Look to the glamour of the silver screen - interior dividing wall

by:EBUNGE     2019-08-13
Look to the glamour of the silver screen  -  interior dividing wall
Alexander Lauster is a master craftsman who built many red buildings
Brick houses in Glasgow and de la Condra.
His meticulous attention to detail is evident in the house he built, and the 26 Crescent villas are no exception.
On the right side of the entrance hall are two large reception rooms connected to each other, which retain many of the original features, such as ceiling corn flour and stained glass windows.
Behind the ground floor is a kitchenette and separate breakfast room that leads to the garden.
Here, the layout can be done by review.
These rooms can be opened to create a large open space
Direct access to the kitchen and dining space in the garden.
The garden is south-
Facing and very private.
There is a lot of space to create an outdoor paradise, with a botanical garden at the doorstep, and you don't have to travel far for inspiration.
There are three bedrooms on the first floor with fireplaces.
There is a bathroom and separate toilet, which can be easily converted into a large family bathroom by removing the partition.
Some updates can be made to the interior of the house.
With so many period features proving the era of real estate, I tend to re-invent some of the charm of the era of house building.
Think of Scott fitzgerrard, cruise ship and screen.
All 16 wallpapers in Cole and Son's vintage charm collection evoke exquisite designs in the mid-20th century.
Their Belgravia wallpaper reminds people of the set of Noel koward theater, with the elegant winding ribbon design on the leather textured background exudes refinement (www. cole-and-son. com).
When buying furniture for this look, look for boutiques instead of large retail showrooms like Shaw Lane Cavey, near Bath Avenue Dublin, which stock up from Philippe Hurel) all kinds of furniture, fabrics, lamps and accessories with such names (www. cavey. ie).
Bob and Kate's of Co Kildare Clane are a shopping mall with furniture, household items and soft decoration (www. bobandkates. com).
Watsham & Bohn in Monkstown has designed its own furniture collection and has stocked up many leading brands (www. watshamandbhon. com).
Combine the texture pattern with the color to create an almost dramatic look.
This look is about mixing that doesn't necessarily match.
As Mr Coward said, "all goes well ".
Internal @ independent. ie
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...