. There are mainly three functions of acoustic panel. Sound absorbing, sound diffusing and sound insulation, with respect to a specified sound source and receptor: increasing the distance between source and receiver, using acoustic panel to reflect or absorb the energy of the sound waves, using damping structures such as acoustic panel, or using active antinoise sound generators.



Company Features
1. Bunge takes the dominant place in sound deadening panels industry.
2. Guangdong Bunge Building Material Industrial Co.,Ltd has a seasoned R&D team.
3. Serving customers and contributing to the society are the business philosophy of Guangdong Bunge Building Material Industrial Co.,Ltd. Contact!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...