light-filled loft with a view in corktown - room partition wall

by:EBUNGE     2019-08-18
light-filled loft with a view in corktown  -  room partition wall
Hotel Location: 51 Trolley Cres.
Unit 404 King Street. E. and River St.
Asking price: $659,900 size: about 1,025 square meters. ft.
Parking: an underground space, one with a Locke maintenance fee: $509.
52 taxes per month: $3,542 (2014)
Bedroom: 2 plus 1 bathroom: Part 2 bonus-winning, four-phase urban-
Contemporary apartment community known as River City
Named after the river near Toronto. —
The building is located west of the Tang River at the junction of King Street. E.
United with the QueenE. The loft-
Style Suites is located on the fourth floor, near the town of Cork in Toronto West tanglands.
It has two bedrooms, two bathrooms and a study room.
"West Don is one of the newest neighborhoods in Toronto.
River City is a beautifully designed Riverside LEED Gold community focused on environmental sustainability and great design, "said Robin Pope, a listing agent.
"It is only a short walk from the King and Queen Street car, 18-
Acre city park in the Corktown public area.
The hotel is within walking distance of river, Leslie Ville, wine factory and St.
Lawrence market and financial district.
"In addition, the area will soon be home to the village of movement for the Pan Am Games," the pope added . ".
The "apartment suit" is a notable example of light and space.
It was designed by acclaimed Saucier Perotte architects.
The unit has three exposures.
North, east and south, with an area of about 1,025 square meters. ft.
Indoor space and 149 square feet of outdoor space.
"Highlights include walnut hardwood floors and 9-
Exposed to the concrete ceiling of the ground.
Modern kitchen with large island, stainless steel appliances, Caesar stone countertop, back
Painted glass tailgate and valance lighting. The spa-
Custom inspired bathroom
"The Vanity, vanity mirror, tile floor and complete wall brick cladding are designed," said Pope . ".
On either side of the nearby Queen Street
There are convenient restaurants, shops and cafes in the hotel. E.
The amenities in the building include 24-
All the necessary facilities, including hour concierge service, suite, gym, swimming pool, party/conference room, and tourist parking lot, are available for guests.
The foyer features hardwood floors and a double coat room.
Access to the laundry area and three from the foyer
The bathroom comes with a ceramic floor and a modern vanity.
Spacious living room combined with dining room with hardwood floor-to-
Ceiling windows across the width of the unit and a strike leading to the balcony.
Open to the living room/dining room is irregular-shaped den.
The space is separated from the main living area by two concrete pillars.
Hardwood floors and floors-to-Ceiling windows.
Stainless steel appliances in kitchen
Including a built-in
Dishwasher and built in
In the microwave.
Hardwood floors, island/breakfast bar, rail lights, underground
Cabinet light and Caesar stone counter.
Strike with balcony and floor wall-to-
Ceiling windows, the master bedroom has a hardwood floor, a double wardrobe and a three-
The suite features a bathtub, tile floor, pot light, and a stand-alone shower with frameless glass.
Considering privacy and spaciousness, the master bedroom has a sliding, built-in
In the partition wall where part of the bedroom can be exposed to the living room.
The second bedroom features a double wardrobe and hardwood floors.
The unit also includes an underground parking space and a locker.
See this property Contact List agent Robin Pope, Pope Real Estate Limited, Brokerage, 416-479-0712; www. poperealestate.
Although we are trying to provide state-of-the-art servicesto-
Date information, we cannot guarantee the listed features.
Please contact the realtor for the latest details.
To submit a week's submissions to the house, please email soldhome @ rogers. com .
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...