Home  >  Quality PRODUCTS For sell  >  Glass Partitions Manufacturer  >  Quality Solid Glass Partitions  > 

aluminium glass office glass partition design partitions Bunge Brand

aluminium glass office glass partition design partitions Bunge Brand

aluminium glass office glass partition design partitions Bunge Brand
  • aluminium glass office glass partition design partitions Bunge Brand
  • aluminium glass office glass partition design partitions Bunge Brand
  • aluminium glass office glass partition design partitions Bunge Brand
  • aluminium glass office glass partition design partitions Bunge Brand
  • aluminium glass office glass partition design partitions Bunge Brand
  • aluminium glass office glass partition design partitions Bunge Brand

aluminium glass office glass partition design partitions Bunge Brand

Model
BG glass partitions
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
5000 square meters
MOQ
No MOQ
Packing Details
Paper cartons, outside with wooden boxes
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Fixed glass partitions
Feature: Sound proofing
Aluminium frame thickness: 2-4 meters
Partition material: 600 - 1200 mm
Finish: Clear glass
Application: Office,conference room,meeting room
General use: Office furniture
Material: Aluminum+clear glass
Function: Fireproof and eco-friendly
Size: Accept customized
Color: Can be powder coated
Style: Modern
Product Details
Guangdong Bunge Building Material Industrial Co.,Ltd's glass partitions is of exquisite workmanship, which is reflected in the details.In the design and production, Guangdong Bunge Building Material Industrial Co.,Ltd pays attention to the overall design and the details of the line design. movable walls has advantages such as good design, multiple functions, and outstanding performance.Guangdong Bunge Building Material Industrial Co.,Ltd's glass partitions is manufactured in strict accordance with relevant national standards. Every detail matters in the production. Strict cost control promotes the production of high-quality and priced-low product. Such a product is up to customers' needs for a highly cost-effective product.
  • Bunge-High-quality Glass Walls And Doors | Solid Aluminum Frame Double Glazed
Product Comparison
Well-chosen in material, fine in workmanship, excellent in quality and favorable in price, Guangdong Bunge Building Material Industrial Co.,Ltd's folding partition is highly competitive in the domestic and foreign markets.Guangdong Bunge Building Material Industrial Co.,Ltd runs multi fully automated production lines and produces movable walls according to the national building materials standard. Diverse in product line and favorable in price, our products are safe and eco-friendly and enjoy a wide recognition in the market. They are available in a wide range of styles and specifications for various scenarios. Choosing the right product can bring its maximum effect and create a good user experience.Compared with other products in the same category, folding partition has outstanding advantages which are mainly reflected in the following points.
  • Bunge-High-quality Glass Walls And Doors | Solid Aluminum Frame Double Glazed-1
    v s
    Bunge-High-quality Glass Walls And Doors | Solid Aluminum Frame Double Glazed-2
Company Advantages
1. In the production of Bunge partition wall with glass, the superior material is applied properly. The product is found to have good sound insulation
2. The product is in compliance with international industry quality standards. The product promises that there will be no scratch issues
3. This product enjoys long service time for its sophisticated quality. The product can far reach from one wall to another wall
4. Guangdong Bunge Building Material Industrial Co.,Ltd's advantages are well known by our customers. Made of high-efficiency fireproof material, it is noted for its efficient fire prevention function

Solid Aluminum Frame Double Glazed Fixed Glass Partition Walls

Fixed Glass Partitions Deatils


 

 

Material 

Panel :melamine laminated MDF, Veneer surfaces are protected with melamine board

Can be with different color, referring to the color sample

 

 

Finishing

Smooth surface finish / FABRIC

Environment-friendly PE painting

Detailed finishing process ensuring the uncompromised quality and consistent beauty

Accessory

Aluminum frame, etc.

Specific Use

Company receptions, hotel and so on

Trade Term

FOB, CIF, CIF, EXW, etc.

Payment Terms

T/T, L/C, Western Union, PayPal, etc.

