Movable Partition Wall Hardwares,Accessories,Rollers and Tracks
BUNGE FACTORY OFFER YOU
1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS.
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.
Panel Suspension | Top hunge system without the need for a floor track. |
Panel Width | Each panel 600mm-1200mm. |
Track | Aluminum OR Steel Track |
Roller on panel | Single or Double Roller |
Panel Frames | Heavy-duty steel-gusseted aluminum inner frames reinforced with full height. |
Top bottm seals | Top and bottom pressure retractable seals ensure effortless moved and locked. |
Module | 700mm - 1200mm maximum. |
Panel stacking | Numerous panel stacking options for complete flexibility. |
Panel face | MDF,Plywood, woven fabric, Leather,Natural wood veneer, Melamine,Wood moldings, etc. |
Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the movable partitions panels with wheels.
Wheels/Rollers: It is the carrier for the movable partitions,let the panels move more flexibly.Pulley bearing is more than 1600 KGS.
Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.
Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.
Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.
Handle: Operate the retractable being up and down.
Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.
Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the movable partitions.
MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.
❶ Wooden (MDF, Plywood bare raw finish) & (Melamine, Veneer)
❷ Fabric (fabric with mdf board hard covers) & (fabric with sponge soft covers)
❸ Leather (leather with mdf hard covers) & (leather with sponge soft covers)
❹ Wallpaper, Vinyl, Fireproof board
❺ Acoustic panels
❻ Tempered glass. etc.
Externally, most Movable Partition Accessories panels look the same, but it’s not simply the outside which makes a good movable wall, it is what’s inside the panel which makes the difference.
The movable walls and partition accessories are widely used in hotel,auditorium,Gym,office,meeting rooms,exhibition halls,conference rooms,international convention centers,KTV,upscale restaurants,classroom,schools,hospitals,multi-purpose hall and other public places .
Copyright © 2018 Guangdong Bunge Building Material Industrial Co.,Ltd. | All Rights Reserved
Hello, please leave your name and email here before chat online so that we won't miss your message and contact you smoothly.