Aluminum Frame Frosted Glass Office Partition Cubicles Office Workstations-EBUNGE
Home  > PRODUCTS  > Office Furniture  > 

Aluminum Frame Frosted Glass Office Partition Cubicles Office Workstations

Aluminum Frame Frosted Glass Office Partition Cubicles Office Workstations-EBUNGE
EBUNGE-Aluminum Frame Frosted Glass Office Partition Cubicles Office Workstations
Aluminum Frame Frosted Glass Office Partition Cubicles Office Workstations-EBUNGE
EBUNGE
EBUNGE
Aluminum Frame Frosted Glass Office Partition Cubicles Office Workstations-EBUNGE

Aluminum Frame Frosted Glass Office Partition Cubicles Office Workstations

Model
BG Office Workstations
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
5000 sets
MOQ
No MOQ
Packing Details
Paper carton
OEM/ODM
Accept
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Office Workstations
Feature: Eco-friendly
Aluminium frame thickness: 3.2CM/4.5CM/2.0CM/1.8CMthickness
Partition material: Aluminum and board
Finish: Melamine,veneer
Application: Conference room,office,meeting room
General use: Office furniture
Material: MDF+Melamine
Function: Office Work,office partitions,office dividers,office standing
Size: Accept customized
Color: Can be customized
Style: Modern

Aluminum Frame Frosted Glass Office Partition Cubicles Office Workstations

Office Workstations Deatils

 

This office workstation partition is elegant and natural style. With natural wooden and sunshine yellow color can shine office place, make you more comfortable when working. Also match ashtraies on each station for your convinience.

 

* Material: E1 grade melamine faced chipboard ,Table top 25mm ,2mm pvc edge banding.


* foot stool: painted cone white foot stool with wire groove.


* Screen: 9mm wooden board .


* Price includes three smoke ark on the table, for one single station price.


Bunge-Professional Contemporary Office Desk Cubicle Workstation Manufacture


Technical Information
ItemFactory direct sell office furniture oem modular office furniture
Item NOBUNGE Office partition walls
NameOffice workstation, office partition,office cubicle
ShapeOptional/based on clients‘ requirement
PackagingFilm+foam+carton+wooden frame (4 layers protection)
Size1200W*600D*1050H and optional
Desk top MaterialTop grade E1 MFC melamine board
Partition MaterialAluminum /tempered glass
Desktop Seal edgePVC/ABS
Products CharacterEco-friendly,Anti-Water, Anti-Scratch, Anti-Dirty
Model No.BUNGE Office Workstations
MaterialE1 Level High Density Board/Melamine/Aluminum
Size1500*500*750/seater
CBM0.5 cbm/5 PC
Net Weight75 KG
QTY/40HQ180 pieces
Steel Thickness1.5MM thickness tube
ColorMore than 20 colors can be optional.
PackingStandard carton with foam corner
Advantages* Thousands of models for choice to meet different client's demands;
Different styles with different price range, can control cost with best way;
* Customized service, OEM, ODM available

Bunge-Professional Contemporary Office Desk Cubicle Workstation Manufacture-1

Office Workstations Advantages

1--Office partitions table design,fresh MFC boards are strong and innocuous,safe for long time using; 


2--Firmer frame,enable it can support maximum strength in public;


3--Detachable structure, so more quantity in container is allow,save your shipping cost;


4--Easy for installationin, All accessories and screws will be along with goods;


5--Plastic footpad under frame to keep the ground out of scratching;


6--BUNGE colour options available are Green,Light Gray,or as your request.

Bunge-Professional Contemporary Office Desk Cubicle Workstation Manufacture-2


Office Partitions Finishing

There are 3 kinds of finishes to choose:

Bunge-Professional Contemporary Office Desk Cubicle Workstation Manufacture-3


Packaging & Delivery

Detailed Packing:

 

1. KD packing.

 

2. Shipping marks can be decided by customers.

 

3. Outside: thick carton to reduce extrusion & collision in transit.

 

4. Inside: masking tape and bubble bag to protect the chair not to be affected with damp and crash during transit.

 

Shipping Details:

 

1. Courier Shipment including DHL, UPS, FEDEX. We will search the most economic and reliable shipping company to transport the goods safely.

 

2. Airport Shipment. If your order exceeds 100kg, air shipment will be more economical than express.

 

3. Ocean Shipment. If you order large quantity goods, we can help you to deliver them by sea.

Saving Space Office Furniture Contemporary Office Cubicles 2-6 Seat Office Partition Workstations


Our Service

Our Service

 

1. High-level professional, experienced and skillful technicians to control design and quality of medical mesh office chair with locking casters.

 

2. Reply within 12 hours.

 

3. Prompt delivery.

 

4. First class after-sales service.

 

5. Provide free accessories for customer to reserve before shipment.

 

 

Quality Control:

 

1. Before the mass production, the Pre-Production Sample will be made firstly. Material and color will be checked with the clients.

 

2. The medical mesh office chair with locking casters will be traced from the material purchase.

 

3. Every production procedure, our QC will check the quality carefully and trial assembly.

 

4. The finished medical mesh office chair with locking casters will be checked again and cleaned before packing.

Bunge-Professional Contemporary Office Desk Cubicle Workstation Manufacture-5


Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...