MOQ

5 Piece/Pieces Better price for more Trial Order

Packing

Knocked-down packing(CKD), use standard export carton with foam inner to protect goods

Delivery Date

25—30 days

Supply Ability

1000 Piece/Pieces per Month accept mixed order

Transportation

Ship, air, express, mixed, etc., 
under items such as EXW, FOB, CIF, CNF, etc.

Assembling

Technical director, field installation

Special service

Accept both mixed and small order;
Accept custom-made, OEM, ODM Trial Order


Bunge-Find Glass Walls And Doors Interior Glass Wall Systems From Bunge

Technical Information
Material
Aluminum
Construction: Thermal break or Non-thermal break
Thickness: 1.0/2.0mm for window & door & glass room, 2.0/2.5 for walls
Surface treatment: Powder-coated/Anodized/Electrophoresis/PVDF, etc. 
Color: Silver/Bronze/Champagne/White/Black, etc. 
Type: low-e/Reflective/Tempered/Heat-strengthened/Floated
Glass
Glazed: Single/Double/Triple
Single Thickness: 8mm - 12mm
Double Thickness: 5mm + 6A + 5mm/ 5mm + 9A + 5mm/ 6mm + 9A + 6mm, etc.
Triple Thickness: 5mm + 6A + 5mm + 6A + 5mm or customized
Color: Clear/Grey/Blue/Light Green/White/Black, etc. 
Hardware
Chinese Famous Brand or German Brand
Seal System: ternary ethylene propylene rubber sealing strip 
Customers' stipulated brands are available

Bunge-Find Glass Walls And Doors Interior Glass Wall Systems From Bunge-1

Solid Glass Partitions Advantages

1.Double or single layers solid glass partitions, easy disassembly, low construction sound, reusable when refurbishing the environment benefits.


2.Super Wire Installation Function to meet the systematical needs of any working places.


3.Solid glass partition can be customized to 3 layers according to different sound-insulation needs. 


4.Adapt to kinds of thickness of glass partitions to provide the best cost performance.


5. Fine structural design, allow glasses to be assembled and disassembled separately ,easy installation.   


6. Profile material use 6063-T5 Aluminum Alloy of which the performance is superior than industrial Aluminum Alloy, it has good hardness and corrosion tolerance, Aluminum alloy frame, durable and stable construction.


7. Special sealing aluminum design offers adjustable function of the solid glass partition.


8. The aluminum bar design between the connection of the double glass produces effect sound insulation


Bunge-Find Glass Walls And Doors Interior Glass Wall Systems From Bunge-2


Fixed Glass Partitions Benefit

1. A certain degree of privacy is achieved.


2. Can reduce the level of communication between staff. 


3. Completely see-through, let in light and display who is in the room.


4. Fixed glass partitions panels provide a very modern and contemporary look, just choose different color of glass or different photos and word on the fixed glass partitions panel.


5. Provide stability and offer a preventative measure to deal with acoustic and visual distractions.


6. Can provide a much better solution than the alternatives, such as permanent study walls or temporary screens.


7. A wise choice to divide up the floor space in an office.


8. Specialized plastic injection channel is set up at angle joint to ensure that the internal and back of the angle joint is sealed effectively, and strengthen the angle.


9. Internal and external continuous glass sealing strip can seal better. 


10. Special angle steel sheet enhances the angle quality of the hanging arm of the frame and fan angle. 

Bunge-Find Glass Walls And Doors Interior Glass Wall Systems From Bunge-3


Our Service

1. OEM Service.


2. Design according to the customers' requirements.


3. 13 years' professional experience in research, manufacturing and marketinging, we have had various kinds of the products,such as the aluminum fixed glass partitions,sliding glass partitions,movable wall,office furniture and some acoustic wall panels. We have our own factory and showroomin Guangzhou,so we can save the mould fees and delivery time for the customer for lots of products.


4. Our morden deep processing center can provide machining such as Cutting, punching, drilling and tapping, etc.

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...