toronto wants condos to have stroller storage, movable walls and shadow-free playgrounds - movable walls for home

by:EBUNGE     2019-08-26
toronto wants condos to have stroller storage, movable walls and shadow-free playgrounds  -  movable walls for home
A year later, the City of Toronto released a new guide to building a vertical community
Study for a long time how families live in high-rise buildings in the city.
The draft guidelines released on Wednesday still require approval from the City Council before they are implemented.
How urban planners try to create more families
Friendly City of Toronto | this is your biggest complaint about living in the City of Toronto. The study focuses on three main areas: neighborhood, building and individual units, focusing on the diversity of housing, livability and quality.
The Community Guide to the Community Guide includes: a ramp on a stroller or bicycle public staircase.
Wider walkways for children under the age of 14.
There is no shadow in the park, open space and playground. Providing Wi-Fi.
Park rides for all age groups. All-
Season playground. Year-
Access to the circular public restroom.
"The intention of these cities --
The broad guidelines are to incorporate the design suitable for the family into the new multiple
The report also focused on planning from a child's perspective.
This guide applies to all new multipleResidential
High-rise building development with 20 or more units.
Guidelines issued for the building Guide include: at least large units;
Including ten per cent of three countries.
Bedroom unit, 15 of the two-bedroom units.
Gather large units together to encourage social activities.
Large unit on lower floor. Wider hallways.
Comfortable space for children and youth. Multi-
Special rooms for toddler play, hand group, Youth Fitness and homework group.
Specific rooms for music classes, food education, tools and "chaotic activities.
The lobby should include space for stroller storage.
Through a series of case studies, the urban planning department identified some of the most prominent problems facing Toronto families in apartments today --
Baby stroller storage and laundry facilities are available at the hotel.
The unit guidelines published in the draft "Growth" report include: Two-
The bedroom should be 969 square feet. Three-
The bedroom should be 1,140 square feet.
The entrance should include a laundry room with sink which can double as a mud room.
The kitchen area is at least 97 square feet.
Including standards-
Large size appliances and large sinks.
The bedroom should not be less than 86 square feet.
Consider movable walls and foldsaway furniture.
Design elements such as wardrobes that can be repositioned.
"Between 2006 and 2016, more than 143,000 new residential units have been built in downtown Toronto, of which 80 are located in larger buildings than fivestoreys," the report wrote . ".
It added that the number of families with children living in high-rise buildings increased by 10,000 in 2011 from 1996.
The guide was developed by city staff in consultation with developers, planners, architects, Toronto families, children and youth, intended as a collection of best practices to describe the "Toronto ideal vision for people of all ages and abilities ".
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...