this spacious loft is in the heart of toronto: home of the week - sliding partition doors

by:EBUNGE     2019-08-09
this spacious loft is in the heart of toronto: home of the week  -  sliding partition doors
Hotel Location: 155 Dahao West Street
Unit 1116 Church and Dundas Sts.
Asking price: $2,299,000 size: over 2,500 square meters. ft.
Parking: two underground spaces, one for Locke's maintenance: $1,749.
Tax 87 per month: $8,029 (2018)
Bedroom: 3 plus 1 bathroom: 4 parts of the converted city center warehouse merchandise loft-
Owned by Sears.
Very spacious, two.
All three bedrooms have a large terrace, two gas fireplaces and en suite bathrooms.
"We asked them to merge the two corner units into our corner penthouse," said owner Gerry lauanski . " He has lived in a suite since 1999.
"The custom metal stairwells and hot tub are all hung into the suite by crane.
The Brazilian walnut hardwood floors and two gas fireplaces make the place very comfortable.
"In addition to the large number of buildings --
Next to the parking lot, our locker is also a full room.
The huge size of the suite and its building
In the sound system, we held up to 100 parties to make the entertainment enjoyable
Plus people . "
"Adjacent to the University of Ryerson means we can walk to most of the amenities but also stay away from the hustle and bustle of Yongji Street.
Laundanski added that he said the building was "very pet friendly ". ”The 13-
The floor building has retail on the main floor and is within walking distance of the Metro, Eaton Center, many shops, restaurants and entertainment.
Amenities include 24-
Concierge service, gym, semi-basketball court, indoor pool, party/meeting room, and public rooftop terrace are available at the hotel.
"Because the suite is custom designed by owners and builders, it's really unique --of-a-kind.
This is an ideal city space for open entertainment.
The main area of the concept and its location at the heart of Toronto.
The apartment has a private roof terrace covering an area of approximately 600 square feet and a hot tub.
Cameron will, the listing agent, said.
The entire suite has high ceilings and bare plumbing, and the front door of the suite leads to the main-
Horizontal foyer with limestone tile floors, wall lights, pot lights, closets and dressing rooms.
Steps to the main living area. Open-
Concept, living room with hardwood floor, track light, gas fireplace with floor-to-
Wood surround ceiling, built in
In the shelves and big windows.
The restaurant features hardwood floors and modern chandeliers-
Stylish lighting and built-in corner
On cabinets and shelves.
There is an adjacent space next to the restaurant, large enough for a large piano.
Kitchen highlights include a built-in island/breakfast bar
On the Wine Rack, granite counter, a large window, frosted glass plug-in on the cabinet door above, hardwood floor, food storage room and built-in-
Stainless steel appliances.
On this main level is the master bedroom with oversized double closets, hardwood floors, modern light fixtures and 5-
Separate bathroom with double vanity.
The second bedroom has hardwood floors, closets and three bedrooms. piece ensuite.
A unique steel staircase leads to the second floor with a built-in study
In desks and cabinets, hardwood floors and sliding partition doors with frosted glass plug-ins.
The third bedroom is on the second floor and can be used as an office or family room.
Spacious with gas fireplace, hardwood floor, track light and two floor wallto-ceiling built-
In shelves and cabinets.
There are three of them.
A sliding partition wall with frosted glass plug-in and a strike leading to the terrace.
Overlooking the city, the rooftop terrace features a full-service dining area and a seating area.
The dining area is partially covered with exposed brick walls, built in-in planter.
There is a glass railing on the terrace, a concrete tile floor and a built in on the stepsin, six-person hot tub.
The apartment has two underground parking spaces and a large dressing room.
To find out about this property, please contact Listing agents: Cameron Weir and Fuji Duong, a WEIR team brokerage
Brokerage, 647-531-3313; www. TheWEIRTeam. ca.
This week's home was written by Alison harness, a freelance writer in Toronto.
Real Estate Writer.
Despite our efforts to provide state-of-the-art productsto-
Date information, we cannot guarantee the listed features.
Please contact the realtor.
To submit materials to this week's home, please email soldhome @ rogers. com.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...