how to hang a room divider on an angled ceiling - room divider partition wall

by:EBUNGE     2019-09-06
how to hang a room divider on an angled ceiling  -  room divider partition wall
Turn a large room into two separate spaces with room partitions.
Hanging curtains from the ceiling as a partition of the room not only separates the two spaces, but also increases the interest in the decoration of the room.
Don't be afraid if the room you want to separate has a sloping ceiling;
With ceiling mount curtain rods, hardware, and curtains, you can create a fully functional, attractive room partition.
Measure the distance from one side of the room to the other through the ceiling.
Purchase a ceiling mount curtain rod kit equal to the length of the room with a ceiling mount bracket.
Decide where you want to hang the room partition.
Mark along the ceiling with a fine
Tilt marks indicating the installation position of the curtain rod bracket.
On both sides of the ceiling, make a mark near the wall, and make a mark in the middle of the ceiling.
Screw the anchor into the ceiling.
Screw the anchor into each mark.
The anchor will help to securely attach the curtain rod and curtain room partition to the ceiling.
Install the bracket of the ceiling bar onto the anchor that screws into the ceiling.
Fix the curtain rod on the bracket.
Determine what size of curtain to use.
Measure the distance from the curtain rod to the floor.
Purchase curtains equal to the length of the curtain rod and the distance from the rod to the floor.
Remove the curtain rod from the bracket.
Put the curtains on the curtain rod.
Put the curtain rod back on the bracket.
Arrange the curtains.
Pull the curtains open and leave them straight on the rod.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...