room divider from louvered bi-fold doors - room divider wall with door

by:EBUNGE     2019-08-31
room divider from louvered bi-fold doors  -  room divider wall with door
The house is small and can see the whole from the entrance and living area (albeit tiny)
The kitchen, and the side of the huge fridge, as well as the food on it.
I have some old blinds.
Stacked doors in my garage so I decided to turn them into room partitions.
Really no.
A thick coat of bright paint was applied to the door, so I ground it off.
I removed the knob and repaired the hole with sheetrock putty.
I removed the middle hinges from each door and put them in the middle to connect them. (
Be sure to do it on the opposite side, so it's tortuous
Instead of making a box. )
I painted the door and put it together.
Here are some photos taken before and after the area.
I hope it will inspire some people.
As always, thank you for any comments, ratings, etc.
Thank you for your attention.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...