Interiors: Shelf life - inspirational bookcases - room divider wall

by:EBUNGE     2019-07-17
Interiors: Shelf life - inspirational bookcases  -  room divider wall
I grew up in a bookstore.
There is a bookshelf in each room except the bathroom (
Because humidity is bad for books).
All the bookcases are very low.
Lay, firm, and lay against the wall.
There is no space on their shelves.
When we ran out of bookshelves, we bought a new one.
Fortunately, this is a big house.
I admit it's a weird way of life.
It's better to put your book around you instead of arranging yourself around your book, and modern bookworms have found better ways to manage their habits.
On the one hand, the number of people has decreased.
The book has not yet become a niche object like vinyl, but the growth of electronic reading devices has undoubtedly reduced the burden on our bookshelves.
There is also a tendency to separate book storage from presentation.
People with a large number of books tend to hide them in the office at home, while some of the selected books are shown.
"The word bookcase will take you to one-
"The size view of what that piece of furniture can do," said Michael Connolly of Lomi Design . ".
"Shelf units are as flexible as the objects you want to display.
This may include books or artwork, and even your precious Lego model kit for the Millennium Falcon.
People use them to express their personality.
"He also suggested that some of the shelves be left empty, as this has drawn attention to the design of the unit itself.
Once your entire library is no longer difficult to accommodate, a beautifully designed bookcase has great potential.
Traditional location of the bookshelf against the wall, but free
Standing bookcases can help solve the problem of how to divide openingsplan space.
Interior architect Lorraine Stevens (below), explains.
What people buy is public.
Plan the house as this is what you are doing now, but it is difficult for them to provide the house. "She said.
"They moved all the furniture into the corner with a large uncomfortable space in the middle.
They don't realize that you need to split the space into rooms if you don't use the walls.
"The Open Shelf breaks the inner space like the inner wall, but, you have a nice and practical piece of furniture, not a large piece of gypsum board," Connolly added . ".
He again pointed out that it would work best if there were not too many items in the room partition.
He also suggests that you think carefully before investing in a large piece of furniture.
"People rushed to buy a shelf unit but didn't take into account the impact it would have on the building.
"In order to meet the storage needs, we spent a lot of time solving the problems caused by impulsive purchases.
"There is also a problem with cheap shelves.
"If it's going to be used as a storage item, then it needs to have some structural integrity.
"Lomi Design is a supplier of high-end productsend (
So quite expensive)
Italian brand, Polada.
From the sturdy walnut Bible bookcase (€6,815)
In the Myria bookcase system, there are also walnuts with smoked glass shelves (from €4,000).
It can be ordered as a unit, or it can be combined into multiple units to create a partition between the houses.
Domino system (from €2,900)
Consisting of a glass box hanging on a metal rod from the floor to the ceiling, must be installed on the building.
Once in place, the box can be turned to change the light and traffic flow within the space.
Not spectacular but more expensive
The effective Jesse series of modular bookcases starts about 1,500 euros, while jigsaw bookcases and room partitions start at 2,657 euros for Lomi Design.
In the lower priced bracket, the polygon unit designed by Luca Stepan consists of curved gray veneers bent into a series of polygons.
It is gray or white and will be a lovely room partition.
The only downside is that the bookshelf is not the ideal shape of the book, so there is a powder coated steel book block on the shelf.
Delivery is not included and assembly is required at a cost of approximately € 388.
Another attractive free
Darcey is a standing unit designed by Steuart Padwick.
The units gradually become thinner, and the shelves of one of the color options gradually change from dark gray below to white on the top.
It takes about 27 euros.
Both of them broke the internal space well, but neither had a huge storage capacity.
If you are a book lover, you may still be wondering how to deal with your book.
Mine is the Billy bookcase in the Home Office, a cheap Ikea classic that works according to tin cans.
I am also flirting with the concept of Booken bookcase, which was designed by the original edge design studio and provided by Go modern furniture.
The idea is that you can show your books instead of hiding them and having them hang down so that the spine will gather together to form a side table.
It's a quirky idea, but I don't believe it's good for books.
It is also expensive and expensive.
Attractive paper chip shelf system (€225)
More affordable.
Made in Sweden by Pellington Design, bright-
Color wall tiles and transparent Perspex shelves that can be repositioned.
It won't hold a lot of books, but it's hard not to like this pleasant versatility.
For more information about products on this page, see lomi. ie, made. com, gomodern. co.
Pellingtondesign, UK.
Com and 4 life. co. uk. Indo Property
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...