DROGHEDA PLANNING - temporary partition wall with door

by:EBUNGE     2019-08-22
DROGHEDA PLANNING  -  temporary partition wall with door
DROGHEDA Borough Council received the following planning applications for 03/12/10 to 31/12/10: Derek Murphy, above the existing boundary wall of Murphy's public house, 12 Thomas Street, drogheda.
Patrick Carolan's home garage at the back of the existing residence includes all related site works at Drogheda 176 forest park.
John Samson in the new store (max. height 3. 27m. )
On the first floor of 32 Peter Street Drogheda, sign signs, sun shades and rolling doors, internal partitions and doors are combined.
Junior NS of BOM St John, a temporary dormitory building in the east of the school, housing No. 1
Classroom and classroom 4
Tuition fees for special education (
Total area of 160 square meters. m. )
Including foul and surface water connections with existing trunk lines and paths, and increased access at St John's junior NS, Rathmullen, Drogheda.
Pat Owens carries out a rear stretch and a 1st-story extension at 3 Fountain villas in Mell Drogheda, including lifting the existing roof and all related site works.
God Church charity trust fund extension 05/135-
The development of a church ranging from 2 to 4 floors, consisting of a church center that can accommodate up to 1008 customers, and the Church College and the Bible research center consist of 8 classrooms, the library and classroom of the restaurant facilities are available.
Central Circular Hall from grdfl. with 1st fl.
National Office of the Church of God with assoc.
Meeting room, rooftop garden and in-house meeting room in 2nd fl.
Top floor and penthouse meeting/meditation room in 3rd fl.
The level of the Assoc contained in the function tower.
Pk and parking spaces of multi-storey vehicles on the ground floor (
(222 parking spaces in total)
With 2 coach pk spaces, it is proposed to build a right turn facility from Ballymakenny Rd to remove a habitable hse and number 3
2 Story block leading to the front and back of the site with assoc site works and landscaping at whitethhse on Drogheda Ballymakenny Road.
Drogheda BoroughCouncil has approved the following planning application: scholar townhouse hotel for renovation of the kitchen, including the roof of the existing exterior yard (c. 13 sq. m. )
Single Layer Extension (c. 9 sq. m. )
And added access to the outside yard.
All works are protected structures (DB-110)
King Street in derhoida
1 point Malachi McGrann
Changes to the use of the Extg section.
House called No
48 retail units. Demolish extg.
Extension at the back of the residence, construction of new single storey retail area and 2-
The floor extends to the side, the office floor is 1st floors, and the ridge height is increased by 2-
The storey section with assoc.
Including altitude correction
New exterior mounting signs on the front. 2.
Remove some of the existing stores to the rear of exg.
Retail store called No
47. build new single-storey roofs in existing stores and in the COU to retail area.
Modified to layer 1st, including
Part of Extg.
The 1st-storey house is called the first.
48 access to storage area, office and staff area.
Ridge height increase 2-
The storey section with assoc.
Including altitude correction
New exterior signs are installed on the front and side of Drogheda Beamore Road 47 and 48.
Blackstone Motor Co. , Ltd. changed the use of the ground floor part from industrial/warehouse/wh olesale retail to car sales, and will also include the renovation of the existing building facade with an expansion area of 194 square metersm.
On the west side of the existing building, advertising flags, totem signs, signs installed on the façade along the southern border, the new Paladin border fence, and development of all affiliated websites.
Engineering and service at Newgrange Business Park, Drogheda Dono Road.
Ian Griffin and Jessica Matthews tear down a small lean car
Extend, fall off and separate the prefabricated garage to the rear of the site and build a new double
Side and rear floors extend, living areas have partially flat roofs, new vehicle access, alterations to existing houses in drogheda 21 Legavoureen Park, new windows and roof lights/solar tunnels are included as well as all related site works.
Drogheda Borough Council received the following invalid planning application: Patrick Carolan, to include all related site works at Drogheda 176 forest park in the home garage behind the existing residence.
Drogheda Borough Council received more information/verified the following planning application: Ian Griffin and Jessica Matthews demolished a small Lean Building
Extend, fall off and separate the prefabricated garage to the rear of the site and build a new double
Side and rear floors extend, living areas have partially flat roofs, new vehicle access, alterations to existing houses in drogheda 21 Legavoureen Park, new windows and roof lights/solar tunnels are included as well as all related site works.
David Donigan
The filling layer extension of the commercial building includes the relocation of an additional 15 square feet of office. m.
Office space plus additional storage area, with a total area of 387 square feet. m.
And 4 square feet. m.
Logo of Drogheda Mell cement road.
Alan and norlene Clark.
The storey side and rear extension of the existing residence at 14 Creveen Terrace, Drogheda North Road.
Irish Spice Co. , Ltd. for the retirement and removal of production elements from the site to the IFF plant (
Factory bld and assoc.
Facilities to be retained)
External includes :-
Covered bulk storage tanks, covered bicycle storage sheds, gas cylinder storage cages, barrel roller rails and shelves, empty bucket storage compounds, comp machines, external metal stairs attached to bulk storage tanks, backup generators and related services and equipment. Internally:-
Includes covered bulk storage tanks for storage tanks and machinery, internal partitions, 1st flr mezzanines and support systems and additional services, barrel roller rails and shelf systems, production machinery, auxiliary production machinery, production related all devices and related services for circuits and related equipment, related processing units and assoc.
Equipment and services, laboratory fixtures, accessories and related services, all kitchen fixtures and related services in Drogheda Donore industrial zone.
Bord Pleanala made the following planning appeal decision: Gerard Shevlin, 32 Castlewood, Drogheda, demolition of 2 existing houses, construction of 2 and 3-
Floor nursing homes with 60 residential beds, underground parking for 50 parking spaces, plus 4 additional spaces on the first floor, and all related site development works on Drogheda Rathmullan Road.
A conditional decision
Gillian Moran requested an increase from 6 children to 8 children and provided the relevant site works and parking lots, including modifications to the parking lot of the adjacent Roschoill visitors.
There will be no change in the pre-session related existence time
School facilities at No. 45, Roschoill caircourt court, Drogheda Dublin Road.
A conditional decision
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...