product-EBUNGE-img
Home  > PRODUCTS  > Movable Walls  > Sliding Partitions  > 

Aluminum Operable Movable Partition Walls For Classroom / Meeting Room

product-EBUNGE-img
product-EBUNGE-img
product-EBUNGE-img
product-EBUNGE-Aluminum Operable Movable Partition Walls For Classroom Meeting Room-img
product-Aluminum Operable Movable Partition Walls For Classroom Meeting Room-EBUNGE-img-1

Aluminum Operable Movable Partition Walls For Classroom / Meeting Room

Model
85 mm movable walls
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
12-30 days based on the different places
Supply Ability
5000 square meters
MOQ
No MOQ
Packing Details
Paper cartons, outside with wooden boxes
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Movable walls
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly
Size: 9mm*1220mm*2440mm
Color: Can be customized
Style: Sliding

Aluminum Operable Movable Partition Walls For Classroom / Meeting Room


Bunge-Movable Room Dividers Aluminum Operable Movable Partition

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS.
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.



Product Description


1- 65mm ,85mm, 100mm aluminum frame thickness panel ,Max height up to 15 meters.

 

2-Top supported without floor track or guide, only have track on the ceiling.

 

3- clear anodized extruded aluminum tracks and frames,customized powder coated color are available.

 

4- Sound insulation certificate :STC 32db to 52db, ASTM standard of acoustic tested in HongKong.

 

5- Available in wide range of finishes, melamine ,fabric/PU leather, HPL, printing etc.

 

6- Fast delivery and Rich experiences in oversea project installation guide & supervision.


Bunge-Movable Room Dividers Aluminum Operable Movable Partition-1

Advantages of BUNGE Movable Walls System

  •   Economic overhead support with angle iron.

  •    Easy to setup and collect.

  •     No auxiliary storage tracks or support are required.

  •   The movable walls panels are designed to be stored at both ends or one end of the opening.

  •     Simple automatic bottom seal for efficient operation.

  •    Suitable for applications that require superior durability, soundproof and frequent use.

       Ideal for classrooms, meeting rooms or soundproof office movable partition walls.
Bunge-Movable Room Dividers Aluminum Operable Movable Partition-2
Bunge-Movable Room Dividers Aluminum Operable Movable Partition-3

Specifications of BUNGE Movable Walls System


SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Panel thickness65mm85mm100mm
Max height4000mm6000mm18000mm
Panel width500-1200 mm500-1200 mm500-1200 mm
Face material9mm9mm12 mm
PassdoorsSingle door or Double door
Sound insulation28-38dB Rw28-42dB Rw32-50dB Rw
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized)

Bunge-Movable Room Dividers Aluminum Operable Movable Partition-4


Components of Movable Wall Partitions System

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the operable waalls cost panels with wheels.

Wheels/Rollers:  It is the carrier for the Movable wall ,let panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the Operable Wall Partitions.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Movable Room Dividers Aluminum Operable Movable Partition-5
Bunge-Movable Room Dividers Aluminum Operable Movable Partition-6
Bunge-Movable Room Dividers Aluminum Operable Movable Partition-7



Stacking Options of BUNGE Movable Walls System



Bunge-Movable Room Dividers Aluminum Operable Movable Partition-8
Bunge-Movable Room Dividers Aluminum Operable Movable Partition-9
Bunge-Movable Room Dividers Aluminum Operable Movable Partition-10




Finishes Options of BUNGE Operable Wall Partitions System

  •    Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  •    Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  •   Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  •   Wallpaper, Vinyl, Fireproof board

  •    Acoustic panels

  • ❻   Tempered glass. etc.

Externally, most Operable Walls  panels look the same, but it’s not simply the outside which makes a good operable walls, it is what’s inside the panel which makes the difference.


Bunge-Movable Room Dividers Aluminum Operable Movable Partition-11
Bunge-Movable Room Dividers Aluminum Operable Movable Partition-12
Bunge-Movable Room Dividers Aluminum Operable Movable Partition-13



Nice Price Products

 

FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.

 

65 mm movable partition walls ONLY FOR $85.

 

85 mm movable partition walls ONLY FOR $98.

 

100 mm movable partition walls ONLY FOR $118.

 

125 ultra-high system movable partition walls ONLY FOR $130.

 

Please contact us for the Detailed Price.

 

WhatsApp:008613928983277

Bunge-Movable Room Dividers Aluminum Operable Movable Partition-14


Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...