off the wall - partition wall cost

by:EBUNGE     2019-08-14
off the wall  -  partition wall cost
What is the project?
Use the building salvage or other unusual objects as wall lights.
A French balcony grille and a large grain sieve are shown in the photo, which turns into decorative lights.
What are the benefits?
Installing wall lights includes chasing wires and redecorating, and the larger size of the building salvage helps cover up any repositioning of the wires. Well-
Selected salvage pieces can be doubled as artwork
Usually in a fraction of the cost
And create an unusual feature.
What do I need to consider before I go ahead?
These lights are more decorative than practical.
Only use them as mood lighting.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...