the project: off the wall - partition wall cost

by:EBUNGE     2019-08-14
the project: off the wall  -  partition wall cost
What are the benefits?
Installing wall lights includes chasing wires and redecorating, and the larger size of the building salvage helps cover up any repositioning of the wires. Well-
Selected salvage pieces can be doubled as artwork
Usually in a fraction of the cost
And create an unusual feature.
What do I need to consider before I go ahead?
These lights are more decorative than practical.
Only use them as mood lighting.
Consider the weight of the object of your choice: Although the grain screen is light and can be fixed on the partition wall, the heavy balcony grille should be fixed only on the supporting wall (
Concrete or brick).
Is this a DIY job? Yes.
What materials do I need?
Looking for a building salvage or something interesting.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...