tuscany: villa armena, a country hotel with very urbane rooms - living room partition wall

by:EBUNGE     2019-08-25
tuscany: villa armena, a country hotel with very urbane rooms  -  living room partition wall
The detective at the hotel thought that when he came up from the parking lot, there were some interesting places on the front of the Armenian Villa, but he could not put his finger on it.
Apparently renaissance, but why does it look so singledimensional?
Solved the mystery later that day.
"It was just a facade when we bought it," said Elena focoli, who runs the hotel with her husband Edoardo Giacone.
In fact, it contains more but not more.
Noness, a couple, lives in London and falls in love with it at first sight.
Followed by two years of paperwork, and then two years of construction, the result was a hotel that felt hundreds of years old and cleverly integrated the remnants of the original structure.
Right side of the restaurant-
Hand wall from 1100--
The Brick Court is a bit wavy--
The wine cellar comes from the same year and the ceiling beams follow the original structure.
The 150 cypress trees on the left side of the house were planted in 1800.
Villa a is conveniently located in the convener of Buon
An hour southeast of Siena, at the top of the Mountain (
Below is the view from the hotel).
Nearby are Montalcino and gorgeous Val de Osia.
A bit far from the track in Tuscany, but only 10 rooms, but each has a gem (
The second room below, the classic room, Giovanni di Emilio).
Elena is very talented in interior design, especially in the matching of proportions and fabrics, and is very enthusiastic about quality. (
By the way, if you like this, Elena now has a design studio in Siena and New York. )
While waiting for the bureaucracy to approve the project, Elena travels around Italy looking for small companies that can produce high-quality art and buy antiques.
Therefore, the clawfoot table in Room 4 was made by a family company in Milan, and the super-proportional lamp on the living room floor of suite superior Malavolti (Room 9, below)
From Marche.
The room, especially the bathroom, is one of the most beautiful rooms to see on the Tuscan swing. (
The second is the bathroom of the Angelo Dean Rico suite. )
10 rooms include 3 standard double rooms, 2 junior suites, 4 suites and 1 Superior Suite (room 9)
The most striking bathroom (below).
It reminds us of a small theater.
This is the highlight of the room.
Room 3: one second-
Floor suites with large windows overlooking the valley. The bedroom (below)is classic--
A wall is orange. -
Super bathroommodern.
Room 4: a large double bed with a large window.
There's a walk in the bathroom-
Rain head shower and lime floor.
Room 5: one second-
Floor suite with balcony with a view of the hills behind the hotel.
It was a great room, a spacious living room with an opening in the bedroom and the bed was very comfortable. The step-
There is a ceramic bathtub in the down bathroom, and the back is a lime cube wall with different depth (below)
And walk for two-in shower. Room 6 (below)
The smallest room, but not creative. A semi-
The partition creates a small foyer with a table and a Buddha inside.
The bed makes up most of the bedroom.
Room 7: six reverse: a large bedroom, a small corner with antique love seats and a small library.
The exterior wall of the bathroom is original;
Other walls and floors are made of Tuscan lime scabas. (
Six and Seven connections make it the perfect choice for families. )
Room 8: same feeling as Room 10, right under the roof.
Very large scroll
The armrest sofa makes the space more spacious.
There's a walk in the bathroom-
There is a shower at one end and a bathtub at the other;
The floor is made of a sheet of lime. Room 9 (
Superior Suite (Malavolti)
An ordinary suite with a bathroom reminds you of a small theater.
"This is the most requested room," said Edoardo . ".
Room 10: a spacious double room right under the roof
Room of height, with reclining ceiling, with thick beams and corner with table.
Three steps in the bathroom, very modern: square ceramic bath and walk-
Rain shower with smooth stainless steel rectangular control panel-
Bathroom fixtures as aesthetic objects.
Right under the roof, the windows are small but the overall feel is comfortable introverted. See the vest-
The pockets below have other THD stories from the top Tuscan hotel la campagna.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...